[1] 聂定珍,马为民,李明. 锦屏—苏南特高压直流输电工程换流站绝缘配合 [J]. 高电压技术,2010,36(1): 92-97.

NIE Dingzhen, MA Weimin, LI Ming. Insulation Coordination for Converter Stations of UHVDC Project from Jinping to Sunan [J]. High Vol tage Engineering, 2010, 36(1): 92-97.
[2] 周沛洪,吕金壮,戴敏,等. ±800 kV特高压直流线路缓波前过电压和绝缘配合 [J]. 高电压技术,2009,35(7):1509-1517.

ZHOU Peihong, LÜ Jinzhuang, DAI Min, et al. Slow Front Overvoltage and Insulation Coordination of ±800 kV UHV DC Transmission Line [J]. High Voltage Engineering, 2009, 35(7):1509-1517.
[3] 南方电网技术研究中心. ±800 kV糯扎渡送电广东直流输电工程投标报告 [R].广州:南方电网技术研究中心,2010.

China South Grid Research Center. ±800kV Nuozhadu-Guangdong DC Transmission Project Tender Study Report [R]. Guangzhou:China South Grid Research Center,2010.
[4] 吕金壮,赵杰. 云广±800 kV直流输电系统过电压与绝缘配合研究[J].南方电网技术,2009,3(2):18-22.

LÜ Jinzhuang, ZHAO Jie. Study on the Overvoltage and Insulation Coordination of Yunnan-Guangdong ±800 kV UHVDC Transmission System [J]. Southern Power System Technology, 2009, 3(2):18-22 .
[5] HAN Yongxia, LU Yuxin. Study on the Insulation Coordination of ±800 kV Converter Station in the Nuozhadu to Guangdong HVDC Power Transmission Project [J]. Advanced Materials Research, 2013,354:1205-1209.
[6] 韩永霞. 特高压直流换流站绝缘配合方案的研究 [R]. 广州:广东省电力设计研究院/华南理工大学图书馆,2012.

HAN Yongxia. Study on Insulation and Coordination of UHVDC Converter Station [R]. Guangzhou:Guangdong Electric Power Design Institute/South China University of Technology,2012.
[7] HAN Yongxia, CHEN Huixiang, LU Yuxin, et al. Research on DC Transient Overvoltage and Insulation Coordination of ±800 kV Converter Station [C]. Asia-Pacific Power and Energy Engineering Conference (APPEEC 2011),March, 28,Wuhan,2011.
[8] HAN Yongxia, LI Licheng, CHEN Huixiang, et al. Influence of Modeling Methods on the Calculated Lightning Surge Overvoltages at a UHVDC Converter Station due to Back Flashover [J]. IEEE Transactions on Power Delivery, 2012, 27(2): 1090-1095.
[9] DENG Xu, WANG Dongjun, ZHOU Hao, et al. Insulation Coordination of ±800 kV UHVDC Xiluodu Converter Station [J]. High Voltage Engineering,2012,38(12):3198-3205.
[10] 韩永霞,李立浧,陈辉祥,等. 直流保护策略对特高压换流站过电压与绝缘配合影响的仿真分析 [J]. 高电压技术,2012,38(2):316-321.

HAN Yongxia, LI Licheng, CHEN Huixiang, et al. Simulation Analysys of Influence of DC Protection on the Overvoltage and Insulation Coordination of UHVDC Converter Stations [J]. High Voltage Engineering,2012,38(2):316-321.
[11] 荆勇,任震,杨晋柏,等. 天广直流输电系统运行过电压的研究 [J]. 高电压技术,2002,28(4): 1-3.

JING Yong, REN Zhen, YANG Jinbo, et al. Study on Overvoltage of Tian-Guang HVDC Transmission [J]. High Voltage Engineering,2002, 28(4):1-3.
[12] 张致,娄殿强,郑劲,等. 葛洲坝换流站金属转换开关操作引起的避雷器事故分析及对策 [J]. 高压电器,2002,38(2):8-11.

