[1] 南方电网公司. 数字电网白皮书(2020年) [R]. 广州: 南方电网有限责任公司, 2020.

China Southern Power Grid Corporation. Digital Power Grid White Paper (2020) [R]. Guangzhou: China Southern Power Grid Co., LTD., 2020.
[2] 冯国平, 解文艳, 王海吉, 等. 基于大数据的DSS融合架构研究 [J]. 南方能源建设, 2016, 3(增刊1): 1-4,13. DOI:  10.16516/j.gedi.issn2095-8676.2016.S1.001.

FENG G P, XIE W Y, WANG H J, et al. Research on fusion architecture of DSS based on big data [J]. Southern energy construction, 2016, 3(Suppl. 1): 1-4,13. DOI:  10.16516/j.gedi.issn2095-8676.2016.S1.001.
[3] 刘万勋, 于琳琳, 张丽华, 等. 基于AHP和多级模糊综合评判的电网发展水平评估 [J]. 智慧电力, 2020, 48(5): 80-85. DOI:  10.3969/j.issn.1673-7598.2020.05.013.

LIU W X, YU L L, ZHANG L H, et al. Evaluation of power grid development level based on AHP and multi-level fuzzy comprehensive evaluation [J]. Smart power, 2020, 48(5): 80-85. DOI:  10.3969/j.issn.1673-7598.2020.05.013.
[4] 高新华, 严正. 以技术成熟度为特征的智能电网评价指标体系 [J]. 南方电网技术, 2014, 8(1): 8-12. DOI:  10.13648/j.cnki.issn1674-0629.2014.01.002.

GAO X H, YAN Z. The smart grid′s evaluation index system with technology maturity characteristic [J]. Southern power system technology, 2014, 8(1): 8-12. DOI:  10.13648/j.cnki.issn1674-0629.2014.01.002.
[5] 孙彦龙, 康重庆, 陈宋宋, 等. 低碳电网评价指标体系与方法 [J]. 电力系统自动化, 2014, 38(17): 157-162. DOI:  10.7500/AEPS20140505006.

SUN Y L, KANG C Q, CHEN S S, et al. Low-carbon power grid index system and evaluation method [J]. Automation of electric power systems, 2014, 38(17): 157-162. DOI:  10.7500/AEPS20140505006.
[6] 陈永权, 王雄飞. 基于模糊层次分析法的我国电气化水平综合评价 [J]. 智慧电力, 2019, 47(7): 24-28. DOI:  10.3969/j.issn.1673-7598.2019.07.005.

CHEN Y Q, WANG X F. Comprehensive evaluation of China′s electrification level based on fuzzy analytic hierarchy process [J]. Smart power, 2019, 47(7): 24-28. DOI:  10.3969/j.issn.1673-7598.2019.07.005.
[7] 沈阳武, 彭晓涛, 施通勤, 等. 基于最优组合权重的电能质量灰色综合评价方法 [J]. 电力系统自动化, 2012, 36(10): 67-73.

SHEN Y W, PENG X T, SHI T Q, et al. A grey comprehensive evaluation method of power quality based on optimal combination weight [J]. Automation of electric power systems, 2012, 36(10): 67-73.
[8] 张宇轩, 苏娟, 贾涛, 等. 电力用户对供电可靠性敏感度的评价与分类方法 [J]. 江苏大学学报(自然科学版), 2021, 42(5): 575-581,608. DOI:  10.3969/j.issn.1671-7775.2021.05.012.

ZHANG Y X, SU J, JIA T, et al. Sensitivity evaluation and classification method of power users to power supply reliability [J]. Journal of Jiangsu university (natural science edition), 2021, 42(5): 575-581,608. DOI:  10.3969/j.issn.1671-7775.2021.05.012.
[9] 赵文猛, 周保荣, 黎小林, 等. 电力市场综合评估指标体系及评价方法 [J]. 南方电网技术, 2019, 13(8): 74-80. DOI:  10.13648/j.cnki.issn1674-0629.2019.08.011.

