Design Optimization and Procurement Cost Control of EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2016.S1.037
  • Received Date: 2016-09-08
  • Publish Date: 2020-07-17
  • EPC projects focus optimization management. This paper addresses procurement and design cost control in project management, identify the critical points and risk points in this perspective and analyzes them. This paper describes the critical points and risk points in the process of design optimization management, and analyzes the essential points from the perspectives of contract management and risk management. Meanwhile, this paper emphasizes the importance of taxation planning in controlling the procurement cost. The role and initiative of the design team are critical to design optimization. An optimization group is set up to address the issues related to the benefits of concerned parties in the process of project execution. The contract is the embodiment of contract spirit, as well as the most effective means of binding on concerned parties of the project. Design management and procurement management are the focuses of project execution, as well as the hardest part of the project execution. To plan well is the prerequisite of all the later tasks.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(143) PDF downloads(33) Cited by()

Related

Design Optimization and Procurement Cost Control of EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2016.S1.037

Abstract: EPC projects focus optimization management. This paper addresses procurement and design cost control in project management, identify the critical points and risk points in this perspective and analyzes them. This paper describes the critical points and risk points in the process of design optimization management, and analyzes the essential points from the perspectives of contract management and risk management. Meanwhile, this paper emphasizes the importance of taxation planning in controlling the procurement cost. The role and initiative of the design team are critical to design optimization. An optimization group is set up to address the issues related to the benefits of concerned parties in the process of project execution. The contract is the embodiment of contract spirit, as well as the most effective means of binding on concerned parties of the project. Design management and procurement management are the focuses of project execution, as well as the hardest part of the project execution. To plan well is the prerequisite of all the later tasks.

ZHANG Yu, HU Liang. Design Optimization and Procurement Cost Control of EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 165-167,185. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.037
Citation: ZHANG Yu, HU Liang. Design Optimization and Procurement Cost Control of EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 165-167,185. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.037