YU Haibo. Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 177-179. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040
Citation: YU Haibo. Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 177-179. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040

Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040
  • Received Date: 2016-07-01
  • Publish Date: 2020-07-17
  • Regarding to the management in oversea thermal power plant EPC project, based on the requirement of management, this letter analyze the interface with other department or unit and their information input or requirement firstly; then describe the function in the process of procurement management, finally elaborate the key point for coding system in the information construction.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(147) PDF downloads(145) Cited by()

Related

Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040

Abstract: Regarding to the management in oversea thermal power plant EPC project, based on the requirement of management, this letter analyze the interface with other department or unit and their information input or requirement firstly; then describe the function in the process of procurement management, finally elaborate the key point for coding system in the information construction.

YU Haibo. Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 177-179. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040
Citation: YU Haibo. Regarding to Equipment and Material Management Process and Informatization Analysis in Oversea Thermal Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 177-179. doi: 10.16516/j.gedi.issn2095-8676.2016.S1.040

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return