[1] 朱明,全吉,黄剑眉,等. 国际工程项目费用风险量化评估与动态管控 [J]. 国际经济合作,2014, 29(5):81-86.

ZHU Ming, QUAN Ji, HUANG Jianmei, et al. Quantitative Risk Assessment and Dynamic Control of International Engineering Project Cost [J]. Journal of International Economic Cooperation, 2014, 29(5):81-86.
[2] DIKMEN I, BIRGONUL M T, HAN S. Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International Construction Projects [J]. International Journal of Project Management, 2007, 25(5): 494-505.
[3] 祝迪飞,方东平,王守清,等. 2008奥运场馆建设风险管理工具:风险表的建立[J]. 土木工程学报,2006(12): 119-123.

ZHU Difei, FANG Dongping, WANG Shouqing, et al. On Risk Register for Construction of 2008 Olympic Venues [J]. China Civil Engineering Journal, 2006(12): 119-123.
[4] SUN Yu, FANG Dongping, WANG Shouqing, et al. Safety Risk Identification and Assessment for Beijing Olympic Venues Construction [J]. Journal of Management in Engineering, 2008, 24(1): 40-47.
[5] HASSANEIN A A G, AFIFY H M F. A Risk Identification Procedure for Construction Contracts: A Case Study of Power Station Projects in Egypt [J]. Civil Engineering and Environmental Systems, 2007, 24(1): 3-14.
[6] Al KHATTAB A, ANCHOR J, DAVIES E. Managerial Perceptions of Political Risk in International Projects [J]. International Journal of Project Management, 2007, 25(7): 734-743.
[7] ZARKADA-FRASER A, FRASER C. Risk Perception by UK Firms Towards the Russian Market [J]. International Journal of Project Management, 2002, 20(2): 99-105.
[8] KAPILA P, HENDRICKSON C. Exchange Rate Risk Management in International Construction Ventures [J]. Journal of Management in Engineering, 2001, 17(4): 186-191.
[9] CHAN E H W, TSE R Y C. Cultural Considerations in International Construction Contracts [J]. Journal of Construction Engineering and Management, 2003, 129(4): 375-381.
[10] LEVITT R, HORII T, MAHALINGAM A, et al. Understanding and Managing the Effects of Institutional Differences in Global Projects [C]//Specialty Conference on Management and Leadership in Construction, 2004. [S.l.]: [s.n.], 2004:7-19.
[11] FIDAN G, DIKMEN I, TANYER A M, et al. Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects [J]. Journal of Computing in Civil Engineering, 2011, 25(4): 302-315.