Citation: |
Zhengyu HUANG, Hanjie HU. |
[1] |
黄政宇. “华龙一号”核电工程混凝土管理模式研究 [J]. 南方能源建设,2016, 3(3): 116-121.
HUANG Z Y. Research on concrete management patterns of HPR 1 000 NPP [J]. Southern Energy Construction, 2016, 3(3): 116-121.
|
[2] |
孙汉虹,程平东. 核电工程项目管理[M]. 北京:中国电力出版社,2006,11(1): 4-11.
SUN H H. CHENG P D. Nuclear Project Management [M]. Beijing: China Electric Power Press,2006,11(1):4-11.
|
[3] |
何润财,涂国富. EPC工程总承包项目中采购成本控制 [J]. 南方能源建设,2016, 3(增刊1): 173-176.
HE R C, TU G F. Procurement cost control in EPC general contract project [J]. Southern Energy Construction, 2016, 3(Supp.1): 173-176.
|
[4] |
汪映荣,中电投核电有限公司.核电前期工作指南 [M]. 北京:中国电力出版社,2012: 10-98.
WANG Y R, CPI Nuclear Power Co., Ltd. Nuclear Power Preliminary Work Guidance [M]. Beijing: China Electric Power Press, 2012: 10-98.
|
[5] |
刘小坚. 核电前期项目公众沟通问题研究 [J]. 南方能源建设,2017, 4(4): 8-14.
LIU X J. Research on public communication of nuclear preliminary project in China [J]. Southern Energy Construction, 2017, 4(4): 8-14.
|
[6] |
李永华,白晋华. 结合福岛核事故探讨IAEA核电厂设计安全要求 [J]. 南方能源建设,2015, 2(4): 155-158.
LI Y H, BAI J H. Study on the safety requirements of nuclear power plants design based on Fukushima nuclear accident feedback [J]. Southern Energy Construction, 2015, 2(4): 155-158.
|
[7] |
秦晋. 海外总承包项目前期税务筹划分析 [J]. 南方能源建设,2017, 4(增刊1): 179-184.
QIN J. Analysis of advance tax planning for overseas EPC project [J]. Southern Energy Construction, 2017, 4(Supp.1): 179-184.
|
[8] |
张羽,胡亮. 关于总承包业务设计优化、采购成本控制的思考 [J]. 南方能源建设,2016, 3(增刊1): 165-167+185.
ZHANG Y, HU L. Design optimization and procurement cost control of EPC project [J]. Southern Energy Construction, 2016, 3(Supp.1): 165-167+185.
|
[9] |
张菊梅,苏非,吴强,等. 浅析“十一五”及“十二五”期间抽水蓄能电站造价水平 [J]. 南方能源建设,2017,4(增刊1): 150-153.
ZHANG J M, SU F, WU Q, et al. Analysis of the cost level of pumped storage power station during the 11th five year plan and the 12th five year plan period [J]. Southern Energy Construction, 2017, 4(Supp.1): 150-153.
|
[10] |
罗莎莎,韩冰,刘云,等. 广东抽水蓄能电站功能发挥情况研究 [J]. 南方能源建设,2017, 4(3): 69-74.
LUO S S, HAN B, LIU Y, et al. Research on the main functions of pumped-storage plants in Guangdong [J]. Southern Energy Construction, 2017, 4(3): 69-74.
|
1. |
王林. 新时期核电企业成本精益化管理问题与对策分析. 中国集体经济. 2025(14): 77-80 .
![]() | |
2. |
徐晓斌,刘利星,侯振坤,李莉,王占华,张敏. 基于GIS的山区铁路枢纽土石方工程测绘技术研究. 南方职业教育学刊. 2023(02): 104-109 .
![]() |