[1] 刘敏, 蒋一博, 林安, 等.架空地线的腐蚀研究现状 [J].材料保护, 2018, 51(9): 89-93.DOI:  10.16577/j.cnki.42-1215/tb.2018.09.019.

LIUM, JIANGY B, LINA, et al.Research status of corrosion for overhead ground wire [J].Materials Protection, 2018, 51(9): 89-93.DOI:  10.16577/j.cnki.42-1215/tb.2018.09.019.
[2] 叶建锋, 邓德发, 张明, 等.某输电线路地线腐蚀情况分析及寿命评估 [J].湖北电力, 2020, 44(2): 47-51+106.DOI:  10.19308/j.hep.2020.02.008.

YEJ F, DENGD F, ZHANGM, et al.Corrosion analysis and life assessment of ground wire of a certain transmission line [J].Hubei Electric Power, 2020, 44(2): 47-51+106.DOI:  10.19308/j.hep.2020.02.008.
[3] 吴雪峰.锈蚀钢绞线力学性能和粘结性能研究 [D].长沙: 中南大学, 2014.

WUX F.Research on mechanical properties and bonding perforrmance of corroded prestressing steel strand [D].Changsha: Central South University, 2014.
[4] 叶忠明.锈蚀钢绞线力学性能试验研究 [D].重庆: 重庆交通大学, 2016.

YEZ M.Study on the test of mechanical properties of corroded steel strand [D].Chongqing: Chongqing Jiaotong University, 2016.
[5] 郑亚明, 欧阳平, 安琳.锈蚀钢绞线力学性能的试验研究 [J].现代交通技术, 2005, 2(6): 33-36.DOI:  10.3969/j.issn.1672-9889.2005.06.009.

ZHENGY M, OUYANGP, ANL.Study on the test of mechanical properties of corroded steel bar embedded in concrete [J].Modern Transportation Technology, 2005, 2(6): 33-36.DOI:  10.3969/j.issn.1672-9889.2005.06.009.
[6] 张明, 余建飞, 詹约章, 等.500 kV输电线路架空地线腐蚀断裂原因分析 [J].湖北电力, 2014, 38(12): 39-42.DOI:  10.19308/j.hep.2014.12.012.

ZHENGM, YUJ F, ZHANY Z, et al.Analysis on cause of corrosion fracture of overhead ground wire in 500 kV transmission line [J].Hubei Electric Power, 2014, 38(12): 39-42.DOI:  10.19308/j.hep.2014.12.012.
[7] 李相栋.窑厂对500 kV线路架空地线腐蚀情况的分析及处理 [J].电力安全技术, 2015, 17(4): 46-48.DOI:  10.3969/j.issn.1008-6226.2015.04.014.

LIX D.Analysis and treatment of corrosion of overhead ground wire of 500 kV transmission line in kiln factory [J].Electric Safety Technology, 2015, 17(4): 46-48.DOI:  10.3969/j.issn.1008-6226.2015.04.014.
[8] 张建, 云俊斌, 余俊伟, 等.特高压输电线路工程同档带电跨越两条220 kV电力线施工方法 [J].电力学报, 2018, 33(2): 165-170.DOI:  10.13357/j.cnki.jep.002711.

ZHANGJ, YUNJ B, YUJ W, et al.Study on construction method of two 220 kV power lines spanking with ultra-high volta-ge DC line project [J].Journal of Electric Power, 2018, 33(2): 165-170.DOI:  10.13357/j.cnki.jep.002711.
[9] 张建, 由静, 赵建文, 等.特高压输电线路工程中特殊跨越的研究与应用 [J].智慧电力, 2018, 46(7): 75-79.DOI:  10.3969/j.issn.1673-7598.2018.07.013.

ZHANGJ, YOUJ, ZHAOJ W, et al.Research and applicationof special crossing in UHV transmission line project [J].Smart Power, 2018, 46(7): 75-79.DOI:  10.3969/j.issn.1673-7598.2018.07.013.
[10] 黄金领, 王元军, 韦佩才, 等.500 kV线路旧地线张力更换断裂原因分析 [J].广西电力, 2021, 44(1): 87-94.DOI:  10.16427/j.cnki.issn1671-8380.2021.01.015.

HUANGJ L, WANGY J, WEIP C, et al.Analysis of fracture causes of old grounding line replacement under tension force ina 500 kV transmission line [J].Guangxi Electric Power, 2021, 44(1): 87-94.DOI:  10.16427/j.cnki.issn1671-8380.2021.01.015.
[11] 国家能源局.电力建设安全工作规程 第2部分: 电力线路: DL 5009.2—2013 [S].北京: 中国电力出版社, 2013.

National Energy Administration.Code of safety operation in power egnineering construction.Part 2: power transmission line: DL 5009.2—2013 [S].Beijing: China Electric Power Press, 2013.
[12] 国家能源局.跨越电力线路架线施工规程: DL/T 5106—2017 [S].北京: 中国电力出版社, 2017.

National Energy Administration.Operation code of cross power transmission line in installing the conductor: DL/T 5106—2017 [S].Bei-jing: China Electric Power Press, 2017.
[13] 国家能源局.110 kV~750 kV架空输电线路张力架线施工工艺导则: DL/T 5343—2018 [S].北京: 中国电力出版社, 2018.

National Energy Administration.Construction technology guidance for tension stringing of 110 kV~750 kV overhead transmission line: DL/T 5343—2018 [S].Beijing: China Electric Power Press, 2018.
[14] 李文斌, 陈亦, 李晓斌, 等.输电线路带电跨越封网施工用绳索的选型算法 [J].南方能源建设, 2019, 6(4): 137-143.DOI:  10.16516/j.gedi.issn2095-8676.2019.04.022.

LIW B, CHENY, LIX B, et al.Selection algorithm of ropes for power transmission lines crossing the sealing network [J].Southern Energy Construction, 2019, 6(4): 137-143.DOI:  10.16516/j.gedi.issn2095-8676.2019.04.022.
[15] 陈志.500 kV输电线路架设跨越220 kV电力线施工技术 [J].企业科技与发展, 2019(10): 38-40.DOI:  10.3969/j.issn.1674-0688.2019.10.017.

CHENZ.Construction technology of 500 kV transmission line spanning 220 kV power line [J].Sci-Tech & Development of Enterprise, 2019(10): 38-40.DOI:  10.3969/j.issn.1674-0688.2019.10.017.
[16] 骆正荣, 许一咏.500 kV三荆线烟灯坡长江大跨越架线施工 [J].江西电力, 2015, 39(6): 64-66+71.DOI:  10.3969/j.issn.1006-348X.2015.06.026.

LUOZ R, XUY Y.The stringing construction of 500 kV line crossing the Yangtze River in Yandengpo [J].Jiangxi Electric Po-wer, 2015, 39(6): 64-66+71.DOI:  10.3969/j.issn.1006-348X.2015.06.026.