WANG Hao. Study on Construction Bid Section Division of Coal-fired Power Plants Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 230-233. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.051
Citation:
WANG Hao. Study on Construction Bid Section Division of Coal-fired Power Plants Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 230-233. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.051
WANG Hao. Study on Construction Bid Section Division of Coal-fired Power Plants Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 230-233. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.051
Citation:
WANG Hao. Study on Construction Bid Section Division of Coal-fired Power Plants Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 230-233. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.051
Study on Construction Bid Section Division of Coal-fired Power Plants Project
Introduce the engineering characteristics of coal-fired power plants project briefly and choose a theoretical calculation model-bid section division model based on the theory of transaction cost. Use the bid section division model based on the theory of transaction costs to calculate the result of DUYEN HAI 1 THERMAL POWER PLANT PROJECT's bid sections division, discuss the advantage and disadvantage of this model and put forward the improvement of the theoretical calculation model in actual application.
Disclaimer: The English version of this article is automatically generated by iFLYTEK Translation and only for reference. We therefore are not responsible for its reasonableness, correctness and completeness, and will not bear any commercial and legal responsibilities for the relevant consequences arising from the English translation.