[1] 许江风. 中国能源体制革命关键:城市主导能源集成规划 [J]. 南方能源建设,2019,6(3):29-31.

XUJ F. Intergrated energy planning with urban leading is the key of energy system revolution in China [J]. Southern Energy Construction,2019, 6 (3): 29-31.
[2] 李荣昌. 电力体制改革背景下的电力系统规划设计思路 [J]. 山东工业技术,2018(16):178-179.

LIR C. Thinking on power system planning and design under the background of electric power system reform [J]. Industrial Technology of Shandong, 2018 (16): 178-179.
[3] 南方能源监管局. 广东电力市场运营基本规则(征求意见稿)[S]. 广州: 南方能源监管局, 2018.

Southern Energy Regulatory Authority. Basic rules for operation of Guangdong power market (Draft) [S]. Guangzhou: Southern Energy Regulatory Authority, 2018.
[4] Energy Policy and Planning Office. Thailand power development plan 2015—2036 [R/OL]. (2015-05-06) [2021-01-29]. http://www.eppo.go.th/index.php/en/policy-and-plan/en-tieb/tieb-pdp.
[5] 侯孚睿,王秀丽,锁涛,等. 英国电力容量市场设计及对中国电力市场改革的启示 [J]. 电力系统自动化, 2015, 39(24):1-7.

HOUF R, WANGX L, SUOT, et al. Capacity market design in the United Kingdom and revelation to China’s electricity market reform [J]. Automation of Electric Power Systems, 2015, 39 (24): 1-7.
[6] 澳大利亚能源市场委员会. 澳洲电力法:版本113 [S]. 悉尼:澳大利亚能源市场委员会,2018.

The Australian Energy Market Commission. National electricity rules: version 113 [S]. Sydney: AEMC, 2018.
[7] 澳大利亚TransGrid. 输电网年度规划报告 [R/OL].(2018-06-30)[2021-01-29].https://www.aer.gov.au/networks-pipelines/guidelines-schemes-models-reviews/transmission-annual-planning-report-guidelines. https: //www.aer.gov.au/networks-pipelines/guidelines-schemes-models-reviews/transmis sion-annual-planning-report-guidelines

Trans Grid Australia. Transmission annual planning report [R/OL]. (2018-06-30)[2021-01-29].https: //www.aer.gov.au/networks-pipelines/guidelines-schemes-models-reviews/transmis sion-annual-planning-report-guidelines. https: //www.aer.gov.au/networks-pipelines/guidelines-schemes-models-reviews/transmis sion-annual-planning-report-guidelines
[8] 澳大利亚能源市场运营商. 集成电力系统规划报告 [R/OL]. (2018-07-17)[2021-01-29]. https://www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan. https: //www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan

Australian Energy Market Operator. Integrated system plan [R/OL]. (2018-07-17)[2021-01-29].https: //www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan. https: //www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan
[9] 美国输电规划委员会. 2017年PJM地区输电规划扩展 [R/OL].(2018-08-23)[2021-01-29]. https://www.pjm.com/library/reports-notices/rtep-documents/2017-rtep.aspx. https: //www.pjm.com/library/reports-notices/rtep-documents/2017-rtep.aspx

Transmission Planning Commission of America. 2017 PJM regional transmission expansion plan [R/OL]. (2018-08-23)[2021-01-29].https: //www.pjm.com/library/reports-notices/rtep-documents/2017-rtep.aspx. https: //www.pjm.com/library/reports-notices/rtep-documents/2017-rtep.aspx
[10] 美国输电规划委员会. PJM手册14B:PJM地区输电网规划流程[R/OL].(2018-08-23)[2021-01-29]. https://www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/transmission-planning. https: //www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/transmission-planning

Transmission Planning Commission of America. PJM manual 14B: PJM region transmission planning process [R/OL]. (2018-08-23) [2021-01-29].https: //www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/transmission-planning. https: //www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/transmission-planning
[11] 加利福尼亚独立电力系统运营商委员会. 2017—2018输电规划 [R/OL].(2018-05-22) [2021-01-29]. http://www.caiso.com/Documents/Final2017-2018StudyPlan.pdf. http: //www.caiso.com/Documents/Final2017-2018StudyPlan.pdf

California Independent Power System Operators Committee. 2017—2018 transmission planning [R/OL]. (2018-05-22)[2021-01-29].http: //www.caiso.com/Documents/Final2017-2018StudyPlan.pdf. http: //www.caiso.com/Documents/Final2017-2018StudyPlan.pdf
[12] 加利福尼亚独立电力系统运营商委员会. 输电经济型评估方法 [R]. California:ISO Board,2004:1-10.

California Independent Power System Operators Committee. Transmission economic assessment methodology [R]. California: ISO Board, 2004: 1-10.
[13] 王诗超,苏步芸,白骏. 基于电网经济效率评估的发电和输电协调规划方法研究 [J]. 南方能源建设,2020,7(3):38-45.

WANGS C, SUB Y, BAIJ. Transmission based on economic efficiency assessment of power grid [J]. Southern Energy Construction, 2020, 7 (3): 38-45.
[14] MOREIRAA, ROCHAK, DAVIDP. Thermo power generation investment in brazil-economic conditions [J]. Energy Policy, 2004, 32 (1): 91-100.
[15] BOTTERUDA, ILICM D, WANGENSTEENI. Optimal investments in power generation under centralized and decentralized decision making [J]. IEEE Trans on Power Systems, 2005, 20 (1): 254-263.
[16] PIERREP O, PAULIM. An oligopolistic investment model of the finnish electricity market [J]. Annals of Operations Research, 2003, 121 (1-4): 123-148.
[17] HUANGA S, WUF, VARAIYAP. A game-theoretic model for generation expansion planning: problem formulation and numerical comparisons [J]. IEEE Trans on Power Systems, 200l, 16 (4): 885-891.