Advanced Search
Zhe ZHANG. Application Research on Control Building in 500 kV Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(1): 109-113. DOI: 10.16516/j.gedi.issn2095-8676.2019.01.019
Citation: Zhe ZHANG. Application Research on Control Building in 500 kV Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(1): 109-113. DOI: 10.16516/j.gedi.issn2095-8676.2019.01.019

Application Research on Control Building in 500 kV Substation

More Information
  • Received Date: December 18, 2017
  • Revised Date: August 11, 2018
  •   [Introduction]  In order to realize the standardized architectural design, factory processing and assembly construction for substations.
      [Method]  The control building of 500 kV substation was taken as the research object, and the location of its industrial facilities was specified according to the functional requirements of the substation. Through comprehensive consideration of process flow, functional requirements, building materials, building technology, natural conditions and other factors, the selection of building materials, structural type selection, modular design, fire prevention, energy saving and other aspects were comparative analysis.
      [Result]  The results show that the structure and wall integrated assembly system under the existing conditions is the most suitable for 500 kV substation.
      [Conclusion]  The structure and wall integrated assembly system is feasible and representative.
  • [1]
    曾锐碧,范绍有. 装配式建筑在变电站中的应用及研究 [J]. 南方能源建设,2015,2(增刊1): 239-243.
    [2]
    张锡治,李义龙,安海玉. 预制装配式混凝土剪力墙结构的研究与展望 [J]. 建筑科学,2014,30(1): 26-30.
    [3]
    张爱林,胡婷婷,刘学春. 装配式钢结构住宅配套外墙分类及对比分析 [J]. 工业建筑,2014,44(8): 7-9.
    [4]
    张波,李建新. 建筑工业化装配式外墙板的选择 [J]. 广东建材,2013,29(7): 5-8.
    [5]
    叶增平. 建筑工业化装配式复合外墙板的发展现状与趋势 [J]. 福建建设科技,2016(1): 28-30.
    [6]
    陈建伟,苏幼坡. 预制装配式剪力墙结构及其连接技术 [J]. 世界地震工程,2013,29(1): 38-48.
    [7]
    蒋勤俭.国内外装配式混凝土建筑发展综述 [J]. 建筑技术,2010,41(12): 1074-1077.
    [8]
    梁桂保,张友志. 浅谈我国装配式住宅的发展进程 [J]. 重庆工学院学报,2006,20(9): 50-52.
  • Cited by

    Periodical cited type(3)

    1. 雷蕾,李昱,张玉明,钟炜辉. ±800kV特高压换流站钢框架主控制楼结构设计. 电力勘测设计. 2022(01): 49-54 .
    2. 常伟,陈乐,王茂忠,张玉明,李学鹏. 装配式建构筑物在特高压换流站工程中的应用. 东北电力技术. 2022(01): 50-55+62 .
    3. 刘超,高奔浩,李景哲,胡子明,王静峰. 装配式变电站主变基础模块化设计方法研究. 工程与建设. 2020(06): 1076-1078 .

    Other cited types(0)

Catalog

    Zhe ZHANG

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (516) PDF downloads (26) Cited by(3)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return