[1] KOCHH. Gas insulated transmission lines(GIL) [M]. Chichester,United Kingdom:Wiley-IEEE Press,2012:33-38.
[2] 范建斌. 气体绝缘金属封闭输电线路及其应用 [J]. 中国电力,2008,41(8):38-43.

FANJ B. Application of gas-insulated metal-enclosed transmission line [J]. China Electric Power,2008,41(8):38-43.
[3] 陈轩恕,胡毅,辛耀中,等. 高压长距离压缩空气绝缘输电线路的发展前景 [J]. 高电压技术,2009,35(12):3137-3142.

CHENX S, HUY , XINY Z, et al. Prospect of high voltage long distance compressed-air insulated transmission lines [J]. High Voltage Engineering,2009,35(12):3137-3142.
[4] 李鹏,李志兵,孙倩,等. 特高压气体绝缘金属封闭输电线路绝缘设计 [J]. 电网技术,2015,39(11):3305-3312.

LIP , LIZ B, SUNQ, et al. Research on insulation design of UHV gas-insulated metal-enclosed transmission line [J]. Power System Technology, 2015,39(11):3305-3312.
[5] 李鹏,颜湘莲,王浩,等. 特高压交流GIL输电技术研究及应用电网技术 [J]. 2017,41(10):3161-3167.

LIP,YANX L,WANGH, et al. Research and application of UHVAC gas-insulated transmission line [J]. Power System Technology, 2017,41(10):3161-3167.
[6] 冯士刚. 气体绝缘金属封闭输电线路(GIL)敷设方式的研究 [J]. 电工技术,2016(8):84-86.

FENGS G. Research on laying method of gas insulated metal-enclosed transmission line (GIL) [J]. Electrical Technology, 2016,(8):84-86.
[7] 国家能源局. 气体绝缘金属封闭输电线路技术条件:DL/T 978—2018 [S]. 北京:中国电力出版社,2018.

National Energy Administration. Specification for gas-insulated metal-enclosed transmission line: DL/T 978—2018 [S]. Beijing: China Electric Power Press, 2018.
[8] 庞庆平,郭煜敬,金光耀,等. 1 100 kV SF6气体绝缘金属封闭输电线路关键技术 [J]. 高压电器,2017,53(8):34-37+42.

PANGQ P,GUOY J ,JING Y, et al. Technology of 1 100 kV SF6 gas-insulated metal-enclosed transmission line [J]. High Voltage Apparatus,2017,53(8):34-37+42.
[9] 中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会. 高压开关设备和控制设备的抗震要求:GB/T 13540—2009 [S]. 北京:中国标准出版社,2009.

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of China. Seismic qualification for high-voltage switchgear and controlgear: GB/T 13540—2009 [S]. Beijing: China Standard Press, 2010.
[10] 吴小峰,孙启国,狄杰建,等. 抗震分析反应谱法和时程分析法数值仿真比较 [J]. 西北地震学报,2011,33(3):275-278+304.

WUX F, SUNQ G, DIJ J, et al. Comparison of numerical simulation between response spectrum analysis and time history analysis [J]. Northwestern Seismological Journal, 2011, 33(3): 275-278.
[11] 梁君,赵登峰. 模态分析方法综述 [J]. 现代制造工程,2006(8):139-141.

LIANGJ, ZHAOD F. et al. Summary of the model analysis method [J]. Modern Manufacturing Engineering, 2006(8): 139-141.
[12] 李庆民,李伯涛,王健,等. 气体绝缘金属封闭输电线路地震响应的薄弱部位及其响应规律 [J]. 高电压技术,2015,41(5):1437-1445.

LIQ M , LIB T , WANGJ, et al. Weak parts of gas insulated transmission line under seismic response and its response regularity [J]. High Voltage Engineering,2015,41(5):1437-1445.
[13] 国家质检总局. 电力设施抗震设计规范:GB 50260—2013 [S]. 北京:中国计划出版社,2013.

State Administration of Quality Supervision. Code for seismic design of electrical installations: GB 50260—2013 [S]. Beijing: China Planning Press, 2013.
[14] CHAKIRA,KOCHH. Seismic calculations of directly buriedgas-insulated transmission lines(GIL) [C]∥Anon.Transmission and Distribution Conference and Exhibition 2002,[S.l.],2002.[S.l.]: IEEE/PES, 2002:1026-1029.