[1] 舒印彪.加快建设坚强智能电网推动能源生产和消费革命 [J].中国科技产业, 2018(5): 10.DOI:  10.16277/j.cnki.cn11-2502/n.2018.05.004.

SHUY B.Accelerate the construction of a strong smart grid and promote the revolution of energy production and consumption [J] China Science and Technology Industry, 2018(5): 10.DOI:  10.16277/j.cnki.cn11-2502/n.2018.05.004.
[2] 赵军, 陈维江, 张建功, 等.智能变电站二次设备对开关瞬态的电磁兼容抗扰度要求分析 [J].高电压技术, 2015, 41(5): 1687-1695.DOI:  10.13336/j.1003-6520.hve.2015.05.037.

ZHAOJ, CHENW J, ZHANGJ G, et al.Analysis of electromagnetic compatibility immunity requirements of secondary equipment of intelligent substation for switching transient [J].High Voltage Technology, 2015, 41(5): 1687-1695.DOI:  10.13336/j.1003-6520.hve.2015.05.037.
[3] BUROWS, STRAUMANNU, KOHLERW, et al.New methods of damping very fast transient overvoltages in gas-insulated switchgear [J].IEEE Transactions on Power Delivery, 2014, 29(5): 2332-2339.DOI:  10.1109/TPWRD.2014.2328013.
[4] 王磊, 刘衍, 冯宇, 等.特高压GIS变电站VFTO波形衰减仿真研究 [J].电力系统保护与控制, 2019, 47(22): 45-51.DOI:  10.19783/j.cnki.pspc.181520.

WANGL, LIUY, FENGY, et al.Simulation research on VFTO waveform attenuation in UHV GIS substation [J] Power System Protection and Control, 2019, 47(22): 45-51.DOI: 10.19783/j.cnki.pspc.one hundred and eighty-one thousand five hundred and twenty.
[5] SZEWCZYKM, KUNIEWSKIM, PIASECKIW, et al.Determination of breakdown voltage characteristics of 1 100 kV disconnector for modeling of VFTO in gas-insulated switchgear [J].IEEE Transactions on Power Delivery, 2016, 31(5): 2151-2158.DOI:  10.1109/TPWRD.2015.2513080.
[6] HEJ X, GUANY G, LIUW D, et al.Design optimization of ferrite rings for VFTO mitigation [J].IEEE Transactions on Power Delivery, 2017, 32(3): 1181-1186.DOI:  10.1109/TPWRD.2015.2502458.
[7] 刘卫东, 汪林森, 陈维江, 等.特高压GIS特快速暂态过电压试验重复击穿过程研究 [J].高电压技术, 2011, 37(3): 644-650.DOI:  10.13336/j.1003-6520.hve.2011.03.013.

LIUW D, WANGL S, CHENW J, et al.Investigation of the VFTO related repeated breakdown processes in UHV GIS [J].High Voltage Technology, 2011, 37(3): 644-650.DOI:  10.13336/j.1003-6520.hve.2011.03.013.
[8] 林集明, 曾昭华.利用避雷器限制500 kV系统操作过电压 [J].高电压技术, 1984(3): 3-9+11.DOI:  10.13336/j.1003-6520.

LINJ M, ZENGZ H.Using lightning arrester to limit operating overvoltage of 500 kV system [J].High Voltage Technology, 1984(3): 3-9+11.DOI:  10.13336/j.1003-6520.hve.1984.03.002.
[9] 周甜, 康兵, 舒乃秋, 等.VFTO作用下电子式互感器辐射电磁场数值计算与分析 [J].南方电网技术, 2017, 11(4): 52-57.DOI:  10.13648/j.cnki.issn1674-0629.2017.04.008.

ZHOUT, KANGB, SHUN Q, et al.Numerical calculation and analysis of radiated electromagnetic field of electronic transformer under the action of VFTO [J].China Southern Power Grid Technology, 2017, 11(4): 52-57.DOI:  10.13648/j.cnki.issn1674-0629.2017.04.008
[10] 胡榕, 崔翔, 陈维江, 等.特高压气体绝缘开关设备瞬态外壳电压特性的试验研究 [J].中国电机工程学报, 2014, 34(29): 5244-5258.DOI:  10.13334/j.0258-8013.pcsee.2014.29.025.

HUR, CUIX, CHENW J, et al.Experimental research on the characteristics of transient enclosure voltage in ultra high voltage gas insulated switchgear [J].Proceedings of the CESS, 2014, 34(29): 5244-5258.DOI:  10.13334/j.0258-8013.pcsee.2014.29.025.
[11] 文习山, 蓝磊, 许军, 等.三峡电站允许地电位升高试验研究(I) [J].电网技术, 2003, 27(2): 9-12.DOI:  10.13335/j.1000-3673.pst.2003.02.003.

