[1] 张丹,王杰. 国内微电网项目建设及发展趋势研究 [J]. 电网技术,2016,40(2):451-458.

ZHANG D,WANG J. Research on construction and development trend of micro-grid in China [J]. Power System Technology,2016,40(2):451-458.
[2] 汤东升. 海上风电大数据分析技术及应用前景初探 [J]. 南方能源建设,2018,5(2):65-66.

TANG D S. Preliminary study on the big data technology and its application prospect for offshore wind farm [J]. Southern Energy Construction,2018,5(2):65-66.
[3] 元国凯,汤东升,刘晋超,等. 海上风电机组基础灌浆技术应用与发展 [J]. 南方能源建设,2017,4(1):10-17.

YUAN G K,TANG D S,LIU J C,et al. Grouting technology application and development in offshore wind farm [J]. Southern Energy Construction,2017,4(1):10-17.
[4] 苗文静,黄伟,葛良军,等. 基于VSC-HVDC并网的海上风电场无功补偿控制策略 [J]. 华北电力大学学报(自然科学版),2019,46(1):74-81.

MIAO W J,HUANG W,GE L J,et al. Reactive power compensation control strategy of offshore wind farm on basis of VSC-HVDC grid-connection [J]. Journal of North China Electric Power University(Natural Science Edition),2019,46(1):74-81.
[5] KOCEWIAK  H,KRAMER B L Ø,HOLMSTRØM O,et al. Resonance damping in array cable systems by wind turbine active filtering in large offshore wind power plants [J]. IET Renewable Power Generation,2017(7):1069-1077.
[6] LIN J. Integrating the first HVDC-Based offshore wind power into PJM system—a real project case study [J]. IEEE Transactions on Industry Applications,2016,52(3):1970-1978.
[7] 迟永宁,梁伟,张占奎,等. 大规模海上风电输电与并网关键技术研究综述 [J]. 中国电机工程学报,2016,36(14):3758-3771.

CHI Y N,LIANG W,ZHANG Z K,et al. An overview on key technologies regarding power transmission and grid integration of large scale offshore wind power [J]. Proceedings of the CSEE,2016,36(14):3758-3771.
[8] 郭伟,程莲莲. 海上升压站上部组块施工期监测与分析 [J]. 水力发电,2017,43(10):103-106.

GUO W,CHENG L L. Upper block construction monitoring and analysis of offshore booster station [J]. Water Power,2017,43(10):103-106.
[9] 刘福来,张略秋,武江. 海上风电场海上升压站抗震设计 [J]. 武汉大学学报(工学版),2013,46(增刊1):144-147.

LIU F L,ZHANG L Q,WU J. Seismic design of offshore substation for offshore wind power farms [J]. Engineering Journal of Wuhan University,2013,46(Supp.1):144-147.
[10] 杨建军,俞华锋,赵生校,等. 海上风电场升压变电站设计基本要求的研究 [J]. 中国电机工程学报,2016,36(14):3781-3789.

YANG J J,YU H F,ZHAO S X,et al. Research on basic requirements of offshore substation design [J]. Proceedings of the CSEE,2016,36(14):3781-3789.
[11] 陈敏,佘双翔,刘小松,等. 基于LCC的海上风电场主变压器冗余配置经济性对比与分析 [J]. 电力系统自动化,2015,39(14):168-174.

CHEN M,SHE S X,LIU X S,et al. Economical assessment on redundancy configuration of main transformers for offshore wind farm based on life cycle cost [J]. Automation of Electric Power Systems,2015,39(14):168-174.
[12] 张宝峰. 国内外风电场海上升压站布置型式标准概述 [J]. 中国标准化,2017(24):222-223.

ZHANG B F. Overview of layout standards for offshore booster stations of wind farms both here and abroad [J]. China Standardization,2017(24):222-223.