[1] 鲁先龙, 程永锋. 斜坡地形输电线路基础和杆塔的配合技术 [J].电力建设, 2011, 32(8): 29-33.DOI:  10.3969/j.issn.1000-7229.2011.08.006.

LUX L, CHENGJ F.Study on technology of foundation to match tower structure of transmission line on sloping ground [J].Electric Power Construction, 2011, 32(8): 29-33.DOI:  10.3969/j.issn.1000-7229.2011.08.006.
[2] 国家能源局.架空输电线路基础设计技术规程: DL/T 5219—2014 [S].北京: 中国电力出版社, 2014.

National Energy Administration.Technical code for design of foundation of overhead transmission line: DL/T 5219—2014 [S].Beijing: China Electric Power Press, 2014.
[3] 中国电力工程顾问集团有限公司, 中国能源建设集团规划设计有限公司.电力工程设计手册 [M].北京: 中国电力出版社, 2019.

China Power Engineering Consuliing Group Co., Ltd., China Energy Engineering Group Planning & Enginering Co., Ltd.Power Engineering Design Manual [M].Beijing: China Electric Power Press, 2019.
[4] 侯晓燕, 崔强, 鲁先龙, 等.输电线路高低腿杆塔基础配置策略及软件研发 [J].地下空间与工程学报, 2014, 10(增刊2): 1917-1921.

HOUX Y, CUIQ, LUX L, et al.Configuration strategy and software development of high-low leg tower foundation for transmission line [J].Chinese Journal of Underground Space and Engineering, 2014, 10(Supp.2): 1917-1921.
[5] 秦庆芝, 于泓, 张益国, 等.输电线路不等高基础设计及试验研究 [J].电力建设, 2008, 29(12): 26-30.DOI:  10.3969/j.issn.1000-7229.2008.12.007.

QINQ Z, YUH, ZHANGY G, et al.Design and experiment studies of transmission line uneven height foundations [J].Electric Power Construction, 2008, 29(12): 26-30.DOI:  10.3969/j.issn.1000-7229.2008.12.007.
[6] 黎景辉.多扩头挖孔桩基础在输电线路中的应用 [J].南方能源建设, 2020, 7(增刊2): 45-49.DOI:  10.16516/j.gedi.issn2095-8676.2020.S2.007.

LIJ H.Application of multiple heads pile foundation in transmission line [J].Southern Energy Construction, 2020, 7(Supp.2): 45-49.DOI:  10.16516/j.gedi.issn2095-8676.2020.S2.007.
[7] 许顺德.桩—岩石锚杆复合基础在架空输电线路中的应用 [J].南方能源建设, 2017, 4(增刊1): 116-119.DOI:  10.16516/j.gedi.issn2095-8676.2017.S1.022.

XUS D.Application of pile rock anchor composite foundation in transmission line [J].Southern Energy Construction, 2017, 4(Supp.1): 116-119.DOI:  10.16516/j.gedi.issn2095-8676.2017.S1.022.
[8] 丁士君, 金建华, 鲁先龙.输电线路新型复合式基础的设计与应用 [J].武汉大学学报(工学版), 2011,44(增刊1):210-213.

DINGS J, JINJ H, LUX L.Design and application of novel composite foundations to transmission lines [J].Engineering Journal of Wuhan Uinversity, 2011,44(Supp.1):210-213.
[9] 薛乐.输电线路铁塔长短腿与高低基础配置的优化研究 [D].吉林: 吉林建筑大学, 2015.

XUEL.Study on optimization of transmission tower leg length and height of the base configuration [D].Jilin: Jilin Institute of Architecture and Civil Engineering, 2015.
[10] 明日科技.Visual Basic从入门到精通 [M].北京: 清华大学出版社, 2017.

Tomorrow's Science and Technology.From introduction to mastery of Visual Basic [M].Beijing: Tsinghua University Press, 2017.
[11] 张晋西.Visual Basic与Auto CAD二次开发 [M].北京: 清华大学出版社, 2002.

ZHANGJ X.Visual Basic and Auto CAD secondary development [M].Beijing: Tsinghua University Press, 2002.
[12] 张帆, 王成煌, 郑立楷, 等.AutoCAD VBA二次开发教程 [M].北京:清华大学出版社, 2006.

ZHANGF, WANGC H, ZHENGL K, et al.Secondary development course of AutoCAD VBA [M].Beijing: Tsinghua University Press, 2006.
[13] 余天生, 赖惠君, 叶伟力, 等.铁塔高低腿配置的计算方法、系统及存储介质: CN 111709115 A [P].2020.

YUT S, LAIH J, YEW L.High-low leg configuration method system and storage medium of transmission tower: CN 111709115 A [P].2020.
[14] 程永锋, 鲁先龙, 郑卫锋.斜坡地形输电线路基础设计研究 [J].武汉大学学报(工学版), 2009,42(增刊2):277-280.DOI: CNKI: SUN: WSDD.0.2009-S1-059.

CHENGY F, LUX L, ZHENGW F.Research on relationship between surface height and buried depth increase of excavated foundation in slope terrain [J].Engineering Journal of Wuhan University, 2009(Supp.2):277-280.
[15] 祖为国, 杨忠祥.基于ObjectARX的输电线路塔基地形图批量自动绘制 [J].黑龙江工程学院学报(自然科学版), 2014, 28(2): 32-34.DOI:  10.19352/j.cnki.issn1671-4679.2014.02.009.

ZUW G, YANGZ X.The topographic map of transmission lines drawn automatically based on ObjectARX [J].Journal of Heilongjiang Institute of Technology(Natural Science Edition), 2014, 28(2): 32-34.DOI:  10.19352/j.cnki.issn1671-4679.2014.02.009.
[16] 何雄.Delaunay三角网点定位算法在输电线路设计中的应用 [J].山东工业技术, 2019(8): 208.DOI:  10.16640/j.cnki.37-1222/t.2019.08.188.

HEX.Application of delaunay triangular network point location algorithm in transmission line design [J].Journal of Shandong Industrial Technology, 2019(8): 208.DOI:  10.16640/j.cnki.37-1222/t.2019.08.188.