[1] 彭波,陈旭,徐乾耀,等. 面向新能源消纳的电网规划方法初探 [J]. 电网技术,2013,37(12):3386-3391.

PENG B,CHEN X,XU Q Y,et al. Preliminary research on power grid planning method aiming at accommodating new energy [J]. Power System Technology,2013,37(12):3386-3391.
[2] 陈东,雷金勇. 南方电网风电功率预测系统应用扩展研究 [J]. 南方能源建设,2015,2(3):28-33.

CHEN D,LEI J Y. Research on the flexible performance of wind power forecast system in China southern power grid [J]. Southern Energy Construction,2015,2(3):28-33.
[3] 曾鸣,李晨,陈英杰,等. 风电大规模并网背景下我国电力需求侧响应实施模式 [J]. 华东电力,2012,40(3):363-367.

ZENG M,LI C,CHEN Y J,et al. Implementation mode of power demand side response to large-scale wind power integrated grid in China [J]. East China Electric Power,2012,40(3):363-367.
[4] 艾欣,刘晓. 基于需求响应的风电消纳机会约束模型研究 [J]. 华北电力大学学报(自然科学版),2011,38(3):17-622+35.

AI X,LIU X. Chance constrained model for wind power usage based demand response [J]. Journal of North China Electric Power University,2011,38(3):17-622+35.
[5] 别朝红,胡国伟,谢海鹏,等. 考虑需求响应的含风电电力系统的优化调度 [J]. 电力系统自动化,2014,38(13):115-120+159.

BIE Z H,HU G W, XIE H P, et al. Optimal dispatch for wind power integrated systems considering demand response [J]. Automation of Electric Power Systems,2014,38(13):115-120+159.
[6] 陈雷,卢斯煜. 风电场出力特性与集群效应分析方法研究 [J]. 南方能源建设,2017,4(1):31-37.

CHEN L,LU S Y. Research on the analysis method for wind power generating output characteristic and cluster effects [J]. Southern Energy Construction,2017,4(1):31-37.
[7] Mellit A,Pavan A M A. 24-h forecast of solar irradiance using artificial neural network:application for performance prediction of a grid-connected PV plant at TRIESTE,ITALY [J]. Solar Energy,2010,84(8):807-821.
[8] Ilka LEWINGTON,PAN D. Economic regulation of network connection of offshore wind:applying european experience to China:part Ⅱ [J]. Southern Energy Construction,2018,5(3):8-18.