Analysis on the Factors Affecting the Cost of Underground Pipe Gallery

More Information
  • Received Date: June 05, 2017
  • Under the vigorous promotion of national policies, the construction of underground pipe gallery with large investment has developed rapidly. The investors face greater financial pressure. The article analyzed the cost level and cost composition of the UPG, and discussed the influence of the construction conditions, coordination with the underground project, section size, dwell depth, the old pipelines migration to the cost level. It provides a reference for the planning and design of UPG, the estimated preparation and the cost management, and helps to control the cost of UPG effectively and the sustainable development of the UPG.
  • Related Articles

    [1]YE Kaihui. Substation Engineering Cost Prediction Based on Support Vector Regression[J]. SOUTHERN ENERGY CONSTRUCTION, 2024, 11(S1): 100-105. DOI: 10.16516/j.ceec.2024.S1.15
    [2]Chang XU, Molin HE, Cheng YANG, Yingjie ZHANG, ✉. Analysis of Influence Factors of Load Characteristics in Guizhou[J]. SOUTHERN ENERGY CONSTRUCTION, 2020, 7(S1): 36-41. DOI: 10.16516/j.gedi.issn2095-8676.2020.S1.007
    [3]Jinlan HU, Bingqian WANG, Jianmin DONG. Analysis on Cost Management Status Quo and Development Trend of Distribution Network Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(2): 106-111. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.019
    [4]XU Fei, HOU Enzhen, SUN Hao, ZHANG Lei. Research and Practice on Cost Model of Multi-Smart Metering Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(S1): 143-149. DOI: 10.16516/j.gedi.issn2095-8676.2017.S1.027
    [5]Ziyi WU, Wei ZHOU, Yu XIAO. Analysis of Substation Project Cost Level in Sichuan and Tibet High Altitude Area[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(2): 133-139. DOI: 10.16516/j.gedi.issn2095-8676.2015.02.026
    [6]Qiang WU, Qingjie KONG. Research on the Engineering Cost Management of Pumped-Storage Power Station Project with Agency CM Mode[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(1): 104-109. DOI: 10.16516/j.gedi.issn2095-8676.2015.01.020
  • Cited by

    Periodical cited type(9)

    1. 孔祥玲. 影响城市地下综合管廊工程造价的因素及优化措施. 价值工程. 2024(27): 70-72 .
    2. 左文敏. 施工工法对城市地下综合管廊造价的影响分析. 江西建材. 2024(07): 382-384 .
    3. 冉岸绿,吴剑秋,韩应祥,李昌泽,司阳. 城市地下综合管廊施工技术研究与应用. 工程技术研究. 2022(10): 37-39 .
    4. 饶晓敏. 影响城市地下综合管廊工程造价的因素及控制措施. 四川建材. 2021(02): 217-218 .
    5. 孙盛楠,徐晓晔,刘文智. 秦皇岛海港区建设城市地下管廊的投资融资及成本分析研究. 财富生活. 2020(04): 103-104 .
    6. 张建昂. 影响城市地下综合管廊工程造价的因素分析. 工程造价管理. 2020(01): 47-51 .
    7. 康剑伟. 东南沿海软土地区某管廊基坑支护工程实例分析. 福建建筑. 2020(06): 58-61 .
    8. 胡晋岚,王丙乾,董剑敏. 配网工程造价管理现状及发展趋势分析. 南方能源建设. 2019(02): 106-111 . 本站查看
    9. 钟晖,吴景福,黄涛,张鹏,刘晓昌. 青岛市地下综合管廊建设期成本控制研究. 工程经济. 2019(07): 8-11 .

    Other cited types(4)

Catalog

    ZHANG Shilang

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (367) PDF downloads (697) Cited by(13)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return