[1] ES-AENOR.Dependability management-Part3-3:application guide-life cycle costing:IEC 60300-3-3 [S]. Switzerland: International Electrotechnical Commission, 2017.
[2] 《资产管理体系应用指南》编写组.资产管理体系应用指南 [M].北京:企业管理出版社,2016.

Asset management System Application Guideline Authoring Group.Asset management System Application Guideline [M]. Beijing:Enterprise Management Publishing House,2016.
[3] 帅军庆.电力企业资产全寿命周期管理:理论、方法及应用 [M].北京:中国电力出版社,2010.

SHUAIJ Q.Power enterprise asset life cycle management:theory,method and application [M].Beijing:China Electric Power Press,2010.
[4] 李根臣.电网企业固定资产管理研究 [D].北京:华北电力大学(北京),2007.

LIG C.Research of fixed assets management in electric grids enterprise [D]. Beijing:North China Electric Power University(Beijing),2007.
[5] 徐翀.全寿命周期成本管理在电力设备管理中的应用探讨 [J].中国电力,2010,43(3):72-74.

XUC.Research of the application in power equipments’LCC management [J].Electric Power,2010,43(3):72-74.
[6] 郭基伟,谢敬东,唐国庆. 电力设备管理中的寿命周期费用分析 [J]. 高电压技术,2003,29(4):13-15+37.

GUOJ W,XIEJ D,TANGG Q. Life cycle cost analysis in electrical equipment management [J]. High Voltage Engineering,2003,29(4):13-15+37.
[7] 张媛.基于灰色系统理论的电力设备全寿命周期成本评估及模型 [D].重庆:重庆大学,2008.

ZHANGY. Electric power equipment’slife cycle cost assessment and model based on grey system theory [D].Chongqing:Chongqing University,2008.
[8] 李效臻. 基于全生命周期的二次设备技改策略研究 [J]. 南方能源建设,2015,2(增刊1):212-217+225.

LIX Z. Research on technical transformation strategy of secondary equipment based on the life cycle cost [J]. Southern Energy Construction,2015,2(Supp.1):212-217+225.
[9] 黎洪光,林家俊,庄远灿,等. 基于全寿命周期成本的配电网合环运行经济性评估方法 [J]. 南方能源建设,2016,3(2):162-166+161.

LIH G,LINJ J,ZHUANGY C,et al. Economic evaluation of closed loop operation of distribution network based on life cycle cost [J]. Southern Energy Construction,2016,3(2):162-166+161.
[10] 张俊.基于全寿命周期成本(LCC)的变电站建设的决策分析 [D].重庆:重庆大学,2007.

ZHANGJ. Decision-making analyseof electric substation’s construction based on life cycle costs [D].Chongqing:Chongqing University,2007.