[1] 张慧君,孙少楠,聂相田.基于成熟度视角下的BIM技术项目级应用能力研究[D].郑州:华北水利水电大学,2017:2-8.

ZHANGH J,SUNS N,NIEX T.Research on project level application capability of BIM technology base on maturity perspective [D].Zhengzhou: North China University of Water Resources and Electric Power,2017:2-8.
[2] 何清华,钱丽丽,段运峰,等.BIM在国内外应用的现状及障碍研究 [J].工程管理学报,2012,26(1):12-16.

HEQ H,QIANL L,DUANY F,et al.Current situation and barriers of BIM implementation [J].Journal of Engineering Management,2012,26(1):12-16.
[3] 陈思全,左华京.数字化电厂的发展现状及向智能化电厂发展的展望 [J].北京:沈阳工程学院学报(自然科学版),2018,14(2) :126-130.

CHENS Q,ZUOH J.The development status of digital power plant and the prospect of intelligent power plant [J].Beijing:Journal of Shenyang Institute of Engineering(Natural Science Edition),2018,14(2):126-130.
[4] 曹晓宇. 论三维设计技术在发电厂设计中的应用 [J].科技博览,2014(45):271.

CAOX Y. The application of 3D design technology in power plant design [J].Science and Technology Review,2014(45):271.
[5] 王美华,高路,侯羽中,等.国内主流BIM软件特性的应用与比较分析 [J].土木建筑工程信息技术,2017,9(1):69-75.

WANGM H,GAOL,HOUY Z,et al.Application and comparative analysis of characteristics of domestic mainstream bim software [J].Journal of Information Technology in Civil Engineering and Architecture,2017,9(1):69-75.
[6] 王颖,李宇璜,刘军.火力发电厂三维设计软件的实际应用 [J].吉林电力,2000(4):26-29.

WANGY,LIY H,LIUJ.The practical application of 3D design software for thermal power plant [J].Jilin Electric Power,2000(4):26-29.
[7] 黄增宏,郭晓克,孙岳武.数字化电厂设计实现的探讨 [J].吉林电力,2004(6):27-29.

HUANGZ H,GUOX K,SUNY W.Discussion on realization of design for digital power plant [J].Jilin Eletric Power,2004(6):27-29.
[8] 袁泉.数字化电厂设计模式分析 [J].吉林电力,2010,38(4):11-13.

YUANQ.Design model analysis on digitized power station [J].Automation Application,2010,38(4):11-13.
[9] 贾震江,刘宇穗.协同、三维技术在数字化电厂建设中的应用[J].电力建设,2011,32(4):83-86.

JIAZ J,LIUY S.Application of collaborative 3D design in digitalized power plant [J].Eletric Power Construction,2011,32(4):83-86.
[10] 刘晓伟,文剑,苑媛,等.火力发电厂数字一体化设计平台中二三维协同设计应用 [J].化工进展,2017,36(增刊1):567-571.

LIUX W,WENJ,YUANY,et al.Application research on 2D/3D collaboration design in digital integration platform for thermal power plant design [J].Chemical Industry and Engineering Progress,2017,36(Supp.1):567-571.
[11] 李梦顺.火力发电厂汽水管道支吊架数字化设计流程开发与应用 [J].中国勘察设计,2018(12):99-101.

LIM S.The development and application on digital design process of steam pipe support and hanger in thermal power plant [J].China Investigation Design,2018(12):99-101.
[12] 吴迪,余俊,杨建华.火力发电厂结构专业三维数字化设计流程应用研究 [J].特种结构,2016,33(5):91-94.

WUD,YUJ,YANGJ H.Applied research on process of structure in thermal power plant engineering digital design [J].Special Structures,2016,33(5):91-94.
[13] 李锋,孔祥宇.土建专业利用三维数据支撑设计出图讨论 [C]//中国建筑设计研究院. 第五届全国建筑结构技术交流会论文集,杭州,2015. 杭州:《建筑结构》编辑部,2015:1126-1129.

LIF,KONGX Y.Discussion on 3D data supporting design drawing on civil engineering [C]// China Architecture Design & Research Group. Proceedings of the 5th National Building Structure Technology Exchange Conference,2015.Hangzhou: Editorial Department of Journal of Architectural Structure,2015:1126-1129.
[14] 白瑾.三维数字化协同技术在电厂设计中的应用研究 [J].城市建设理论研究(电子版),2017(22):124-125.

BAIJ.Application of 3D digital collaborative technology in power plant design [J].Urban Construction Theory Research(Electronic Edition),2017(22):124-125.