[1] 叶奇蓁.我国核电及核能产业发展前景 [J].南方能源建设,2015,2(4):18-21.

YEQ Z. Development and prospect of nuclear power and nuclear energy industry in China [J]. Southern Energy Construction,2015,2(4):18-21.
[2] 中核网.国家能源局给予批复:“华龙一号”将落地福清5、6号 [J].中国核工业,2014(11):6.

China National Nuclear Network.Reply of national energy administration on "Hualong No.1" landing on Fuqing No.5 and No.6 [J].China Nuclear Industry,2014(11):6.
[3] 张宏韬,李想,郭爱华.关于推进第三代核电关键仪控系统国产化的探索 [J].自动化仪表,2016,37(11):48-51.

ZHANGH T,LIX,GUOA H. Exploration on promoting the localization of the critical instrumentation and control system for the third generation nuclear power [J]. Process Automation Instrumentation,2016,37(11):48-51.
[4] 朱明皓,孙虎,邵立国.工业基础能力托起中国制造2025 [J].装备制造,2014(8):46-49.

ZHUM H,SUNH,SHAOL Q.Industrial basic capacity supporting made in China 2025 [J].China Equipment,2014(8):46-49.
[5] 王淦刚,赵建仓,朱平,等.核电用焊材国产化研究现状与应用发展趋势 [J].金属加工(热加工),2015(8):15-16.

WANGG G,ZHAOJ C,ZHUP,et al.Research status and application development trend of domestic welding materials for nuclear power [J].Metal Forming,2015(8):15-16.
[6] 顾银祥,李想. 上海核电运行服务体系建设研究 [J].南方能源建设,2015,2(4):170-175+46.

GUY X,LIX. Strategic thinking of "going out" strategy for Shanghai nuclear power industry [J]. Southern Energy Construction,2015,2(4):170-175+46.
[7] 张茂龙.第三代核电核岛主设备关键制造技术及发展 [J].南方能源建设,2015,2(4):16-17.

ZHANGM L.Key manufacturing technology and development of the third-generation NPP nuclear island major components [J]. Southern Energy Construction,2015,2(4):16-17.
[8] 佚名. Guiding opinions of the ministry of industry and information technology on accelerating the development basic industry capacity [N].China Electronic News. 2014-02-28(003).
[9] 张宏韬,刘伟瑞. 关于推进上海核电技术装备自主化的探索与思考 [J].南方能源建设,2018,5(1):22-28.

ZHANGH T,LIUW R. Exploration and speculation of promoting Autonomation of nuclear technical equipment in Shanghai [J]. Southern Energy Construction,2018,5(1):22-28.
[10] 徐玉明.中国核电发展的进展与战略 [J].南方能源建设,2015,2(4):1-2.

XUY M. Progress and strategy of PWR nuclear power development in China [J]. Southern Energy Construction,2015,2(4):1-2.