[1] 刘鹤忠,叶勇健. 当前技术条件下火电机组最大单机容量的探讨 [J]. 电力建设,2011,32(2):67-70.

LIU H Z, YE Y J. Discussion on the largest possible capacity of thermal power unit under present technology level [J]. Electrical Power Construction,2011,32(2):67-70.
[2] 王东雷,张鹏. 1 200 MW等级超超临界机组可行性研究 [J]. 电力建设,2015,36(2):131-136.

WANG D L, ZHANG P,Feasibility study on 1 200 MW ultra-supercritical unit [J]. Electrical Power Construction,2015,36(2):131-136.
[3] 徐雪元. 1 200 MW超超临界参数锅炉的研制与开发 [J]. 电力建设,2010,31(3):60-62.

XU X Y,1 200 MW USC parameter boiler development [J]. Electrical Power Construction, 2010,31(3):60-62.
[4] 华洪. 西门子1 000 MW超超临界汽轮机的技术特点 [J]. 上海电力,2005(4):408.

HUA H,Technology features of Siemens 1 000 MW ultra-supercritical steam turbine [J]. Shanghai Electric,2005(4):408.
[5] 梅林波,沈红卫,王思玉. 620 ℃超超临界汽轮机机组新型高温转子钢的应用 [J]. 热力透平,2014,43(3):219-221.

MEI L B, SHEN H W, WANG S Y. Application of advanced rotor steel in 620 ℃ USC steam turbines [J]. Thermal Turbine,2014,43(3): 219-221.
[6] 刘明慧. 自主研发世界最大容量1 240 MW火电发电机 [J]. 电机技术,2014(3):31.

Liu M H. Independent research and development of the world's largest capacity 1 240 MW thermal power generator [J]. Motor Technology,2014(3):31.
[7] 石司默. 100%高压旁路对超超临界锅炉设计的影响 [J]. 锅炉制造,2016(5):21-24.

SHI S M. Influence of 100% high-pressure bypass to USC boiler design [J]. Boiler Manufacturing,2016(5):21-24.
[8] 范永春,霍沛强. 1 000 MW超超临界机组主厂房布置格局探讨 [J]. 电力勘测设计,2009(5):36-39.

FAN Y C, HE P Q. Discussion on main building layout of 1 000 MW ultra super critical unit [J]. Electric Power Survey & Design,2009(5):36-39.
[9] 马晓峰,李宏保. 1 000 MW汽轮机组单/双例高压加热器选型 [J]. 黑龙江电力,2008,30(6):450-452.

MA X F, LI H B. Selection of single row/double row high pressure heater for 1 000 MW unit [J]. Heilongjiang Electric Power,2008,30(6):450-452.
[10] 陈俊斌. 1 200 MW超超临界机组三壳体凝汽器的特点分析 [J]. 电站辅机,2016,37(3):11-13.

CHEN J B. Characteristic analysis of three shell condenser for 1 200 MW ultra supercritical power unit [J]. Power Station Auxiliary Equipment, 2016,37(3):11-13.
[11] 凌芳,霍沛强,邓成刚,等. 1 000 MW等级湿冷机组回热级数优化研究 [J]. 南方能源建设,2014,1(1):45-49.

LING F, HUO P Q, DENG C G,et al. Optimization of regenerative stage numbers for 1 000 MW wet cooling units [J]. Southern Energy Construction,2014,1(1):45-49.