Citation: | GUAN Yanyan,ZHUANG Jiacai.Research on Schedule Management Method of Offshore Wind Power Based on Risk Management[J].Southern Energy Construction,2022,09(01):34-39.. DOI: 10.16516/j.gedi.issn2095-8676.2022.01.005 |
GUAN Yanyan,ZHUANG Jiacai.Research on Schedule Management Method of Offshore Wind Power Based on Risk Management[J].Southern Energy Construction,2022,09(01):34-39.
[1] |
姜红丽, 刘羽茜, 冯一铭, 等. 碳达峰、碳中和背景下"十四五"时期发电技术趋势分析 [J/OL]. 发电技术: 1-12. (2021-12-31) [2022-01-29]. http://kns.cnki.net/kcms/detail/33.1405.TK.20211230.1108.006.html.
JIANGH L, LIUY X, FENGY M, et al. Analysis of power generation technology trend during the 14th Five-Year Plan under the background of Carbon peak and Carbon neutral [J/OL]. Power Generation Technology: 1-12. (2021-12-31) [2022-01-29]. http://kns.cnki.net/kcms/detail/33.1405.TK.20211230.1108.006.htm.
|
[2] |
万佑卿, 谢煜. 碳中和目标下我国减排机制的研究 [J]. 中国林业经济, 2022(1): 99-103. DOI: 10.13691/j.cnki.cn23-1539/f.2022.01.021.
WANY Q, XIEY. Research on China's emission reduction mechanism under the target of carbon neutrality [J]. China Forestry Economy, 2022(1): 99-103. DOI: 10.13691/j.cnki.cn23-1539/f.2022.01.021.
|
[3] |
张金鑫. 风力发电机组发电性能分析与优化 [J]. 中国设备工程, 2021(17): 117-118. DOI: 10.3969/j.issn.1671-0711.2021.17.074.
ZHANGJ X. Power generation performance analysis and optimization of wind turbine [J]. China Plant Engineering, 2021 (17): 117-118. DOI: 10.3969/j.issn.1671-0711.2021.17.074.
|
[4] |
蒋海波, 刘长栋. 我国海上风电发展现状研究及平价发展建议 [J]. 煤质技术, 2021, 36(6): 70-76. DOI: 10.3969/j.issn.1007-7677.2021.
JIANGH B, LIUC D. Research on the development of offshore wind power in China and suggestions for parity development [J]. Goal Quality Technology, 2021, 36(6): 70-76. DOI: 10.3969/j.issn.1007-7677.2021.
|
[5] |
韩鑫, 张家豪. 海上风电EPC建设模式中的风险防范研究 [J]. 水电与新能源, 2021, 35(9): 32-34. DOI: 10.13622/j.cnki.cn42-1800/tv.1671-3354.2021.09.008.
HANX, ZHANGJ H. Research on risk prevention of offshore wind power projects with EPC construction mode [J]. Hydropower and New Energy, 2021, 35(9): 32-34. DOI: 10.13622/j.cnki.cn42-1800/tv.1671-3354.2021.09.008.
|
[6] |
武东宽. 海上风电项目进度管理案例研究 [D]. 北京: 华北电力大学, 2019. DOI: 10.27140/d.cnki.ghbbu.2019.001168.
WUD K. Case study on schedule management of offshore wind power project [D]. Beijing: North China Electric Power University, 2019. DOI: 10.27140/d.cnki.ghbbu.2019.001168.
|
[7] |
于自强. 海上风电建设项目的风险管理研究 [D]. 北京: 北京邮电大学, 2020. DOI: 10.26969/d.cnki.gbydu.2020.000414.
YUZ Q. Research on risk management of offshore wind power construction project [D]. Beijing: Beijing University of Posts and Telecommunications, 2020. DOI: 10.26969/d.cnki.gbydu.2020.000414.
|
[8] |
刘晋超. 海上风电施工窗口期对施工的重要性 [J]. 南方能源建设, 2019, 6(2): 16-18. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.003.
LIUJ C. Importance of window phase for offshore wind power construction [J]. Southern Energy Construction, 2019, 6(2): 16-18. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.003.
|
[9] |
岳奇, 邵文宏, 毕星, 等. 中国海上风电规划与补贴政策演化博弈分析 [J]. 海洋湖沼通报, 2021, 43(6): 66-73. DOI: 10.13984/j.cnki.cn37-1141.2021.06.010.
YUEQ, SHAOW H, BIX, et al. Evolutionary game analysis of China's offshore wind power planning and subsidy policy [J]. BTransactions of Oceanology and Limnology, 2021, 43 (6): 66-73. DOI: 10.13984/j.cnki.cn37-1141.2021.06.010.
|
[10] |
张亦弛. 电力市场化背景下海上风电扶持政策的借鉴与思考 [J]. 油气与新能源, 2021, 33(6): 52-57. DOI: 10.13984/j.cnki.cn37-1141.2021.06.010.
ZHANGY C. Evolutionary game analysis of China's offshore wind power planning and subsidy policy [J]. Transactions of Oceanology and Limnology, 2021, 33(6): 52-57. DOI: 10.13984/j.cnki.cn37-1141.2021.06.010.
|
[11] |
林新辉. 海上风电项目的风险分析及应对措施 [J]. 福建建材, 2020(4): 112-114.
LINX H. Risk analysis and countermeasures for offshore wind power projects [J]. Fujian Building Materials, 2020(4): 112-114.
|
[12] |
中国能源报. 我国海上风电迎来规模化发展黄金期[J]. 稀土信息, 2021(11): 36-37.
China Energy News . China's offshore wind power has ushered in a golden period of large-scale development [J]. Rare Earth Information, 2021(11): 36-37.
|
1. |
杨伟华,胡雪扬,张浦阳,甘毅,陈青山. 砂土中海上倾斜螺旋群桩基础承载特性研究. 南方能源建设. 2024(02): 82-92 .
![]() | |
2. |
杨薛亮,黄柳生,王坤. 海上风机调试过程风险与应对措施分析. 中国机械. 2024(13): 73-76 .
![]() | |
3. |
范广鹏. 风电工程建设中的风险因素与管理模式优化分析. 中国战略新兴产业. 2024(24): 79-81 .
![]() | |
4. |
周俊新. 规模化风电工程精细化进度管理的应用. 城市建设理论研究(电子版). 2023(02): 50-52 .
![]() | |
5. |
何知纯,谢敏,黄莹,李弋升,张世平. 基于连续隐马尔可夫模型的风水火联合低碳检修优化. 南方能源建设. 2023(04): 43-56 .
![]() | |
6. |
童旭. 某陆上风电机组选型、布置及技术经济性研究. 机电信息. 2023(23): 1-7 .
![]() | |
7. |
张京伟,李献军,贾震江,王丽艳,周华. 海上风电总承包项目设备交付精细化管理研究. 电力勘测设计. 2022(09): 1-6+82 .
![]() |