Qian LI, Xuejun WANG, Jingyi WANG, Chunping PAN, Junxiang LIU. Analysis on the Lightning Performance and Anti-accident Measures of ±800 kV Bipolar Blocking of Polar Wires and Electrode Wires on the Same Tower[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(4): 86-91. DOI: 10.16516/j.gedi.issn2095-8676.2018.04.013
Citation: Qian LI, Xuejun WANG, Jingyi WANG, Chunping PAN, Junxiang LIU. Analysis on the Lightning Performance and Anti-accident Measures of ±800 kV Bipolar Blocking of Polar Wires and Electrode Wires on the Same Tower[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(4): 86-91. DOI: 10.16516/j.gedi.issn2095-8676.2018.04.013

Analysis on the Lightning Performance and Anti-accident Measures of ±800 kV Bipolar Blocking of Polar Wires and Electrode Wires on the Same Tower

More Information
  • Received Date: March 27, 2018
  • Revised Date: June 18, 2018
  •   [Introduction]  In order to saving the transmission line corridor, the ±800 kV polar wires and electrode wires have been erected on the same tower in the highly urbanized areas such as Guangzhou and Shenzhen. There is an potential risk of bipolar blocking to HVDC system due to configuration of the same tower for both ±800 kV polar wires and electrode wires, but there is little research on it in China.
      [Method]  In this paper, the process of bipolar blocking caused by the lightning stroke in hybrid transmission lines was analyzed. Taking a project as an example, this paper calculated the lightning flashover rate of hybrid transmission line which erecting polar wires and electrode wires on the same tower by using the ATP-EMTP electromagnetic transient simulation program and the electrical geometric model. Based on this, several measures to reduce the risk of bipolar blocking were discussed.
      [Results]  The results show that the lightning flashover rate of hybrid transmission line is lower than the independent erecting DC lines. Measures of adding line lightning arrester in the electrode wires, replacing the electrode wires of tower cross-arm for the composite cross-arm, adding the electrode wires insulation level can effectively reduce the risk of bipolar blocking. By comparison of technology and economy, this paper recommended the case project is adopted to improve the electrode wires insulation level as the anti-accident measures. It is suggested that case project should be equipped with 15 pieces of 170 mm structure height insulator.
      [Conclusion]  This results provide certain technical support for the design of HVDC lines in congested areas.
  • [1]
    赵婉君. 高压直流输电工程技术 [M]. 北京:中国电力出版社,2004.
    [2]
    李倩,廖民传,陈云云,等. ±800 kV特高压直流线路与接地极线路共塔专题研究 [R]. 广州:中国能源建设集团广东省电力设计研究院有限公司,2015.
    [3]
    陈水明,谢海滨,屠幼萍,等. ±500 kV直流极线与接地极线同塔架设时的感应过电压 [J]. 高电压技术,2012,38(5):1186-1191.

    CHEN S M,XIE H B,TU Y P,et al. Induced overvoltage while ±500 kV pole line and neutral line using common-tower [J]. High Voltage Engineering,2012,38(5):1186-1191.
    [4]
    任达勇. 天广直流工程历年双极闭锁事故分析 [J]. 高电压技术,2006,32(9):173-175.

    REN D Y. Analysis of bipole block events over the years of Tian-Guang HVDC project [J]. High Voltage Engineering,2006,32(9):173-175.
    [5]
    张建设,韩伟强,黄立滨. 兴安直流双极闭锁反事故措施实时仿真研究 [J]. 南方电网技术,2008,2(4):83-87.

    ZHANG J S,HAN W Q,HUANG L B,et al. Real-time simulation study on anti-accident measures of bipolar block in Xing-An HVDC project [J]. Southern Power System Technology,2008,2(4):83-87.
    [6]
    李倩,刘俊翔. 交直流同走廊输电线路地面电场研究 [J]. 南方能源建设,2016,3(增刊1):107-111.

