Chuangshu XIE. Design and Setting of Zero-sequence Current Differential Protection for Transformers in Nuclear Power Plants[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 74-80. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.013
Citation: Chuangshu XIE. Design and Setting of Zero-sequence Current Differential Protection for Transformers in Nuclear Power Plants[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 74-80. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.013

Design and Setting of Zero-sequence Current Differential Protection for Transformers in Nuclear Power Plants

More Information
  • Received Date: November 04, 2015
  • 1 000 MW nuclear power unit's main transformer usually consists of three 500 kV single-phase transformers, single-phase ground fault is one of the main fault types, and zero-sequence current differential protection is the main protection against single-phase ground fault. Currently the protection principle for zero-sequence current differential protection device is mainly rate restraint differential protection, however, the differences still exists between technical details, the calculation methods for protection settings and the adaptabilities to the current transformer configuration are also different. In this paper, considering two different types of zero-sequence current differential protection principle, by analyzing the different situations they adopt to, it proposed a design of nuclear power plant main transformer's zero-sequence current differential protection and its protection setting calculation
  • [1]
    王维俭. 变压器保护运行不良的反思 [J]. 电力自动化设备,2001,21(10):1-3.

    WANG Weijian. Consideration on the Improper Operation of Transformer Protection [J]. Electric Power Automation Equipment,2001,21(10):1-3.
    [2]
    DL/T 684—2012,大型发电机变压器继电保护整定计算导则 [S]. 北京:中国电力出版社,2012.

    DL/T 684—2012,Guide of Calculating Settings of Relay Protection for Large Generator and Transformer [S]. Beijing:China Electric Power Press,2012.
    [3]
    GB/T 50958—2013,核电厂常规岛设计规范 [S]. 北京:中国计划出版社,2013.

    GB/T 50958—2013,Code for Design of Conventional Island for Nuclear Power Plant [S]. Beijing:China Planning Press,2013.
    [4]
    王维俭,桂林,王祥珩. 主设备保护若干问题的商榷 [J]. 电力系统自动化,2001(12):58-61.

    WANG Weijian, GUI Lin, WANG Xiangheng. Discussion on Some Problems Existing in the Main Equipment Protection [J]. Automation of Electric System,2001(12):58-61.
    [5]
    毛锦庆,屠黎明,邹卫华. 从加强主保护简化后备保护论变压器微机型继电保护装置 [J]. 电力系统自动化,2005,29(18):1-6,18.

    MAO Jinqing, TU Limin, ZOU Weihua. Discussion on The Digital Transformer Protection from The Standpoint of Strengthening Main Protection and Simplifying Backup Protection [J]. Automation of Electric System,2005,29(18):1-6,18.
    [6]
    GB/T 14285—2006,继电保护和安全自动装置技术规程 [S]. 北京:中国标准出版社,2006.

    GB/T 14285—2006,Technical Code for Relaying Protection and Security Automatic Equipment [S]. Beijing:China Standard Press,2006.
    [7]
    王维俭,桂林. 主设备保护技术发展的回顾与前瞻 [J]. 电力系统保护与控制,2008,36(12):5-7.

    WANG Weijian, GUI Lin. Review and Prospect of Technology Development of Protection for Electric Main Equipment [J]. Power System Protection and Control,2008,36(12):5-7.
    [8]
    DL/T 866—2004,电流互感器和电压互感器选择及计算导则 [S]. 北京:中国电力出版社出版,2004.

    DL/T 866—2004,Guide for Selection and Calculation of Current Transformers and Voltage Transformers [S]. Beijing:China Electric Power Press,2004.
  • Related Articles

    [1]Jinsheng LIU, Lei ZHANG, Zhenjie ZHAO. Research on the Methods of Gridding Reliability Object Setting for Distribution Network[J]. SOUTHERN ENERGY CONSTRUCTION, 2022, 9(1): 109-114. DOI: 10.16516/j.gedi.issn2095-8676.2022.01.016
    [2]Zijun LIU, Longxing JIN, Rui YU, Yongwen CHEN, Fei CAO. Research and Application of Busbar Protection Based on Multidimensional Virtual Current Differential[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(S1): 54-57. DOI: 10.16516/j.gedi.issn2095-8676.2019.S1.011
    [3]ZHANG Minghan, LU Zikai. Analysis of the Application of Current Transfomer in Low-voltage Flexible DC Microgrid[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(4): 131-136. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.021
    [4]Ming ZHENG, Yuan YANG, Yun SHEN, Xiaoyan XU, Yan TAO. Research on the Standby Diesel Generator Set Scheme of Offshore Wind Farm in the State of Island Operation Mode[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(1): 24-30. DOI: 10.16516/j.gedi.issn2095-8676.2019.01.005
    [5]LIN Rui, HUANG Xudan, XIAO Huanhui. VFTO Calculation and Analysis of the New Interconnecting Transformer in a Nuclear Power Station[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 55-60. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.013
    [6]Xiaotong HUANG, Xuefeng WANG, Hongyuan WEN, Yurong LI, Jianquan ZHU. Calculation and Restriction of Short-circuit Current in the Loop-closed Operation of Nansha Distribution Network[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(2): 122-126. DOI: 10.16516/j.gedi.issn2095-8676.2016.02.024
    [7]Yanfang SHI. Design and Calculation of the Synthetic Foam Spray System for Transformers Protection[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(2): 107-112. DOI: 10.16516/j.gedi.issn2095-8676.2016.02.021
    [8]HE Jian. Coordination of the Active Saturated Iron-core Superconductive Fault Current Limiters with Zero-sequence Current Protection of Transmission Lines[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 30-34. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.007
    [9]Wentang ZHENG, Xiaojiu CHENG. Settlement Calculation and Analysis of a Nuclear Island Foundation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 116-122,127. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.021
    [10]Yun ZHAO, Ming ZHENG, Jianwei ZHENG. Selection of Main Transformer Cooling System in Offshore Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(3): 91-94. DOI: 10.16516/j.gedi.issn2095-8676.2015.03.018
  • Cited by

    Periodical cited type(0)

    Other cited types(1)

Catalog

    Chuangshu XIE

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (462) PDF downloads (22) Cited by(1)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return