海上风电场施工安装风险管理研究

元国凯, 朱光涛, 黄智军

元国凯, 朱光涛, 黄智军. 海上风电场施工安装风险管理研究[J]. 南方能源建设, 2016, 3(S1): 190-193. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.043
引用本文: 元国凯, 朱光涛, 黄智军. 海上风电场施工安装风险管理研究[J]. 南方能源建设, 2016, 3(S1): 190-193. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.043
YUAN Guokai, ZHU Guangtao, HUANG Zhijun. Construction and Installation Risk Management of Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 190-193. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.043
Citation: YUAN Guokai, ZHU Guangtao, HUANG Zhijun. Construction and Installation Risk Management of Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 190-193. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.043
元国凯, 朱光涛, 黄智军. 海上风电场施工安装风险管理研究[J]. 南方能源建设, 2016, 3(S1): 190-193. CSTR: 32391.14.j.gedi.issn2095-8676.2016.S1.043
引用本文: 元国凯, 朱光涛, 黄智军. 海上风电场施工安装风险管理研究[J]. 南方能源建设, 2016, 3(S1): 190-193. CSTR: 32391.14.j.gedi.issn2095-8676.2016.S1.043
YUAN Guokai, ZHU Guangtao, HUANG Zhijun. Construction and Installation Risk Management of Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 190-193. CSTR: 32391.14.j.gedi.issn2095-8676.2016.S1.043
Citation: YUAN Guokai, ZHU Guangtao, HUANG Zhijun. Construction and Installation Risk Management of Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 190-193. CSTR: 32391.14.j.gedi.issn2095-8676.2016.S1.043

海上风电场施工安装风险管理研究

基金项目: 

中国能建广东院科技项目"海上风机基础建造、安装以及大直径桩基沉桩可实施性和风险评估研究"(EV02971W)

详细信息
    作者简介:

    元国凯(1986),男,湖南岳阳人,工程师,硕士,主要从事海上风电场结构设计与研发工作(e-mail)yuanguokai@gedi.com.cn。

  • 中图分类号: TM614

Construction and Installation Risk Management of Offshore Wind FarmEn

  • 摘要: 随着经济与社会的发展,海上风力发电已成为可再生能源发展的重要方向,与陆上风电相比,海上风电建设的技术难度和经济成本将明显提高,是制约其快速发展的瓶颈之一。以某典型海上风电场建设为例,应用风险管理理论,针对海上风电场建设中的基础施工、风机安装、海缆敷设、升压站施工等主体工程,进行风险的识别、分析并提出相应的控制措施,为类似海上风电场施工建设提供风险管控的参考。
    Abstract: With the economic and social development, offshore wind power has become an important direction of renewable energy development. Compared with onshore wind farm, the difficulty and economic cost of offshore wind farm construction will be significantly increased, which become one of the constraints of its rapid development. In this paper, a typical offshore wind farm construction was studied. By using risk management process, risks of the main projects including offshore wind turbine foundation construction, turbine installation, submarine cable laying, offshore substation construction was identified, analyzed and treated. The corresponding treatments provide good reference for the similar offshore wind farm construction and installation.
  • 期刊类型引用(8)

    1. 吉其荣,陶闯,张智杨. 海上风电场风机安装风险辨识及对策. 珠江水运. 2024(21): 16-18 . 百度学术
    2. 元国凯,李耀能,卢钦先,张京伟,李煜东. 以设计为龙头的海上风电工程总承包项目管理研究. 南方能源建设. 2022(01): 1-8 . 本站查看
    3. 黄炎生,许志雄. 海上升压站上部组块吊装施工技术研究. 中国住宅设施. 2021(12): 129-130 . 百度学术
    4. 孙敬东,钟庆云,邓巍. 基于电子围栏及声光预警系统的海上风电场安全保障方法研究. 中国水运. 2020(05): 60-63 . 百度学术
    5. 陈诚,凌德贵,曾旻. 金沙江向家坝枢纽河段航道助航设施配布设计的研究. 中国水运. 2020(09): 67-69 . 百度学术
    6. 逯辉. 海上风电工程潮间带施工的安全管理. 中国港湾建设. 2019(12): 74-78 . 百度学术
    7. 曹毅,涂亮,聂金峰,周育忠. 欧洲海上风电标准化经验及其对我国的启示. 南方电网技术. 2019(03): 3-11 . 百度学术
    8. 郑伯兴,苏荣,冯奕敏. 海上风电场升压站风险分析与管控研究. 南方能源建设. 2018(S1): 228-231 . 本站查看

    其他类型引用(7)

计量
  • 文章访问数:  759
  • HTML全文浏览量:  125
  • PDF下载量:  69
  • 被引次数: 15