Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction
-
摘要: [目的] 总结分析南方电网范围内新建变电站图实不符验收及消缺问题。 [方法] 结合工程实例提出一种三步骤消缺及管理模式,从设计前期、设计过程、现场施工等阶段分批进行、分段消化。 [结果] 从投产工程可以看出这种管理方法明晰了各方的责任和义务,提高了项目管理的执行力度,降低了验收中出现的图实不符数量。 [结论] 此统筹协调方法可避免工程后期出现大量图实不符整改,节省了人力成本,推进了工程顺利投产,也为今后EPC总承包项目提供了一种管理方案。Abstract: [Introduction] The discrepancy between design drawings and construction layouts has become one of the principle problems during the construction of convertor station. [Method] In this paper, a Three-Stage Management Mode for discrepancy elimination was discussed, which was implemented in newly built convertor stations of China Southern Power Grid. In this Mode, staged discrepancy eliminating solutions focusing respectively on preliminary design, detailed design and construction were provided. [Result] It helps to clarify the responsibilities and obligations of parties involved in the project, reduce the number of the discrepancies. [Conclusion] This mode can avoid waste of manpower and other resources for rectification of those discrepancies, and thus improve the efficiency of project management and proceed the project into commercial operation smoothly.
计量
- 文章访问数: 343
- HTML全文浏览量: 63
- PDF下载量: 28
- 被引次数: 0