[1] 李兴源,魏巍,王渝红,等. 坚强智能电网发展技术的研究 [J]. 电力系统保护与控制,2009,37(17):1-7.

LI X Y,WEI W,WANG Y H,et al. Study on the development and technology of strong smart grid [J]. Power System Protection and Control,2009,37(17):1-7.
[2] 赵云飞,陈金富. 层次分析法及其在电力系统中的应用 [J]. 电力自动化设备,2004,24(9):85-89.

ZHAO Y F,CHEN J F. Analytic hierarchy process and its application in power system [J]. Electric Power Automation Equipment,2004,24(9):85-89.
[3] 袁昕. 基于AHP的北京城区电网可靠性评价体系研究与应用 [D]. 北京:华北电力大学,2012.

YUAN X. Research and applications on the reliability evaluation system of beijing urban district distribution construction based on AHP [D]. Beijing:North China Electric Power Unviersity,2012.
[4] 李金芳. 基于AHP/DEA的20 kV中压配电方案研究及评估 [D]. 北京:华北电力大学,2009.

LI J F. Study and evaluation of distribution schemes in which 20 kV is used based on AHP/DEA [D]. Beijing:North China Electric Power Unviersity,2009.
[5] 柳顺,杜树新. 基于数据包络分析的模糊综合评价方法 [J]. 模糊系统与数学,2010,24(2):93-96.

LIU S,DU S X. Fuzzy comprehensive evaluation based on data envelopment analysis [J]. Fuzzy Systems and Mathematics,2010,24(2):93-96.
[6] 华中生,吴云燕,徐晓燕. 一种AHP判断矩阵一致性调整的新方法 [J]. 系统工程与电子技术,2003,25(1):38-41.

HUA Z S,WU Y Y,XU X Y. A new method of consistency regulation for the AHP judgment matrix [J]. Systems Engineering and Electronics,2003,25(1):38-41.
[7] LIU S,DU S X. Fuzzy comprehensive evaluation based on data envelopment analysis [J]. Fuzzy Systems and Mathematics,2010,24(2):93-96.
[8] 林济铿,李童飞,赵子明,等. 基于熵权模糊综合评价模型的电力系统黑启动方案评估 [J]. 电网技术,2012,36(2):51-54.

LIN J K,LI T F,ZHAO Z M,et al. Assessment on power system black-start schemes based on entropy-weighted fuzzy comprehensive evaluation model [J]. Power System Technology,2012,36(2):51-54.
[9] 王智冬,李晖,李隽,等. 智能电网的评估指标体系 [J]. 电网技术,2009,33(17):14-18.

WANG Z D,LI H,LI J,et al. Assessment index system for smart grids [J]. Power System Technology,2009,33(17):14-18.
[10] 焦丰顺,张劲松,唐晟,等. 智能配电网项目综合效益分析评价方法研究 [J]. 南方能源建设,2017,4(1):71-74.

JIAO F S,ZHANG J S,TANG S,et al. Research on comprehensive benefits evaluation of smart distribution grid [J]. Southern Energy Construction,2017,4(1):71-74.