[1] 常胜, 李炬添, 张振, 等. 海上风电场联合送出优化方案研究 [J]. 南方能源建设, 2019, 6(2): 49-53. DOI:  10.16516/j.gedi.issn2095-8676.2019.02.009.

CHANG S, LI J T, ZHANG Z, et al. Research on offshore wind farm optimization scheme for joint delivery [J]. Southern Energy Construction, 2019, 6(2): 49-53. DOI:  10.16516/j.gedi.issn2095-8676.2019.02.009.
[2] 崔东岭, 江春, 史忠秋, 等. 大型海上风电项目中的集电海缆研究 [J]. 南方能源建设, 2020, 7(2): 98-102. DOI:  10.16516/j.gedi.issn2095-8676.2020.02.015.

CUI D L, JIANG C, SHI Z Q, et al. Research on array submarine cables in large offshore windfarm [J]. Southern Energy Construction, 2020, 7(2): 98-102. DOI:  10.16516/j.gedi.issn2095-8676.2020.02.015.
[3] 王亚东, 伍林伟, 高彬, 等. 砂质海床条件下海底电缆埋深研究 [J]. 南方能源建设, 2020, 7(3): 81-88. DOI:  10.16516/j.gedi.issn2095-8676.2020.03.010.

WANG Y D, WU L W, GAO B, et al. Research on the burial depth of submarine cable in sandy seabed [J]. Southern Energy Construction, 2020, 7(3): 81-88. DOI:  10.16516/j.gedi.issn2095-8676.2020.03.010.
[4] 吴庆华, 马凌, 岳浩, 等. 500 kV海南联网工程海底电缆线路设计 [J]. 上海电气技术, 2021, 14(3): 5-9+43.

WU Q H, MA L, YUE H, et al. Design of submarin cable line of 500 kV Hainan power link project [J]. Journal of Shanghai Electric Technology, 2021, 14(3): 5-9+43.
[5] 张冲. 海上风电项目长距离海缆敷设ROV后冲埋施工探析 [J]. 福建建筑, 2021(9): 41-43.

ZHANG C. Exploration and analysis of burying construction by ROV after laying for long-distance submarine cable in offshore wind power project [J]. Fujian Architecture & Construction, 2021(9): 41-43.
[6] 中华人民共和国住房和城乡建设部. 电力工程电缆设计标准: GB 50217—2018 [S]. 北京: 中国计划出版社, 2018.

Ministry of Housing and Urban-Rural Development of the People′s Republic of China. Standard for design of cables of electric power engineering: GB 50217−2018 [S]. Beijing: China Planning Press, 2018.
[7] 庄元, 宋少桥. 海底管线埋深问题研究 [J]. 大连海事大学学报, 2013, 39(1): 61-64. DOI:  10.16411/j.cnki.issn1006-7736.2013.01.004.

ZHUANG Y, SONG S Q. Study on the depth of submerged pipeline [J]. Journal of Dalian Maritime University, 2013, 39(1): 61-64. DOI:  10.16411/j.cnki.issn1006-7736.2013.01.004.
[8] 陈峰, 汪嘉钰, 别亦白, 等. 不同土质条件下大抓力锚的落锚深度研究 [J]. 港工技术, 2017, 54(5): 43-48. DOI:  10.16403/j.cnki.ggjs20170512.

CHEN F, WANG J Y, BIE Y B, et al. Study on penetration depth of high holding power anchors under different soil conditions [J]. Port Engineering Technology, 2017, 54(5): 43-48. DOI:  10.16403/j.cnki.ggjs20170512.
[9] 杜颖, 陈峰, 徐伟. 砂土基质下落锚深度试验研究及计算方法 [J]. 南方能源建设, 2018, 5(增刊1): 222-227. DOI:  10.16516/j.gedi.issn2095-8676.2018.S1.040.

DU Y, CHEN F, XU W. Experimental study and calculation method of falling anchor depth under sand soil [J]. Southern Energy Construction, 2018, 5(Supp. 1): 222-227. DOI:  10.16516/j.gedi.issn2095-8676.2018.S1.040.
[10] 徐伟, 汪嘉钰, 郑志源, 等. 船舶拖锚对海底电缆埋深的影响 [J]. 船海工程, 2018, 47(1): 147-150+154. DOI:  10.3963/j.issn.1671-7953.2018.01.033.

XU W, WANG J Y, ZHENG Z Y, et al. Influence of dragging anchor upon the buried depth of submarine cable [J]. Ship & Ocean Engineering, 2018, 47(1): 147-150+154. DOI:  10.3963/j.issn.1671-7953.2018.01.033.
[11] 郭振邦, 张群站, 徐慧. 海底管道关于锚泊作业的定量风险评估 [J]. 天津理工大学学报, 2007, 23(5): 85-88. DOI:  10.3969/j.issn.1673-095X.2007.05.025.

GUO Z B, ZHANG Q Z, XU H. Quantitative risk assessment of submarine pipeline in anchoring [J]. Journal of Tianjin University of Technology, 2007, 23(5): 85-88. DOI:  10.3969/j.issn.1673-095X.2007.05.025.
[12] 王凤云, 赵冬岩, 王琮. 关于海底管线挖埋深度的规范标准研究 [C]// 中国海洋工程学会. 第十五届中国海洋(岸)工程学术讨论会, 太原, 2011. 北京: 海洋出版社, 2011: 407-410.

WANG F Y, ZHAO D Y, WANG Z. Study on the standard of the depth of submarine pipeline excavation [C] //Chinese Ocean Engineering Society. The 15th Conference on China Ocean (Shore) Engineering, Taiyuan, 2011. Beijing: China Ocean Press, 2011: 407-410.
[13] 马良, 王金英. 海底管道埋设技术论证 [J]. 中国海洋平台, 1999, 14(6): 17-20.

MA L, WANG J Y. A demonstration on the laying and burying of subsea pipeline [J]. China Offshore Platform, 1999, 14(6): 17-20.
[14] 马良, 王金英. 海底管道的埋设 [J]. 油气储运, 1993, 12(1): 27-30.

MA L, WANG J Y. Embedment of subsea pipeline [J]. Oil & Gas Storage and Transportation, 1993, 12(1): 27-30.
[15] 国家能源局. 城市电力电缆线路设计技术规定: DL/T 5221-2016 [S]. 北京: 中国电力出版社, 2005.

National Energy Administration. Technical rule for design of urban power cables: DL/T 5221−2016 [S]. Beijing: China Electric Power Press, 2005.
[16] 中山茂雄, 清宫理. 投锚与入土深度试验 [R]. 横须贺: 日本运输省港湾技术研究所, 1975.

SHIGEO N, QING G L. Anchor dropping and soil depth test [R]. Yokosuka: Institute of Harbor Technology, Ministry of Transport, Japan, 1975.