Yinxiang GU, Xiang LI. Research on the Construction of Shanghai Service System for Nuclear Power Operation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 170-175,46. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.032
Citation:
Yinxiang GU, Xiang LI. Research on the Construction of Shanghai Service System for Nuclear Power Operation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 170-175,46. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.032
Yinxiang GU, Xiang LI. Research on the Construction of Shanghai Service System for Nuclear Power Operation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 170-175,46. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.032
Citation:
Yinxiang GU, Xiang LI. Research on the Construction of Shanghai Service System for Nuclear Power Operation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 170-175,46. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.032
Research on the Construction of Shanghai Service System for Nuclear Power Operation
Based on urgent need to develop the constraction of service system for nuclear power operation, the paper deeply analyzes the status and characteristics, proposes the construction strategies, support measures and policy suggestion, which provides direction and ways for this system constuction
Disclaimer: The English version of this article is automatically generated by Baidu Translation and only for reference. We therefore are not responsible for its reasonableness, correctness and completeness, and will not bear any commercial and legal responsibilities for the relevant consequences arising from the English translation.