[1] 单葆国,孙祥栋,李江涛,等. 经济新常态下中国电力需求增长研判 [J]. 中国电力,2017,50(1):19-24.

SHANB G,SUNX D,LIJ T,et al. Analysis on the China's electricity demand growth under the new economic norm [J]. Electric Power,2017,50(1):19-24.
[2] 耿然. 考虑可再生能源消纳的高载能负荷的有功控制 [D]. 北京:华北电力大学(北京),2017.

GENGR. An active power control strategy of high-energy load considering wind power consumptive [D]. Beijing:North China Electric Power University(Beijing),2017.
[3] 林琳,鞠森,于立杰. 居民用电负荷超短期预测研究 [J]. 电子测量技术,2019,42(9):98-101.

LINL,JUS,YUL J. Research on ultra-short-term prediction of residential electricity consumption [J]. Electronic Measurement Technology,2019,42(9):98-101.
[4] 中国电力企业联合会. 煤电机组灵活性运行政策研究 [R]. 北京:中电联理事会办公厅,2019.

China Electricity Council. Study on flexible operation policy of coal-fired power units [R]. Beijing: General Office of China Electricity Council,2019.
[5] 文雯. 电力新基建要避免新一轮跑马圈地 [N]. 中国环境报, 2020-11-24.

WENW. New power infrastructure should avoid a new round of staking [N]. China Environment News,2020-11-24.
[6] 裴顺,杨桂. 燃煤机组低负荷工况下安全稳定运行研究 [J]. 南方能源建设,2018,5(增刊1):19-24.

PEIS,YANGG. Research on safe and stable operation under lower load condition for coal-fired power plant [J]. Southern Energy Construction,2018,5(Supp.1):19-24.
[7] 李沙. 600 MW机组锅炉低负荷脱硝投运改造工程实践 [J]. 锅炉技术,2019,50(1):64-69.

LIS. The reformation project practice for low-load denitration put into operation in 600 MW unit boiler technology [J]. Boiler Technology,2019,50(1):64-69.
[8] 柳磊,杨建刚,王东,等. 火电汽轮机组热电解耦技术研究 [J]. 宁夏电力,2017,0(6):62-66.

LIUL,YANGJ G,WANGD,et al. Thermal decoupling technology of thermal power steam turbine unit [J]. Ningxia Electric Power,2017,0(6):62-66.
[9] 郭立立,邢作霞,王亮. 一种基于储热的热电联产系统热电解耦运行的方法 [C]//沈阳市科学技术协会. 第十四届沈阳科学学术年会论文集(理工农医),沈阳,2017-08-11. 沈阳: 沈阳市科学技术协会,2017:906-911.

GUOL L,XINGZ X,WANGL. Heat-electrolytic coupling operation method of cogeneration system based on heat storage [C]// Shenyang Association of Science and Technology. Proceedings of the 14th Shenyang Scientific Academic Annual Meeting(Science,Technology,Agriculture and Medicine),Shenyang, August 11, 2017.Shenyang: Shenyang Association of Science and Technology, 2017: 906-911.
[10] 李伟,蔡勇,张晓磊,等. 深度调峰工况锅炉主要辅机运行安全性分析 [J]. 广东电力,2019,32(11):63-69.

LIW,CAIY,ZHANGX L,et al. Analysis of operation safety of main auxiliaries of boilers under deep peak shaving [J]. Guangdong Electric Power,2019,32(11):63-69.
[11] 罗聪,刘鑫屏. 深度调峰工况下锅炉过量空气系数对炉内温度影响的分析 [J]. 南方能源建设,2019,6(3):81-86.

LUOC,LIUX P. Analysis of optimal excess air ratio under ultra low load conditions [J]. Southern Energy Construction,2019,6(3):81-86.
[12] 王伟,徐婧,赵翔,等. 中国煤电机组调峰运行现状分析 [J]. 南方能源建设,2017,4(1):18-24.

WANGW,XUJ,ZHAOX,et al. Analysis on peak load regulation status quo for coal-fired power plants in China [J]. Southern Energy Construction,2017,4(1):18-24.
[13] 吴寿贵,王红雨,党小建,等. 某350 MW超临界直流锅炉分离器汽温偏差和汽温偏低原因分析及调整方法 [J]. 锅炉技术,2018,49(1):22-27.

WUS G,WANGH Y,DANGX J,et al. Analysis and adjustment on low separator steam temperature and steam temperature deviation in a 350 MW supercritical once-through boiler [J]. Boiler Technology,2018,49(1):22-27.
[14] 刘暑辉,田亮. 深调峰工况下锅炉虚假水位预测 [J]. 南方能源建设,2020,7(1):70-75.

LIUS H,TIANL. Prediction of boiler false water level under deep peak load regulation conditions [J]. Southern Energy Construction,2020,7(1):70-75.
[15] 杨阳. 切除低压缸运行风险分析及应对策略探索 [J]. 热力透平,2020,49(2):93-98.

YANGY. Risk analysis and treatment of operation with low-pressure cylinder cutting out in steam turbine [J]. Thermal Turbine,2020,49(2):93-98.
[16] 张开军. 太阳能光热电站有关消防设计问题的探讨 [J]. 南方能源建设,2020,7(2):75-80.

ZHANGK J. Design discussion on the fire fighting for solar power plant [J]. Southern Energy Construction,2020,7(2):75-80.
[17] 王志峰,杜凤丽. 2015~2022年中国太阳能热发电发展情景分析及预测 [J]. 太阳能,2019,307(11):7-12+71.

WANGZ F,DUF L. Scenario analysis and forecast of solar thermal power generation development in China from 2015 to 2022 [J]. Solar Energy,2019,307(11):7-12+71.
[18] 中华人民共和国住房和城乡建设部. 大中型火力发电厂设计规范:GB 50660—2011 [S]. 北京:中国计划出版社,2011.

Ministry of Housing and Urban-rural Development of the People's Republic of China. Code for design of fossil fired power plant:GB 50660—2011 [S]. Beijing: China Planning Press,2011.