WENX S, LANL, XUJ, et al.Experimental research on allowable ground potential rise of the three gorges power station(I) [J].Power Grid Technology, 2003, 27(2): 9-12.DOI:  10.13335/j.1000-3673.pst.2003.02.003.
[12] 蓝磊, 文习山, 许军, 等.三峡电站允许地电位升高试验研究(II) [J].电网技术, 2003, 27(3): 5-7+22.DOI:  10.13335/j.1000-3673.pst.2003.03.002.

LANL, WENX S, XUJ, et al.Experimental research on allowable ground potential rise of three gorges power station(II) [J].Power Grid Technology, 2003, 27(3): 5-7+22.DOI:  10.13335/j.1000-3673.pst.2003.03.002.
[13] 陈楠, 文习山, 蓝磊, 等.微机保护装置过电压耐受能力试验分析 [J].高电压技术, 2010, 36(12): 2902-2906.DOI:  10.13336/j.1003-6520.hve.2010.12.008.

CHENN, WENX S, LANL, et al.Analysis of overvoltage tolerance test of microcomputer protection device [J].High Voltage Technology, 2010, 36(12): 2902-2906.DOI:  10.13336/j.1003-6520.hve.2010.12.008.
[14] 谭波, 杨建军, 鲁海亮, 等.接地网电位升对10 kV避雷器的反击仿真分析 [J].高电压技术, 2013, 39(5): 1265-1272.DOI:  10.3969/j.issn.1003-6520.2013.05.036.

TANB, YANGJ J, LUH L, et al.Simulation analysis of counterattack of 10 kV surge arrester caused by grounding grid potential rise [J].High Voltage Technology, 2013, 39(5): 1265-1272.DOI:  10.3969/j.issn.1003-6520.2013.05.036.
[15] 崔少青.接地网工频短路时最大允许地电位升的确定 [J].安徽理工大学学报(自然科学版), 2011, 31(4): 61-64+70.DOI:  1672-1098(2011)04-0061-04.

CUIS Q.Determination of the maximum allowable ground potential rise when the grounding grid is short-circuited at power frequency [J].Journal of Anhui University of Science and Technology(Natural Science Edition), 2011, 31(4): 61-64+70.DOI:  1672-1098(2011)04-0061-04.
[16] 卢江平, 杨兰均, 贾涛, 等.1 100 kV GIS 隔离开关分合容性小电流试验中的暂态电压测量 [J].高压电器, 2009, 45(6): 106-109+114.DOI:  10.13296/j.1001-1609.hva.2009.06.019.

LUJ P, YANGL J, JIAT, et al.Transient voltage measurement in the small current test of 1 100 kV GIS disconnector switching capacitors [J].High Voltage Electrical Appliances, 2009, 45(6): 106-109+114.DOI: 10.13296 /j.1001-1609.hva.2009.06.019.
[17] 段韶峰, 李志兵, 詹花茂, 等.252 kV GIS中特快速瞬态过电压和特快速瞬态电流特性试验研究 [J].电网技术, 2015, 39(7): 2046-2051.DOI:  10.13335/j.1000-3673.pst.2015.07.043.

DUANS F, LIZ B, ZHANH M, et al.Experimental research on ultra-fast transient overvoltage and ultra-fast transient current characteristics in 252 kV GIS [J].Power Grid Technology, 2015, 39(7): 2046-2051.DOI:  10.13335/j.1000-3673.pst.2015.07.043.
[18] 陈建.GIS中陡波前过电压特性及影响因素的研究 [D].北京: 华北电力大学, 2006.DOI:  10.13535/j.cnki.11-4406/n.2011.30.036.

CHENJ.sssStudy on the characteristics and influencing factors of steep wave front overvoltage in GIS [D].Beijing: North China Electric Power University, 2006.DOI:  10.13535/j.cnki.11-4406/n.2011.30.036.
[19] 陈灏.GIS外壳环流和暂态地电位升高的研究 [D].北京: 北京交通大学, 2011.

CHENH.Research on GIS shell circulation and transient ground potential rise [D].Beijing: Beijing Jiaotong University, 2011.
[20] 陈泰羽.混合无功补偿变电站GIS外壳环流及暂态地电位升高研究 [D].济南: 山东大学, 2019.

CHENT Y.Research on GIS shell circulation and transient ground potential rise in hybrid reactive power compensation substation [D].Jinan: Shandong University, 2019.