2×350 MW超临界机组主厂房布置优化设计探讨

Discussion on Optimization Design of 2×350 MW Supercritical Unit's Main Plant Arrangement

  • 摘要:
      目的  为了分析单排架-联合侧煤仓方案对350 MW等级热电机组主厂房容积、投资、维护等方面的影响。
      方法  通过对国电兰州热电2×350 MW异地扩建超临界机组工程主厂房独立侧煤仓和联合侧煤仓、单排架和单框架的布置格局、结构尺寸等方面优化过程的介绍,比较了该项目不同主厂房布置方案对前期投资、后期运行维护的影响。
      结果  在便于机组安全正常运行维护的前提下,本项目采用该方案可比容积达到了0.287 m³/kW的良好水平。
      结论  通过分析,此主厂房布置设计方案有较好实用价值,可供类似城市热电联产工程参考。

     

    Abstract:
      Introduction  In order to analyze the impact of the single rack-joint side bunker scheme on the capacity, investment and maintenance of the main building of 350 MW thermoelectric unit.
      Method  Through the introduction of the optimization process of the layout pattern and structure size of the front coal bunker, side coal bunker, single row rack and single frame of the 2x350 MW off-site expansion of the supercritical unit project of Guodian Lanzhou thermal power Co., Ltd., the impact of different layout plans of the project on the investment in the early stage and the operation and maintenance in the later stage was compared.
      Result  On the premise of facilitating safe and normal operation and maintenance of the unit, the project adopts this scheme to achieve a good level of 0.287 m3 /kW.
      Conclusion  Through analysis, the main building arrangement design scheme has a good practical value, which can be used as a reference for similar urban cogeneration projects.

     

/