[1] AECL Reactor Development Business Unit. CANDU 6 Program Team, CANDU 6 Technical Summary [R]. 2005.
[2] NITHEANANDAN T, BROWN M J. Backup and Ultimate Heat Sinks in CANDU Reactors for Prolonged SBO Accidents [J], Nuclear Engineering and Technology, 2013,45(5):589-595.
[3] PETOUKHOV S M, MATHEW P M. MAAP4-CANDU Analysis of a Generic CANDU 6 Station: Preliminary Results for a Large LOCA Scenario [R]. NRC ML031340679,2003.
[4] WAHBA N N,KIM Y T,LIE S G,et al, Consequence Analysis of Core Damage States following Severe Accidents for the CANDU Reactor Design [R]. OPG,2003.
[5] BLAHNIK C,KIMC S,NIJHAWAN S M,et al. Modular Accident Analysis Program for CANDU Reactor [C]. Proceedings of 12th Annual Conference,Canadian Nuclear Society,Saskatoon,Saskatchewan,Canada,1991:9-12.
[6] IAEA. Analysis of Severe Accidents in Pressurized Heavy Water Reactors [R]. IAEA-TECDOC-1594, VIENNA,2008.
[7] IAEA. Severe Accident Management Programs for Nuclear Power Plants [R]. IAEA Safety Guide No.NS-G-2.15, VIENNA,2009.
[8] ROBERT J L. Westinghouse Owners Group Core Damage Assessment Guidance [R]. WCAP-14696-A,Westinghouse Electric Company LLC,1999.
[9] WAHBA N N,KIM Y T,PETHERICK P M,et al. Timing of Core Damage States Following Severe Accidents for the CANDU Reactor Design [C]. 17th Annual Canadian Nuclear Society Conference, Fredericton, New Brunswick, 1996.
[10] 佟立丽,曹学武,袁凯,等. CANDU堆核电厂全厂断电始发严重事故进程研究 [J]. 原子能科学技术,2010,44(11):1361-1365.

TONG Lili, CAO Xuewu, YUAN Kai,et al. Severe Accident Progression Analysis Induced by Station Blackout for CANDU Station [J]. Atomic Energy Science and Technology,2010,44(11):1361-1365.
[11] 申森. CANDU堆核电厂严重事故分析研究 [J]. 核动力工程,2003,24(6):13-15, 69.

SHEN Sen. Analysis and Study of Severe Accidents in CANDU Nuclear Power Plant [J]. Nuclear Power Engineering,2003,24(6):13-15, 69.