Hongwei DENG, Zhanpeng LIANG, Kun HU. Research on Mechanical Design Features of 2×1 240 MW Unit for Yangxi Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(4): 37-41. DOI: 10.16516/j.gedi.issn2095-8676.2017.04.008
Citation: Hongwei DENG, Zhanpeng LIANG, Kun HU. Research on Mechanical Design Features of 2×1 240 MW Unit for Yangxi Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(4): 37-41. DOI: 10.16516/j.gedi.issn2095-8676.2017.04.008

Research on Mechanical Design Features of 2×1 240 MW Unit for Yangxi Power Plant

More Information
  • Received Date: May 24, 2017
  • The thermodynamic system design, the main building layout design, the main and auxiliary equipments configuration design were reviewed in detail for Guangdong Yangxi power plant 2×1 240 MW ultra supercritical units, which expound the important significance of the construction of the first domestic over 600 ℃ and 1 200 MW grade ultra supercritical units, it achieves the breakthrough of China's thermal power generation technology and thermal power technology manufacturing industry. The design can be used as a reference for similar large capacity units design.
  • [1]
    刘鹤忠,叶勇健. 当前技术条件下火电机组最大单机容量的探讨 [J]. 电力建设,2011,32(2):67-70.

    LIU H Z, YE Y J. Discussion on the largest possible capacity of thermal power unit under present technology level [J]. Electrical Power Construction,2011,32(2):67-70.
    [2]
    王东雷,张鹏. 1 200 MW等级超超临界机组可行性研究 [J]. 电力建设,2015,36(2):131-136.

    WANG D L, ZHANG P,Feasibility study on 1 200 MW ultra-supercritical unit [J]. Electrical Power Construction,2015,36(2):131-136.
    [3]
    徐雪元. 1 200 MW超超临界参数锅炉的研制与开发 [J]. 电力建设,2010,31(3):60-62.

    XU X Y,1 200 MW USC parameter boiler development [J]. Electrical Power Construction, 2010,31(3):60-62.
    [4]
    华洪. 西门子1 000 MW超超临界汽轮机的技术特点 [J]. 上海电力,2005(4):408.

    HUA H,Technology features of Siemens 1 000 MW ultra-supercritical steam turbine [J]. Shanghai Electric,2005(4):408.
    [5]
    梅林波,沈红卫,王思玉. 620 ℃超超临界汽轮机机组新型高温转子钢的应用 [J]. 热力透平,2014,43(3):219-221.

    MEI L B, SHEN H W, WANG S Y. Application of advanced rotor steel in 620 ℃ USC steam turbines [J]. Thermal Turbine,2014,43(3): 219-221.
    [6]
    刘明慧. 自主研发世界最大容量1 240 MW火电发电机 [J]. 电机技术,2014(3):31.

    Liu M H. Independent research and development of the world's largest capacity 1 240 MW thermal power generator [J]. Motor Technology,2014(3):31.
    [7]
    石司默. 100%高压旁路对超超临界锅炉设计的影响 [J]. 锅炉制造,2016(5):21-24.

    SHI S M. Influence of 100% high-pressure bypass to USC boiler design [J]. Boiler Manufacturing,2016(5):21-24.
    [8]
    范永春,霍沛强. 1 000 MW超超临界机组主厂房布置格局探讨 [J]. 电力勘测设计,2009(5):36-39.

    FAN Y C, HE P Q. Discussion on main building layout of 1 000 MW ultra super critical unit [J]. Electric Power Survey & Design,2009(5):36-39.
    [9]
    马晓峰,李宏保. 1 000 MW汽轮机组单/双例高压加热器选型 [J]. 黑龙江电力,2008,30(6):450-452.

    MA X F, LI H B. Selection of single row/double row high pressure heater for 1 000 MW unit [J]. Heilongjiang Electric Power,2008,30(6):450-452.
    [10]
    陈俊斌. 1 200 MW超超临界机组三壳体凝汽器的特点分析 [J]. 电站辅机,2016,37(3):11-13.

    CHEN J B. Characteristic analysis of three shell condenser for 1 200 MW ultra supercritical power unit [J]. Power Station Auxiliary Equipment, 2016,37(3):11-13.
    [11]
    凌芳,霍沛强,邓成刚,等. 1 000 MW等级湿冷机组回热级数优化研究 [J]. 南方能源建设,2014,1(1):45-49.

    LING F, HUO P Q, DENG C G,et al. Optimization of regenerative stage numbers for 1 000 MW wet cooling units [J]. Southern Energy Construction,2014,1(1):45-49.
  • Related Articles

    [1]TAN Xueqian, YAN Jianjun, WU Lizhi, PENG Hongfu, CAI Jiming. Application of Gas Film Coal Yard in Large Capacity Coastal Thermal Power Plant in Guangdong Province[J]. SOUTHERN ENERGY CONSTRUCTION, 2024, 11(S1): 122-126. DOI: 10.16516/j.ceec.2024.S1.19
    [2]WANG Qingqin, WEN Guobiao. Site Selection and Layout of Distributed Offshore Wind Power Based on Energy and Transportation Integration[J]. SOUTHERN ENERGY CONSTRUCTION, 2024, 11(2): 59-67. DOI: 10.16516/j.ceec.2024.2.06
    [3]LI Xinkai, XIANG Kui, LI Hua, ZHU Guangtao. General Layout Optimization for Fusion Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2022, 9(2): 63-69. DOI: 10.16516/j.gedi.issn2095-8676.2022.02.008
    [4]Kan LI, Kun WEI, Qicheng ZHAO. System Design and Typical Layout of 850 t/d Grate Furnace Garbage Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(S1): 88-92. DOI: 10.16516/j.gedi.issn2095-8676.2021.S1.014
    [5]Sheng LIU, Yan BA. Research on Layout Plan of Offshore Step-down Substation for Oilfield Group Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(2): 99-104. DOI: 10.16516/j.gedi.issn2095-8676.2021.02.015
    [6]Yang HUANG, Jianwu WANG, Xiang LU, Xionghui HUANG. Research on Equipment Selection and Optimal Layout of Intensive Green Converter Station[J]. SOUTHERN ENERGY CONSTRUCTION, 2020, 7(1): 107-112. DOI: 10.16516/j.gedi.issn2095-8676.2020.01.017
    [7]HU Lingling. Research on the Layout Design of the Inlet Air Flow Measurement Device ofthe Positive Pressure Direct Injection System[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 31-34. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.008
    [8]Wei DING. Research on Connecting to Power Grid Engineering Solution for 500 kV Superconducting Fault Current Limiter[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(4): 42-46. DOI: 10.16516/j.gedi.issn2095-8676.2016.04.009
    [9]Fei LI. Reliability Application and Research of Domestic DCS System in Ultra-supercritical Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(3): 85-90. DOI: 10.16516/j.gedi.issn2095-8676.2016.03.018
    [10]Yonggen CHEN, Afeng WU, Weike LI, Zuogang GUO, Peiting LIANG. Design of a New Solar-powered Combined Heating and Cooling System[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(2): 76-79. DOI: 10.16516/j.gedi.issn2095-8676.2015.02.014
  • Cited by

    Periodical cited type(0)

    Other cited types(1)

Catalog

    Kun HU

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (483) PDF downloads (380) Cited by(1)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return