[1] 中国南方电网有限责任公司. 南方电网公司35 kV~500 kV变电站标准设计(V2.1) [M]. 北京:中国电力出版社,2018.

China Southern Power Grid Company Limited. Standard design of South China Power Grid Corp 35 kV~500 kV substation(V2.1) [M]. Beijing:China Electric Power Press,2018.
[2] 由恒远,屈东明,孙福鹏. 模块化预制仓式变电站在110 kV配网中的应用 [J]. 电气技术,2016(5):105-108.

YOU H Y, QU D M, SUN F P. Mo dular prefabricated warehouse substation for 110 kV distribution [J]. Technology and Application,2016(5):105-108.
[3] 曾锐碧,范绍有. 装配式建筑在变电站中的应用及研究 [J]. 南方能源建设,2015,2(增刊1):239-243.

ZENG R B, FAN S Y. Application and research of the prefabricated building for substation [J]. Southern Energy Construction,2015,2(Supp. 1):239-243.
[4] 刘建光,祝昌团. 变电站装配式建筑设计研究与应用 [J]. 南方能源建设,2017,4(增刊1):78-83.

LIU J G, ZHU C T. Research and application of prefabricated substation architectural design [J]. Southern Energy Construction,2017,4(Supp. 1):78-83.
[5] 中华人民共和国建设部. 火力发电厂与变电站设计防火规范:GB 50229—2006 [S]. 北京:中国计划出版社,2007.

Ministry of Construction of the People′s Republic of China. Code or design of fire protection for fossil fuel power plants and substations:GB 50229—2006 [S]. Beijing:China Planning Press,2007.
[6] 中华人民共和国住房与城乡建设部. 建筑设计防火规范:GB 50016—2014 [S]. 北京:中国计划出版社,2014.

Ministry of housing and urban-rural development of People′s Republic of China. Code for fire protection design of buildings:GB 50016—2014 [S]. Beijing:China Planning Press,2014.
[7] 中华人民共和国国家发展和改革委员会. 变电站总布置与设计技术规程:DL/T 5056—2007 [S]. 北京:中国电力出版社,2008.

National Development and Reform Commission. Technical code of general plan design for substation:DL/T 5056—2007 [S]. Beijing:China Electric Power Press,2008.
[8] 张贤超,尹健,池漪. 透水混凝土性能研究综述 [J]. 混凝土,2010(12):47-50.

ZHANG X C, YIN J, CHI Y. Summary of performance for pervious concrete [J]. Concrete,2010(12):47-50.