[1] 刘卫,胡丹云,栗树果. 泰国电厂总承包商项目投标技术特点及对策 [J]. 上海电气技术,2013, 6(1): 57-62.

LIU Wei, HU Danyun, LI Shuguo. Technical Characteristics and Countermeasure Analysis During Bidding Stage for EPC Power Plant Project in Thailand [J]. Journal of Shanghai Electric Technology, 2013, 6(1): 57-62.
[2] FIDIC国际咨询工程师联合会. FIDIC工程设计建造总承包与交钥匙工程合同条件 [M]. 陈彪,译.石家庄:中国兵器工业第六设计研究院,1997.
[3] 龙辉,董银柱. 煤质和锅炉辅助系统对600 MW机组厂用电率的影响 [J]. 吉林电力,2003(6): 39-41.

LONG Hui, DONG Yinzhu. Effect of Coal and Auxiliary Systems on Station Service Power Consumption Rate of 600 MW Unit [J]. Jilin Electric Power, 2003(6): 39-41.
[4] 刘慧军,胡建忠,袁军. 1 000 MW机组循环水泵厂用电率计算方法的探讨 [J]. 电力建设,2011, 32(2): 76-79.

LIU Huijun, HU Jianzhong, YUAN Jun. Estimation Method for Auxiliary Power Consumption Rate of Circulating Water Pump in 1 000 MW Unit [J]. Electric Power Construction, 2011, 32(2): 76-79.
[5] GB 50660—2011,火力发电厂设计技术规程 [S].
[6] 孙和. 关于厂用电率和发电量的回归分析 [J]. 云南电力技术. 1999, 27(1): 12-13.

SUN He. Recursive Analysis on the Auxiliary Power Consumption Rate with Power Generation [J]. Yunnan Electric Power, 1999, 27(1): 12-13.
[7] 吴文杰. 国产630 MW超临界机组厂用电率煤耗水耗指标测算模型 [J]. 电力技术,2009(12): 34-40,51.

WU Wenjie. Calculation Model of Auxiliary Power Consumption Rate and Coal Consumption and Water Consumption of 630 MW Supercritical Unit [J]. Electric Power Technology, 2009(12): 34-40, 51.
[8] 张建中. 我国超(超)临界火电机组实际投运水平评述 [J]. 电力建设,2009, 30(4): 1-9.

ZHANG Jianzhong. Review of Actual Operation Level of China's SC/USC Thermal Unit [J]. Electric Power Construction, 2009, 30(4): 1-9.
[9] DL/T 5153—2014,火力发电厂厂用电设计技术规定 [S].
[10] 徐静. BTG项目中的厂用电量计算方法分析 [J]. 上海电气技术,2011, 4(3): 50-53.

XU Jing. Analysis on the Method of Auxiliary Power Consumption for BTG Program [J]. Journal of Shanghai Electric Technology, 2011, 4(3): 50-53.