[1] TUMMALA V, BURCHETT J F. Applying a risk management process (RMP) to manage cost risk for an EHV transmission line project [J]. International journal of project management, 1999, 17(4): 223-235. DOI:  10.1016/s0263-7863(98)00038-6.
[2] JAAFARI A. Management of risks, uncertainties and opportunities on projects: time for a fundamental shift [J]. International journal of project management, 2001, 19(2): 89-101. DOI:  10.1016/S0263-7863(99)00047-2.
[3] IRANMANESH H, JALILI M, PIRMORADI Z. Developing a new structure for determining time risk priority using risk breakdown matrix in EPC projects [C]//Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-4, 2007. New York: IEEE, 2007: 999-1003. DOI:  10.1109/ieem.2007.4419342.
[4] 孟小斌. EPC工程总承包项目管理能力提升研究 [J]. 低碳世界, 2021, 11(5): 301-302. DOI:  10.3969/j.issn.2095-2066.2021.05.147.

MENG X B. Research on improving project management ability of EPC general contracting [J]. Low carbon world, 2021, 11(5): 301-302. DOI:  10.3969/j.issn.2095-2066.2021.05.147.
[5] 欧阳子泰, 吕未. 海上风电项目风险分析研究 [J]. 中国水运, 2019(11): 35-36. DOI:  10.13646/j.cnki.42-1395/u.2019.11.012.

OUYANG Z T, LÜ W. Research on risk analysis of offshore wind power projects [J]. China water transport, 2019(11): 35-36. DOI:  10.13646/j.cnki.42-1395/u.2019.11.012.
[6] 韩鑫, 张家豪. 海上风电EPC建设模式中的风险防范研究 [J]. 水电与新能源, 2021, 35(9): 32-34. DOI:  10.13622/j.cnki.cn42-1800/tv.1671-3354.2021.09.008.

HAN X, ZHANG J H. On the risk prevention of offshore wind power projects with EPC construction mode [J]. Hydropower and new energy, 2021, 35(9): 32-34. DOI:  10.13622/j.cnki.cn42-1800/tv.1671-3354.2021.09.008.
[7] 李冉阳. EPC总承包项目风险管理前沿文献综述 [J]. 项目管理技术, 2021, 19(3): 41-46. DOI:  10.3969/j.issn.1672-4313.2021.03.007.

LI R Y. The literature review on the frontier of EPC general contracting risk management [J]. Project management technology, 2021, 19(3): 41-46. DOI:  10.3969/j.issn.1672-4313.2021.03.007.
[8] 林新辉. 海上风电项目的风险分析及应对措施 [J]. 福建建材, 2020(4): 112-113,6.

LIN X H. Risk analysis and countermeasures for offshore wind power projects [J]. Fujian building materials, 2020(4): 112-113,6.
[9] 许文雯. 基于WBS的工程项目进度管理研究 [J]. 化工管理, 2019(18): 168-169. DOI:  10.3969/j.issn.1008-4800.2019.18.116.

XU W W. Research on project schedule management based on WBS [J]. Chemical enterprise management, 2019(18): 168-169. DOI:  10.3969/j.issn.1008-4800.2019.18.116.
[10] 马旭平, 郝俊, 孙晓蕾, 等. 基于工作分解结构-风险分解结构(WBS-RBS)耦合矩阵的海外电力工程投资风险识别与分析 [J]. 科技促进发展, 2019, 15(3): 225-233. DOI:  10.11842/chips.2019.03.001.

MA X P, HAO J, SUN X L, et al. Risk identification and analysis of overseas power engineering investment based on WBS-RBS coupling matrix [J]. Science & technology for development, 2019, 15(3): 225-233. DOI:  10.11842/chips.2019.03.001.
[11] 谭安. 建筑工程EPC总承包项目风险管理研究 [J]. 工程技术研究, 2021, 6(3): 153-154. DOI:  10.3969/j.issn.1671-3818.2021.03.068.

TAN A. Research on risk management of EPC general contracting projects for construction engineering [J]. Engineering and technological research, 2021, 6(3): 153-154. DOI:  10.3969/j.issn.1671-3818.2021.03.068.
[12] 刘国超, 王文伟, 吴凯锋, 等. 浅谈总承包工程项目风险管理能力的提升 [J]. 项目管理技术, 2021, 19(2): 146-149. DOI:  10.3969/j.issn.1672-4313.2021.02.027.

LIU G C, WANG W W, WU K F, et al. Enhancement of risk management ability in general contracting projects [J]. Project management technology, 2021, 19(2): 146-149. DOI:  10.3969/j.issn.1672-4313.2021.02.027.
[13] 郑小惠. 论国内海上风电项目保险管理及解决方案 [J]. 中国市场, 2019(8): 51-52. DOI:  10.13939/j.cnki.zgsc.2019.08.051.

ZHENG X H. Insurance management and solutions for offshore wind power projects in China [J]. China market, 2019(8): 51-52. DOI:  10.13939/j.cnki.zgsc.2019.08.051.
[14] 章维飞. 基于EPC工程总承包模式的现场施工管理 [J]. 工程技术研究, 2020, 5(7): 146-147. DOI:  10.19537/j.cnki.2096-2789.2020.07.067.

ZHANG W F. On-site construction management based on EPC model [J]. Engineering and technological research, 2020, 5(7): 146-147. DOI:  10.19537/j.cnki.2096-2789.2020.07.067.
[15] 程碧华, 吴翔华. 工程项目管理国际期刊研究热点及趋势 [J]. 土木工程与管理学报, 2017, 34(3): 137-141. DOI:  10.13579/j.cnki.2095-0985.2017.03.024.

CHENG B H, WU X H. International journal of engineering project management: hotspots and trend research [J]. Journal of civil engineering and management, 2017, 34(3): 137-141. DOI:  10.13579/j.cnki.2095-0985.2017.03.024.
[16] 孔亮, 郭彦, 张健. 境外电力总承包项目风险管理 [J]. 项目管理评论, 2018(4): 64-66.

KONG L, GUO Y, ZHANG J. Risk management of overseas power EPC projects [J]. Project management review, 2018(4): 64-66.
[17] 何佰洲, 王玉. 基于模糊综合评价的国际工程项目投资风险研究 [J]. 北京建筑大学学报, 2018, 34(4): 60-65. DOI:  10.19740/j.1004-6011.2018.04.10.

HE B Z, WANG Y. Research on investment risk of international engineering project based on fuzzy comprehensive evaluation [J]. Journal of Beijing university of civil engineering and architecture, 2018, 34(4): 60-65. DOI:  10.19740/j.1004-6011.2018.04.10.
[18] 白礼彪, 白思俊, 张以彬. 基于阶段耦合的项目组合配置战略贴近度 [J]. 中国管理科学, 2017, 25(3): 93-101. DOI:  10.16381/j.cnki.issn1003-207x.2017.03.011.

BAI L B, BAI S J, ZHANG Y B. Close degree between strategy and project portfolio allocation based on stage coupling [J]. Chinese journal of management science, 2017, 25(3): 93-101. DOI:  10.16381/j.cnki.issn1003-207x.2017.03.011.