[1] 吴阿峰,马旻,李伟科,等. 超临界机组可行性研究专题报告 [R]. 广州:中国能源建设集团广东省电力设计研究院有限公司,2013:11-12.

WU A F,M M,LI W K,et al. The feasibility research report of supercritical unit project [R],Guangzhou: Guang Dong Electric Power Design Institute Co., Ltd. of China Energy Engineering Group,2013:11-12.
[2] 郭大山,王伟来,胡双南. 超临界锅炉水冷壁技术特点分析与比较 [J]. 锅炉制造,2012,7(4):7-10.

GUO D S,WANG W L,HU S N. Technical character analysis and comparison of supercritical boiler water-wall [J]. Boiler Manufacturing,2012,7(4):7-10.
[3] 冯强,魏同生,梁浩. 600 MW超临界“W”火焰锅炉启动过程中水冷壁超温原因分析 [J]. 河北电力技术,2013,32(6):48-49.

FENG Q,WEI T S,LIANG H. Cause analysis on severe waterwall tube overheating of 600 MW supercritical w-flame boiler during startup [J]. Hebei Electric Power,2013,32(6):48-49.
[4] 徐金苗,吴阿峰,樊晓茹,等. 磨煤机配套钢球的选型及技术经济研究 [J]. 南方能源建设,2015,2(Supp. 1):178-182.

XU J M,WU A F,FAN X R,et al. Study on steel mill ball selection and technique economic research [J]. Southern Energy Construction,2015,2(Supp. 1):178-182.