ZHAO W M, ZHOU B R, LI X L, et al. Comprehensive evaluation index system and evaluation method of electricity market [J]. Southern power system technology, 2019, 13(8): 74-80. DOI:  10.13648/j.cnki.issn1674-0629.2019.08.011.
[10] 向思阳, 蔡泽祥, 刘平, 等. 基于AHP-反熵权法的配电网低碳运行模糊综合评价 [J]. 电力科学与技术学报, 2019, 34(4): 69-76. DOI:  10.19781/j.issn.1673-9140.2019.04.010.

XIANG S Y, CAI Z X, LIU P, et al. Fuzzy comprehensive evaluation of the low-carbon operation of distribution network based on AHP-Anti-Entropy Method [J]. Journal of electric power science and technology, 2019, 34(4): 69-76. DOI:  10.19781/j.issn.1673-9140.2019.04.010.
[11] 唐勇俊, 曹哲, 袁智强. 基于可靠性评估的电网综合评价规划方法研究 [J]. 电力与能源, 2017, 38(1): 87-90. DOI:  10.11973/dlyny201701021.

TANG Y J, CAO Z, YUAN Z Q. Research on comprehensive evaluation of power network planning based on reliability assessment [J]. Power & energy, 2017, 38(1): 87-90. DOI:  10.11973/dlyny201701021.
[12] 刘俊华, 罗隆福, 张志文, 等. 基于模糊集对分析法的电能质量综合评估 [J]. 电网技术, 2012, 36(7): 81-85.

LIU J H, LUO L F, ZHANG Z W, et al. Comprehensive evaluation of power quality based on fuzzy set pair analysis [J]. Power system technology, 2012, 36(7): 81-85.
[13] 郭华, 李悝, 陈凯. 基于综合评价法的广西消纳外来电力竞争力分析 [J]. 南方电网技术, 2018, 12(9): 62-67. DOI:  10.13648/j.cnki.issn1674-0629.2018.09.009.

GUO H, LI K, CHEN K. Competitiveness analysis on external electricity absorption in Guangxi power system based on comprehensive evaluation method [J]. Southern power system technology, 2018, 12(9): 62-67. DOI:  10.13648/j.cnki.issn1674-0629.2018.09.009.
[14] 张浩然, 杨玉静, 王少杰, 等. 基于电网成效贡献度的储备项目量化评价方法及优选排序 [J]. 南方电网技术, 2021, 15(2): 26-33. DOI:  10.13648/j.cnki.issn1674-0629.2021.02.004.

ZHANG H R, YANG Y J, WANG S J, et al. Quantitative evaluation method and optimal ranking of reserve projects based on grid effectiveness [J]. Southern power system technology, 2021, 15(2): 26-33. DOI:  10.13648/j.cnki.issn1674-0629.2021.02.004.
[15] 李杰, 李卫军, 萧琨, 等. 基于模糊综合评判的电力通信设备状态评价方法 [J]. 南方电网技术, 2014, 8(5): 56-60. DOI:  10.13648/j.cnki.issn1674-0629.2014.05.018.

LI J, LI W J, XIAO K, et al. State evaluation of power communication equipment based on fuzzy synthetic assessment [J]. Southern power system technology, 2014, 8(5): 56-60. DOI:  10.13648/j.cnki.issn1674-0629.2014.05.018.
[16] 严宇, 李庚银, 周明, 等. 基于模糊综合评价的交易结算偏差电量处理方法 [J]. 电力系统自动化, 2019, 43(3): 200-204. DOI:  10.7500/AEPS20180612009.

YAN Y, LI G Y, ZHOU M, et al. Processing method for transaction settlement bias power based on fuzzy comprehensive evaluation [J]. Automation of electric power systems, 2019, 43(3): 200-204. DOI:  10.7500/AEPS20180612009.
[17] 陆以勤, 黄俊贤, 程喆, 等. 基于改进AHP-FCE模型的多指标拟态表决算法 [J]. 北京邮电大学学报, 2021, 44(2): 8-13. DOI:  10.13190/j.jbupt.2020-105.

LU Y Q, HUANG J X, CHENG Z, et al. A multi-index mimic voting algorithm based on improved AHP-FCE model [J]. Journal of Beijing university of posts and telecommunications, 2021, 44(2): 8-13. DOI:  10.13190/j.jbupt.2020-105.