    LI Q,LIU J X. Research on the total electric field under HVAC-HVDC ajacent-tower hybrid transmission lines [J]. Southern Energy Construction,2016,3(Supp.1):107-111.
    [7]
    吴子怡,周唯. 滇西北至广东特高压直流送端换流站融冰方案技术经济分析 [J]. 南方能源建设,2017,4(3):131-135.

    WU Z Y,ZHOU W. Selection analysis of northwest Yunnan to Guangdong EHVDC converter stations ice melting scheme [J]. Southern Energy Construction,2017,4(3):131-135.
    [8]
    赵晓斌,黄莹,黎小林,等. 云广直流输电工程接地极线路绝缘水平优化 [J]. 南方电网技术,2014,8(6):23-26.

    ZHAO X B,HUANG Y,LI X L,et al. Optimization of electrode line insulation level of Yunnan-Guangdong DC transmission project [J]. Southern Power System Technology,2014,8(6):23-26.
    [9]
    张冯硕,吴高波,李健,等. 特高压直流接地极线路绝缘配合研究 [J]. 电力建设,2015,36(2):86-90.

    ZHANG F S,WU G B,LI J,et al. Insulation coordination for UHVDC electrode line [J]. Electric Power Construction,2015,36(2):86-90.
    [10]
    杨庆,赵杰,司马文霞,等. 云广特高压直流输电线路反击耐雷性能 [J]. 高电压技术,2008,34(7):1130-1135.

    YANG Q,ZHAO J,SIMA W X,et al. Lightning back-flashover performance of the Yun-Guang UHV DC transmission lines [J]. High Voltage Engineering,2008,34(7):1130-1135.
    [11]
    单蒙,刘为雄. 基于EMTP的高压输电工程电磁暂态研究 [J]. 南方能源建设,2017,4(1):57-60.

    SHAN M,LIU W X. Research on electromagnetic transient of HV power transmission project based on EMTP [J]. Southern Energy Construction,2017,4(1):57-60.
    [12]
    廖民传,汪晶毅,李志泰,等. 混压同塔多回输电线路绕击建模与评估 [J]. 电网技术,2013,37(9):2547-2552.

    LIAO M C,WANG J Y,LI Z T,et al. Modeling and evaluation of shielding failure for multi-circuit transmission lines in different voltage levels on the same tower [J]. Power System Technology,2013,37(9):2547-2552.
    [13]
    余江,周红阳,王斌. 南方电网直流典型故障的反事故措施方案研究 [J]. 南方电网技术,2009,3(增刊1):62-66.

    YU J,ZHOU H Y,WANG B. Study on anti- accident measures of the typical HVDC faults in China Southern Power Grid [J]. Southern Power System Technology,2009,3(Supp.1):62-66.
    [14]
    李振,余占清,何金良,等. 线路避雷器改善同塔多回线路防雷性能的分析 [J]. 高电压技术,2011,37(12):3120-3128.

    LI Z,YU Z Q,HE J L,et al. Line surge arrester improving lighting protection performance of transmission lines with multi-circuits in a tower [J]. High Voltage Engineering,2011,37(12):3120-3128.
    [15]
    王剑,万帅,陈家宏,等. 三峡—上海±500 kV同塔双回直流输电用线路避雷器的雷电防护效果分析 [J]. 高电压技术,2013,39(2):450-456.

    WANG J,WAN S,CHEN J H,et al. Analysis of lighting protection with line surge arrester for the Three Gorges-Shanghai ±500 kV double-circuit DC transmission line on the same tower [J]. High Voltage Engineering,2013,39(2):450-456.
    [16]
    朱岸明,杨大渭,刘云贺,等. FRP复合材料杆塔横担研究应用现状及分析 [J]. 电网与清洁能源,2015,31(10):76-82+88.

    ZHU A M,YANG D W,LIU Y H,et al. Application and analysis of cross arms made from FRP composite materials in transmission towers [J]. Power System and Clean Energy,2015,31(10):76-82+88.
    [17]
    左玉玺,薛更新,孙强,等. 750 kV输电线路复合横担设计研究 [J]. 电网与清洁能源,2013,29(1):1-8.

