核能工业供热项目汽轮机与反应堆匹配分析

Matching Analysis Between Reactors and Steam Turbines for Nuclear Industrial Heating Projects

  • 摘要:
    目的 经过多年探索,我国核能供热目前已实现从试验到示范、再到商用的突破,多个新建核电项目也提出供热要求。随着“双碳”目标的推进,有效利用核能供热已是我国能源结构改革、降碳减排的重要途径之一。
    方法 依托现有核能工业供汽项目的技术特点,对“华龙一号”和高温气冷堆2种典型核电机组的汽轮机匹配方案,从供热能力、机型选取、经济性分析、实施方案等方面开展对比研究。
    结果 推荐“华龙一号”机组采用1200 MW全容量等级机组,高温气冷堆机组采用350 MW半容量等级机组。
    结论 在实际工程中,应首先调研确定供热负荷需求;选择汽轮机时应以确保核安全、满足核岛满功率运行为前提,综合考虑各类供热工况及核岛启停调试工况,以应对未来热负荷变化风险,合理开展汽轮机选型,实现堆、机、热协同匹配。

     

    Abstract:
    Objective After several years of exploration, China's nuclear heating has achieved breakthroughs from pilot test to demonstration and then to commercial application. A number of newly-built nuclear power projects have also put forward heating requirements. With the advancement of the Dual Carbon goals, effective utilization of nuclear heating has become one of the key pathways for China's energy structure reform and carbon emission reduction.
    Method Based on the technical characteristics of existing nuclear industrial steam supply projects, a comparative study on turbine matching schemes of two typical nuclear power units, Hualong One (HPR1000) and HTR-PM, was carried out, focusing on heating capacity, model selection, economic analysis, and implementation plans.
    Result The research recommends that the Hualong One unit adopt the 1200 MW full-capacity grade unit, and the high-temperature gas-cooled reactor unit adopt the 350 MW half-capacity grade unit.
    Conclusion In practical engineering, the heating load demand should be investigated and determined first. For steam turbine selection, ensuring nuclear safety and full-power operation of the nuclear island shall be taken as the premise. Various heating conditions, nuclear island start-up and commissioning conditions shall be comprehensively considered to cope with the risk of future heat load changes. The steam turbine should be reasonably selected to achieve collaborative matching of the reactor, turbine and heat supply.

     

/