[1] 冯伟忠. 900 MW超临界机组FCB试验 [J]. 中国电力,2005,38(2): 74-77.

FENG W Z. FCB test for 900 MW supercritical units [J]. Electric Power, 2005, 38(2): 74-77.
[2] 冯伟忠. 1 000 MW超超临界机组FCB试验 [J]. 中国电力,2008,41(10): 62-66.

FENG W Z. FCB test on 1 000 MW ultra-supercritical power generation unit [J]. Electric Power, 2008, 41(10): 62-66.
[3] 冯伟忠. 大机组实现FCB的现实性及技术分析 [J]. 上海电力,2007(3): 246-251.

FENG W Z. The realism and technical analysis of implementing FCB for the large coal-fired power units [J]. Shanghai Electric Power, 2007(3): 246-251.
[4] 沈丛奇,周新雅,姚峻. 火电机组FCB功能及其在电网恢复中的应用 [J]. 上海电力,2007(3): 251-254.

SHEN C Q, ZHOU X Y, YAO J. FCB function of coal-fired power unites and its application in power grid restoration [J]. Shanghai Electric Power, 2007(3): 251-254.
[5] 郭鑫. 大型发电机组FCB功能的探讨 [J]. 华北电力技术,2010(2): 22-23.

GUO X. Discussion of FCB function of large power generation set [J]. North China Electric Power, 2010(2): 22-23.
[6] 王立地,林苗丹. FCB工况下100%汽轮机旁路合理性探讨 [J]. 电力技术,2010,19(11): 39-44.

WANG L D, LIN M D. Discussion on the rationality of the 100% capacity of steam turbine bypass under FCB conditions [J]. Electric Power Technology, 2010, 19(11): 39-44.
[7] 谭金. 国产超临界机组实现快速切负荷的若干技术问题探讨 [J]. 广东电力,2010,23(10): 50-53.

TAN J. Discussion of technical problems in FCB on home made supercritical units [J]. Guangdong Electric Power, 2010, 23(10): 50-53.