FU Hao,LI Weicong,LIN Weibo.Research on Implementation Plan and Migration of Intelligent Construction Site for Newly-Built Power Plant[J].Southern Energy Construction,2022,09(增刊1):24-29.. DOI: 10.16516/j.gedi.issn2095-8676.2022.S1.004
Citation: FU Hao,LI Weicong,LIN Weibo.Research on Implementation Plan and Migration of Intelligent Construction Site for Newly-Built Power Plant[J].Southern Energy Construction,2022,09(增刊1):24-29.. DOI: 10.16516/j.gedi.issn2095-8676.2022.S1.004

Research on Implementation Plan and Migration of Intelligent Construction Site for Newly-Built Power Plant

  •   Introduction  In order to meet the needs of digital and intelligent transformation of power enterprises and to adapt the strict requirements of new power plants on safety and quality management of engineering construction,
      Method  an intelligent site management system was put forward and its construction scheme , functional module, and reasonable transition scheme to production period were introduced.
      Result  The intelligent site management system based on Internet of things, big data, cloud platform technology, and intelligent terminal equipment can realize the comprehensive management and control of personnel, facilities, environment, and management.
      Conclusion  The intelligent site management system proposed in this paper can effectively improve the management efficiency and intelligent level of power enterprises, and also provide a reference for the construction site management mode of new power plants.