[1] 马泉, 钱小军, 司风琪, 等. 燃气—蒸汽联合循环机组热电负荷特性分析 [J]. 热能动力工程, 2019, 34(2): 14-22.

MAQ, QIANX J, SIF Q, et al. Analysis on thermoelectric load characteristics of gas—steam combined cycle unit [J]. Journal of Engineering for Thermal Energy and Power, 2019, 34(2): 14-22.
[2] 黄超群, 王波, 张士杰, 等. F/G/H级重型燃气轮机联合循环底循环热力性能简明估算模型 [J]. 中国电机工程学报, 2019, 39(21): 6320-6328.

HUANGC Q, WANGB, ZHANGS J, et al. Concise estimation model of thermodynamic performance for bottom cycle of F/G/H-class heavy duty gas turbine combined cycle [J]. Proceedings of the CSEE, 2019, 39(21): 6320-6328.
[3] 杨承, 刘换新, 王平, 等. 燃气—蒸汽联合循环抽凝式热电联供机组调峰经济性分析 [J]. 中国电机工程学报, 2020, 40(2): 592-601.

YANGC, LIUH X, WANGP, et al. Economic analysis on peak—regulation of GTCC cogeneration unit with extraction heating [J]. Proceedings of the CSEE, 2020, 40(2): 592-601.
[4] 戈志华, 马立群, 何洁, 等. 燃气-蒸汽联合循环热电联产机组多种运行方式负荷特性研究 [J]. 中国电机工程学报, 2020, 40(8):2587-2597.

GEZ H, MAL Q, HEJ, et al. Study on load characteristics of multiple operation modes of gas-steam combined cycle cogeneration unit [J]. Proceedings of the CSEE,2020, 40(8):2587-2597.
[5] 曾勇, 曾颖. 燃气热电联产机组选型、调峰能力及电价机制分析 [J]. 南方能源建设, 2015, 2(1): 66-70.

ZENGY, ZENGY. Research on unit selection, peak regulation capability and electricity pricing mechanism of gas-fired cogeneration [J]. Southern Energy Construction, 2015, 2(1): 66-70.
[6] 曾勇, 曾颖. 热电联产机组的电力调峰运行模式研究 [J]. 南方能源建设, 2015, 2(3): 51-56.

ZENGY, ZENGY. Research of cogeneration units acting on electric peak-shaving operating mode [J]. Southern Energy Construction, 2015, 2(3): 51-56.
[7] 焦树建. 燃气轮机与燃气-蒸汽联合循环装置 [M]. 北京:中国电力出版社,2007.

JIAOS J. Gas turbine and gas-steam combined cycle equipments [M]. Beijing:China Electric Power Press,2007.
[8] 马悦, 李江波, 董舟, 等. 基于单轴M701F4联合循环的主厂房布置优化方案 [J]. 河北工业科技, 2014, 31(6): 512-518.

MAY, LIJ B, DONGZ, et al. Layout design optimization of combined cycle main building based on single-shaft M701F4 [J]. Hebei Journal of Industrial Science and Technology, 2014, 31(6): 512-518.
[9] 闫红亮. F级联合循环机组主厂房布置方案研究 [J]. 价值工程, 2014, 33(18): 36-37.

YANH L. Design analysis of main building of class F combined cycle power plant [J]. Value Engineering, 2014, 33(18): 36-37.
[10] 中华人民共和国国家经济贸易委员会.燃气—蒸汽联合循环电厂设计规定:DL/T 5174—2003 [S].北京:中国电力出版社,2003.

State Economic and Trade Commission of the People’s Republic of China. Design rule for combined—cycle power plants: DL/T 5174—2003 [S]. Beijing: China Electric Power Press, 2003.
[11] 中华人民共和国住房和城乡建设部.建筑设计防火规范:GB 50016—2014(2018版) [S].北京:中国计划出版社,2018.

Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for fire protection design of buildings: GB 50016—2014(2018) [S].Beijing: China Planning Press, 2018.