[1] 刘学山. 广州抽水蓄能电站二期工程钢筋混凝土岔管高压渗水的处理及有关问题探讨 [J]. 广东电力,2006,19(6): 39-42.

LIU X S. Study on treatment and relevant problems of HP leakage in reinforced concrete manifold of Guangzhou Pumped Storage Power Station Phase-Ⅱ project [J]. Guangdong Electric Power, 2006, 19(6): 39-42.
[2] 陈颖豪. 广蓄电站水工建筑物设计运行总结 [C]//中国水力发电工程学会抽水蓄能专委会.抽水蓄能电站建设经验技术交流会,福州,2002. 北京:中国水力发电工程学会,2002:57-59.
[3] 叶冀昇. 广蓄电站水工隧洞设计施工的若干问题 [J]. 水力发电学报,1998(2): 38-49.

YE J S. Key issues concerning the design and construction of high-pressure power tunnels of Guangzhou pumped storage project [J]. Journal of Hydroelectric Engineering,1998(2): 38-49.
[4] 毕仁友,李明. 响水水电站高压埋管失稳破坏的探讨 [J]. 水利技术监督,2003,11(4): 47-52.

BI R Y, LI M. Discuss on the unstable failure of high pressure pipe in Xiangshui hydroelectric station [J]. Technical Supervision in Water Resources,2003,11(4): 47-52.
[5] 叶复萌,何其,陈婉瑜. 广州蓄能水电厂安全监测系统改造设计[R].广州:广州蓄能水电厂,2015.