[1] 王伟,徐婧,赵翔,等. 中国煤电机组调峰运行现状分析 [J]. 南方能源建设,2017,4(1):18-24.

WANG W, XU J, ZHAO X,et al. Analysis on peak load regulation status quo for coal-fired power plants in china [J]. Southern Energy Construction,2017,4(1):18-24.
[2] 赵伟光,刘明远,杨尚文,等. 国产超临界600 MW汽轮机深化滑压运行试验研究 [J]. 东北电力技术,2014,35(3):13-17.

ZHAO W G, LIU M Y, YANG S W,et al. Test study on deepen sliding pressure operation for domestic supercritical 600 MW steam turbine [J]. Northeast Electric Power Technology,2014,35(3):13-17.
[3] 张希富,王运民,师保平,等. 电厂汽轮机组变负荷运行安全经济性分析 [J]. 汽轮机技术,2014,56(6):464-466.

ZHANG X F, WANG Y M, SHI B P,et al. Safety and economic analysis on variable load operation of steam turbine unit in power plant [J]. Turbine Technology,2014,56(6):464-466.
[4] 李明,黄丕维,焦庆丰,等. 大型汽轮机组运行方式优化试验研究及经济性分析 [J]. 湖南电力,2008,28(1):27-30.

LI M, HUANG P W, JIAO Q F,et al. Research on test of large steam turbine units optimal operation and economy analysis [J]. Hunan Electric Power,2008,28(1):27-30.
[5] 刘双白. 汽轮机定滑压运行曲线测试方法研究 [J]. 华北电力技术,2007(12):9-12.

LIU S B. Test method of rated-sliding pressure operation curve of steam turbine [J]. North China Electric Power,2007(12):9-12.
[6] 李千军,霍鹏,郑李坤,等. 国产600 MW汽轮机组定滑压运行方式测试方法研究 [J]. 汽轮机技术,2009,51(5):386-389.

LI Q J, H P, Z L K, et al. Test method of rated-sliding pressure operation mode for domestic 600 mw steam turbines [J]. Turbine Technology,2009,51(5):386-389.
[7] 高林,李尔堪,薛建中,等. 基于凝结水变负荷技术的深度滑压节能控制 [J]. 热力发电,2016,45(4):121-124.

GAO L, LI E K, XUE J Z,et al. Energy saving automatic control with deeply pressure sliding based on condensate load adjustment technology [J]. Thermal Power Generation,2016.04,45(4):121-124.
[8] 李西军,赵爽,周虹任,等. 岱海电厂1号机组凝结水节流响应负荷变化试验分析 [J]. 电站系统工程,2010,26(4):39-41+44.

LI X J, ZHAO S, ZHOU H R,et al. Experiment of condensate throttling response to the load of daihai power plant unit 1 [J]. Power System Engineering,2010,26(4):39-41+44.
[9] 郑卫东,马浩,李肖肖,等. 凝结水节流技术在1 000 MW机组的应用 [J]. 浙江电力,2015,34(6):39-43.

ZHENG W D, MA H, LI X X,et al. Application of condensate throttling technology in 1 000 mw units [J]. Zhejiang Electric Power,2015,34(6):39-43.
[10] 庄会庆,张贻珍,刘井泉. 亚临界N330-17.75/540/540型汽轮机定、滑压运行分析 [J]. 热力透平,2009,38(2):86-89+109.

ZHUANG H Q, ZHANG Y Z, LIU J Q. Analysis on constant/sliding pressure operating of subcritical steam turbine with model N330-17.75/540/540 [J]. Thermal Turbine,2009,38(2):86-89+109.