[1] 胡玉清,马先才. 我国热电联产领域现状及发展方向 [J]. 黑龙江电力,2008, 30(1): 79-80.

HU Yuqing, MA Xiancai. Situation and Developing Trend on Combining Heat and Power System [J]. Heilongjiang Electric Power, 2008, 30(1): 79-80.
[2] 康艳兵,张建国,张扬. 我国热电联产集中供热的发展现状、问题与建议 [J]. 中国能源,30(10): 8-13.

KANG Yanbing, ZHANG Jianguo, ZHANG Yang. The Development Status, Problems and Suggestions of Centralized Heating for Cogeneration Units in China [J]. Energy of China, 30(10): 8-13.
[3] 贺茂石. 热电联产机组电力调峰运行可行性研究 [D]. 北京:华北电力大学,2012.

HE Maoshi. Feasibility Study on Operation for Power Peaking of Cogeneration Units [D]. Beijing: North China Electric Power University, 2012.
[4] 曾勇,曾颖. 燃气热电联产机组选型、调峰能力及电价机制分析 [J]. 南方能源建设,2015, 2(1): 66-70.

ZENG Yong;ZENG Ying. Research on Unit Selection,Peak Regulation Capability and Electricity Pricing Mechanism of Gas-fired Cogeneration [J]. Southern Energy Construction, 2015, 2(1): 66-70.
[5] 黄大为,郭君宜. 热电联产机组参与系统调峰的调度策略 [J]. 电力系统及其自动化学报,2014, 26(3): 35-39.

HUANG Dawei, GUO Junyi. Cogeneration Units Involved in System Peak-shaving Scheduling Policy [J]. Journal of Electric Power System and Automation, 2014, 26(3): 35-39.
[6] 张宇,鄂志军,刘卫平,等. 热电联产机组调峰能力的研究与应用 [J].电力系统及其自动化学报,2013, 25(3): 115-118.

ZHANG Yu, E Zhijun, LIU Weiping, et al. Cogeneration Units Peak-shaving Ability Research and Application [J]. Journal of Electric Power System and Automation, 2013, 25(3): 115-118.
[7] 吕学勤,刘刚,黄自元. 电力调峰方式及其存在的问题 [J]. 电站系统工程,2007, 23(5): 37-40.

LÜ Xueqin, LIU Gang, HUANG Ziyuan. The Adjusting Discharge Peak Methods and the Exiting Questions [J]. Power System Engineering, 2007, 23(5): 37-40.
[8] 张晓晖,陈钟颀. 热电冷联产系统的能耗特性 [J]. 中国电机工程学报,2007, 27(5): 93-98.

ZHANG Xiaohui, CHEN Zhongqi. Energy Consumption Characteristics of Thermal Power Plant System [J]. Proceedings of the CSEE, 2007, 27(5): 93-98.
[9] 郭君宜,王玉坤,吴刚. 热电联产电力调峰运行模式研究 [J].黑龙江科技信息,2013(29): 125.

GUO Junyi, WANG Yukun, WU Gang. Cogeneration Peak-shaving Operating Mode Study [J]. Journal of Heilongjiang Science and Technology Information, 2013(29): 125.
[10] 邱张华,戴辉阳,阚安康. 燃气热电联产系统的节能分析 [J]. 能源研究与信息,2007, 23(4): 237-242.

QIU Zhanghua, DAI Huiyang, KAN Ankang.Gas Cogeneration System Energy Saving Analysis [J]. Journal of Energy Research and Information, 2007, 23(4): 237-242.
[11] 张建业,徐述. 热电联产项目中机组的选型及参数确定方法 [J]. 电力设备,2008, 9(1): 72-75.

ZHANG Jianye, XU Shu. Selection and Parameter Determination Method in Cogeneration Units Project [J]. Electrical Equipment, 2008, 9(1): 72-75.
[12] 吴华. 燃气热电厂供热调峰的运行优化研究 [D]. 华北电力大学. 2012.
[13] 忻祎. 燃气—蒸汽联合循环电厂热电联产的优化配置 [D]. 上海交通大学,2007.
[14] 孙科,郭江龙,常澍平. 热电联产机组定电负荷下热负荷经济调度的试验研究 [J]. 节能,2013(9): 14-17.

SUN Ke, GUO Jianglong, CHANG Shuping. Cogeneration Units Heat Load Economic Dispatch Test Research Under Electricity Load [J]. Energy Conservation. 2013(9): 14-17.
[15] 周云,徐彤,王新雷. 300MW热电联产机组热经济性研究 [J]. 能源技术经济,2012, 24(4): 57-61.

ZHOU Yun, XU Tong, WANG Xinlei. 300MW Cogeneration Units Thermal Efficiency Study [J]. Energy Technology and Economics, 2012, 24(4): 57-61.
[16] 吕红缨,朱宁. 300 MW供热机组选型问题的探讨 [J]. 重庆电力高等专科学校学报,2006, 11(2): 8-10.

LÜ Hongying, ZHU Ning. An Approach to the Problem About Type Selection of 300 MW Cogeneration Unit [J]. Journal of Chongqing Electric Power College, 2006, 11(2): 8-10.
[17] 宋伟明,丁军威. 热电联产电厂供热的直接和间接效益分析 [J]. 华电技术,2015, 37(1): 1-4, 76.

SONG Weiming, DING Junwei. Analysis of Direct and Indirect Benefit of Cogeneration Power Plants [J]. Huadian Technology, 2015, 37(1): 1-4, 76.