ZHANG Zhi, LOU Dianqiang, ZHENG Jin, et al. Analysis and Countermeasure of Surge Arrester Damage Caused by MRTB Operation in Gezhouba Converter Station [J]. High Voltage Apparatus,2002,38(2):8-11.
[13] 汪道勇,黄道春,崔雨,等. 葛洲坝换流站D桥差动保护动作原因及整改 [J]. 高电压技术,2008,34(7):1504-1508.

WANG Daoyong, HUANG Daochun, CUI Yu, et al. Reasons of Differential Protection Action and Reform Measures for Gezhouba Converter Station D Bridge [J]. High Voltage Engineering,2008,34(7):1504-1508.
[14] 胡宇洋,黄道春. 葛南直流输电线路故障及保护动作分析 [J]. 电力系统自动化,2008,32(8):102-107.

HU Yuyang, HUANG Daochun. Faults and Protection Analysis of Gezhouba-Nanqiao DC Transmission Line [J]. Automation of Electric Power Systems,2008,32(8):102-107.
[15] 刘云,王明新,曾南超. 高压直流输电系统逆变站最后断路器跳闸装置配置原则 [J]. 电网技术,2006,30(6):35-40.

LIU Yun, WANG Mingxin, ZENG Nanchao. Configuration Principle of Last Breaker Trip Equipment in Inverter Station of HVDC [J]. Power System Technology,2006,30(6):35-40.
[16] 周沛洪,修木洪,谷定燮,戴敏等. ±800 kV直流系统过电压保护与绝缘配合研究 [J]. 高电压技术,2006,32(12):125-132.

ZHOU Peihong, XIU Muhong, GU Dingxie, et al. Study on Overvoltage Protection and Insulation Coordination for ±800kV HVDC Transmission System [J]. High Voltage Engineering,2006,32(12):125-132.
[17] 聂定珍,马为民,郑劲. ±800 kV特高压直流换流站绝缘配合 [J]. 高电压技术,2006,32(2):75-79.

NIE Dingzhen, MA Weiming, ZHENG Jin. Insulation Coordination for ±800kV UHVDC Converter Stations [J]. High Voltage Engineering,2006,32(9):75-79.
[18] 南方电网技术研究中心. 云广±800 kV直流输电工程绝缘配合研究报告 [R]. 广州:南方电网技术研究中心,2005.

China South Grid Research Center. Yunnan-Guangdong Line ±800kV DC Transmission Project Insulation Coordination Study Report [R]. Guangzhou:China South Grid Research Center,2005.
[19] 张翠霞,刘乙方. ±800 kV直流输电工程过电压保护与绝缘配合研究 [J]. 中国电力,2006,39(10):43-46.

ZHANG Cuixia, LIU Yifang. Study on Over-Voltage Protection and Insulation Coordination for the ±800kV DC Power Transmission Project [J]. Electric Power,2006,39(10):43-46.
[20] 聂定珍,袁智勇. ±800 kV向家坝—上海直流工程换流站绝缘配合 [J]. 电网技术,2007,31(14):1-5.

NIE Dingzhen, YUAN Zhiyong. Research on Insulation Coordination for Converter Stations of ±800 kV UHVDC Project from Xiangjiaba to Shanghai [J]. Power System Technology,2007,31(14):1-5.
[21] 刘振亚,舒印彪,张文亮,等. 直流输电系统电压等级序列研究 [J]. 中国电机工程学报,2008,28(10):1-8.

LIU Zhenya, SHU Yinbiao, ZHANG Wenliang, et al. Study on Voltage Class Series for HVDC Transmission System [J]. Proceedings of the CSEE,2008,28(10):1-8.
[22] SZECHTMAN M, WESS T, THIO C V W. First Benchmark Model for HVDC Control Studies[J]. Eletra, 1991,135:54-73.
[23] 南方电网技术研究中心.云南—广东±800 kV直流输电工程直流保护和直流滤波器保护研究报告 [R]. 广州:南方电网技术研究中心,2005.

South Grid Research Center. Yunnan-Guangdong ±800 kV DC Transmission Project: DC Protextion Study Report [R]. Guangzhou:South Grid Research Center, 2005.