Advanced Search
WANG Yadong,WU Linwei,GAO Bin,et al.Research on the Burial Depth of Submarine Cable in Sandy Seabed[J].Southern Energy Construction,2020,07(03):81-88.. DOI: 10.16516/j.gedi.issn2095-8676.2020.03.010
Citation: WANG Yadong,WU Linwei,GAO Bin,et al.Research on the Burial Depth of Submarine Cable in Sandy Seabed[J].Southern Energy Construction,2020,07(03):81-88.. DOI: 10.16516/j.gedi.issn2095-8676.2020.03.010

Research on the Burial Depth of Submarine Cable in Sandy Seabed

More Information
  • Received Date: January 09, 2020
  • Revised Date: May 05, 2020
  • [Introduction] In order to obtain the safe burial depth of the submarine cable under the conditions of the sandy seabed and to ensure that the submarine cable is not threatened by the anchor, the safe burial depth of the anchor under the conditions of the sea sand seabed is given.
      Method  In order to verify of the reasonableness and safety of the buried depth, based on the South China & Hainan power grid interconnection project I, the process of dragging anchor in sandy seabed was simulated, and the 3D finite element model of Hall’s anchor was established. The 3D sandy seabed numerical model based on Finite Element Method and Smooth Particle Hydrodynamics (FEM-SPH) was established. The process of dragging anchor was simulated and the drag curve of anchor in sandy seabed was obtained. The influence of mass of anchor, constitutive parameter and other factor to the penetration depth and drag force was analyzed.
      Result  The simulation results show that the buried depth of the submarine cable should not be less than 0.35 m under the condition of sandy seabed with different soil quality.
      Conclusion  Our results can provide theoretical basis and technical support for the design of submarine cable protection under sandy seabed conditions, and also can optimize the buried depth of submarine cables under sandy seabed conditions.
  • WANG Yadong,WU Linwei,GAO Bin,et al.Research on the Burial Depth of Submarine Cable in Sandy Seabed[J].Southern Energy Construction,2020,07(03):81-88.

  • [1]
    于俊岭,吴海洋,张轶,等. 海底电缆登陆浅滩防冲刷措施研究 [J]. 中国电业:(技术版),2014(10):85-88.

    YUJ L,WUH Y,ZHANGY,et al. Research on scour-prevention measure for submarine cable landed shoal [J]. China Electric Power (Technology Edition),2014(10):85-88.
    [2]
    刘晓霞,高强,脱浩虎,等. 海底光电复合缆的落锚撞击试验与仿真研究 [J]. 石油机械,2017,45(1):62-69.

    LIUX X,GAOQ,TUO H H,et al. Field test and numerical modeling of submarine photoelectric composite cable under anchor impact [J]. China Petroleum Machinery,2017,45(1):62-69.
    [3]
    苏荣,元国凯. 海上风电场海底电缆防护方案研究 [J]. 南方能源建设,2018,5(2):121-125.

    SUR, YUANG K. Protection schemes of submarine power cables in offshore wind farm [J]. Southern Energy Construction,2018,5(2):121-125.
    [4]
    吴庆华,陈建康,郑伟,等. 中国首条500 kV海底电缆线路工程的设计 [J]. 中国电业:(技术版),2014(10):46-54.

    WUQ H,CHENJ K,ZHENGW,et al. Design of the first 500 kV submarine cable line project in China [J]. China Electric Power (Technology Edition),2014(10):46-54.
    [5]
    张正祥,曾二贤,吴海洋,等. 海底电缆抛石堤坝洋流稳定性的试验研究 [J]. 电力勘测设计,2015(1):49-53+80.

    ZHANGZ X,ZENGE X,WUH Y,et al. Experimental research on stability of jackstone dam under current action for protecting submarine cable [J]. Electric Power Survey & Design,2015(1):49-53+80.
    [6]
    WANGY D,WUH Y,SUNX M. Research on the depth of submarine cable laying in Hainan interconnection project [C]// Anon.China Electric Power Planning and Design Association,Power Transmission and Transformation Expert Committee 2014 Working Meeting,Beijing,China,August 6th,2014.Beijing:China Electric Power Planning and Design Association,2014:163-166.
    [7]
    VERITASDETNORSKE.Trawlboard/anchor penetration study for nexans [R]. Norway:Det Norske Veritas,2008.
    [8]
    高大钊.土力学与基础工程 [M].武汉理工大学出版社,2014.
    [9]
    周波. 双轴立式螺旋开沟机工作部件切土性能研究 [D]. 武汉:华中农业大学,2012.
    [10]
    张磊. 基于船舶应急抛锚的海底管道埋深及保护研究 [D]. 武汉:武汉理工大学,2013.
    [11]
    ALLANP G.Selecting appropriate cable burial depths – a methodology [C]//Anon.Submarine Cable Improvement Group,Conference Proceedings of IBC Submarine Communication 1999,Cannes,1999. Cannes:Submarine Cable Improvement Group,1999:16-18.
    [12]
    SLEEGERSJ, WURFFA. Hacking discussion in cannes [J]. Vakblad Voor De Bloemisterij, 2013, 68(1):30-31.
    [13]
    ALLANP G,COMRIER J,et al. The selection of appropriate burial tools and burial depths [C]// Anon.Submarine Cable Improvement Group,Conference Proceedings of IBC Submarine Communication 2001,Kyoto,2001.Kyoto:Submarine Cable Improvement Group,2001:1-8.
    [14]
    王迎松.锚泊贯入量的研究 [D]. 大连:大连海事大学,2015.
    [15]
    冯雅萍,李英,吴子昂. 船舶抛锚对浅水区埋置管道的损伤分析 [J]. 船海工程,2017,46(4):169-172.

    FENGY P,LIY,WUZ A.Analysis of impact on submarine buried pipelines from dropped anchor in shallow water [J]. Ship and ocean engineering,2017,46(4):169-172.
    [16]
    张鹏杨,王瑛剑,柯超,等. 海缆路由区船锚贯入量的研究分析 [J]. 光通信技术,2016,40(10):60-62.

    ZHANGP Y,WANGY J,KEC,et al. Research and analysis of anchor penetration on submarine cables route area [J]. 2016,40(10):60-62.
  • Cited by

    Periodical cited type(1)

    1. 林福. 用于柔直换流阀例行试验的控制保护系统研制. 自动化技术与应用. 2020(06): 27-33+57 .

    Other cited types(1)

Catalog

    Erxian ZENG

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Figures(24)  /  Tables(5)

    Article Metrics

    Article views (881) PDF downloads (61) Cited by(2)

    /

    DownLoad:  Full-Size Img  PowerPoint