    ZUO Y X,XUE G X,SUN Q,et al. Research on the design of composite cross arm for 750 kV transmission line [J]. Power System and Clean Energy,2013,29(1):1-8.
    [18]
    中国国家标准化管理委员会. 1 000 kV特高压交流输变电工程过电压和绝缘配合:GB/Z 24842—2009 [S]. 北京:中国标准出版社,2009.
  • Related Articles

    [1]YANG Ziye, WANG Mengwei, KUANG Chunlin, SHI Weiguo, HE Chang. Wind-Induced Vibration Response and Weak Locations of 110 kV Diverging Branch Rods Under Strong Wind[J]. SOUTHERN ENERGY CONSTRUCTION, 2025, 12(2): 48-57. DOI: 10.16516/j.ceec.2024-328
    [2]ZHOU Qi, WANG Zhenhua. Research Progress on Wind-Induced Collapse of Transmission Towers[J]. SOUTHERN ENERGY CONSTRUCTION, 2024, 11(6): 59-68. DOI: 10.16516/j.ceec.2024.6.06
    [3]LIN Wangyong, CHEN Yin, ZHANG Hua. Wind-Induced Response Analysis of 1 000 kV Lattice Independent Lightning Protection Tower[J]. SOUTHERN ENERGY CONSTRUCTION, 2022, 9(S2): 68-73. DOI: 10.16516/j.gedi.issn2095-8676.2022.S2.011
    [4]Biao LI, Jie ZHANG, Lei YU, Jingyi WANG, Yandong WANG. Influence Research on Induced Voltage of Multi UHVDC Transmission Lines to the Power Line Under Construction in the Same Corridor[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(2): 64-69. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.012
    [5]Xianghai TAO, Guodong HUANG, Siyan JIANG. Research on the Reinforcement Technique for Typhoon-induced Disaster of the Reserved Transmission Tower-line[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(4): 95-99,94. DOI: 10.16516/j.gedi.issn2095-8676.2017.04.018
    [6]Guobin QIU, Jingyi WANG, Panwang LIANG, Yandong WANG. Influence Research on Induced Voltage and Current of Multi AC Transmission Lines to the Power Line Under Construction in the Same Corridor[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(4): 76-81. DOI: 10.16516/j.gedi.issn2095-8676.2017.04.015
    [7]Wei XU, Minchuan LIAO, Zhiyuan ZHENG, Jingyi WANG. Research on Lightning Overvoltage of 500 kV Submarine Cable Lines[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(2): 62-66. DOI: 10.16516/j.gedi.issn2095-8676.2016.02.012
    [8]ZHANG Canheng, WANG Xin, ZHENG Wentang. Assessment of Rainstorm-induced Shallow Landslide Hazard with Hydrodynamic Model[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 198-202. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.044
    [9]ZHANG Qingli. Switching Overvoltage Simulation Analysis and ComparisionBetween Matlab/SPS and EMTP[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 35-37,92. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.008
    [10]Zhifang ZHU, Yongxia HAN, Yuxin LU, Licheng LI. Simulation Analysis of Influence of DC Protection on the Overvoltage and Insulation Coordination of ±800 kV UHVDC Converter Stations[J]. SOUTHERN ENERGY CONSTRUCTION, 2014, 1(1): 50-56. DOI: 10.16516/j.gedi.issn2095-8676.2014.01.009
  • Cited by

    Periodical cited type(2)

    1. 颜子威,龚有军,葛恒. 特高压直流、交流与接地极线路同塔防雷研究. 电力勘测设计. 2024(12): 56-62 .
    2. 颜子威,龚有军,何智文. ±800 kV特高压直流输电线路雷电性能及防护措施研究. 南方能源建设. 2023(02): 110-118 . 本站查看

    Other cited types(0)

Catalog

    Junxiang LIU

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (368) PDF downloads (28) Cited by(2)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return