DU Dongming,SI Guangquan,WANG Mo,et al.Research on Adding Post-unit for Back Pressure Steam Turbine[J].Southern Energy Construction,2021,08(02):63-70. doi:  10.16516/j.gedi.issn2095-8676.2021.02.010
Citation: DU Dongming,SI Guangquan,WANG Mo,et al.Research on Adding Post-unit for Back Pressure Steam Turbine[J].Southern Energy Construction,2021,08(02):63-70. doi:  10.16516/j.gedi.issn2095-8676.2021.02.010

Research on Adding Post-unit for Back Pressure Steam Turbine

doi: 10.16516/j.gedi.issn2095-8676.2021.02.010
  • Received Date: 2021-03-11
  • Rev Recd Date: 2021-05-14
  • Publish Date: 2021-06-25
  •   Introduction  In order to solve the problem of changing the external steam supply of the unit from industrial steam to heating steam , a thermal power plant is taken as an object to carry out technical feasibility study.  Method  Four kinds of schemes including the control valve group, the two-cylinder steam turbine, the post-unit back pressure steam turbine shared by the whole plant, and the steam-driven feed water pump unit with generator were compared and analyzed.  Result  Considering the characteristics of the schemes and project practice, the scheme of post-unit back pressure steam turbine shared by the whole plant is selected.  Conclusion  The scheme is based on the principle of energy level cascade utilization, which is reliable in operation and economical. It also provides a useful reference for the comprehensive steam supply transformation of subsequent units.
  • [1] 黎林村. 热电厂采暖供热方案优化研究 [J]. 区域供热,2016(5):71-74+95.

    LIL C . Study on optimization of heating schemes in thermal power plants [J]. District Heating,2016(5):71-74+95.
    [2] 李辉,杨立辉. 工业及采暖热负荷同时需求的350 MW超临界供热机组装机方案研究 [J]. 能源工程,2014(4):67-70.

    LIH,YANGL H . Study on installing project of 350 MW supercritical unit based on industrial and heating load demand [J]. Energy Engineering,2014(4):67-70.
    [3] 中华人民共和国住房和城乡建设部. 小型火力发电厂设计规范:GB 50049—2011 [S]. 北京:中国计划出版社,2011.

    Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Code for design of small fossil fired power plant:GB 50049—2011 [S]. Beijing:China Planning Press,2011.
    [4] 王东雷,张鹏,霍沛强. 采用再热温度630 ℃的1 000 MW新一代超超临界二次再热机组可行性研究 [J]. 南方能源建设,2018,5(3):33-41.

    WANGD L. ZHANG P,HUO P Q. Feasibility study on 1 000 MW new generation ultra-supercritical unit with double re-heating cycles at 630 ℃ [J]. Southern Energy Construction,2018,5(3):33-41.
    [5] 李冰天. 1 000 MW超超临界EC-BEST二次再热机组经济性分析 [J].热能动力工程,2018,33(11):36-41+63.

    LIB T. Economic analysis of 1000 MW ultra supercritical EC-BEST secondary reheat unit [J]. Journal of Engineering for Thermal Energy and Power,2018,33(11):36-41+63.
    [6] 杨洋. 直接空冷15 MW给水泵汽轮机热力设计 [J]. 电站系统工程,2018,34(4):36-38.

    YANGY. Design of 15 MW feedwater pump for direct air-cooling unit [J]. Power System Engineering,2018,34(4):36-38.
    [7] 高展羽,黄峭,王建伟,等. 回热驱动式背压机设计难点探讨 [J]. 东方电气评论,2020,34(4):38-42.

    GAOZ Y,HUANGX,WANGJ W,et al. Discussion on the starting operation scheme of regenerative drive type steam turbine [J]. Dongfang Electric Review,2020,34(4):38-42.
    [8] 赵维印. 调速技术与设备节能改造 [J]. 设备管理与维修,2016(1):106-109.

    ZHAOW Y. Speed control technology and equipment energy saving transformation [J]. Plant Maintenance Engineering,2016(1):106-109.
    [9] 于凤新. 一种新型双背压汽轮机供热系统设计 [J]. 电力勘测设计,2020(9):19-23.

    YUF X. Design of heating supply system in a new dual back-pressure steam turbine [J]. Electric Power Survey & Design,2020(9):19-23.
    [10] 崔利,段远光,曹志刚,等. 背压式汽动引风机控制的优化设计 [J]. 热力发电,2014,43(6):119-123.

    CUIL. DUAN Y G. CAO Z G,et al. Design optimization for control strategy of a backpressure steam-driven induced draft fan [J]. Thermal Power Generation,2014,43(6):119-123.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Figures(4)  / Tables(7)

Article Metrics

Article views(256) PDF downloads(52) Cited by()

Related

Research on Adding Post-unit for Back Pressure Steam Turbine

doi: 10.16516/j.gedi.issn2095-8676.2021.02.010

Abstract:   Introduction  In order to solve the problem of changing the external steam supply of the unit from industrial steam to heating steam , a thermal power plant is taken as an object to carry out technical feasibility study.  Method  Four kinds of schemes including the control valve group, the two-cylinder steam turbine, the post-unit back pressure steam turbine shared by the whole plant, and the steam-driven feed water pump unit with generator were compared and analyzed.  Result  Considering the characteristics of the schemes and project practice, the scheme of post-unit back pressure steam turbine shared by the whole plant is selected.  Conclusion  The scheme is based on the principle of energy level cascade utilization, which is reliable in operation and economical. It also provides a useful reference for the comprehensive steam supply transformation of subsequent units.

DU Dongming,SI Guangquan,WANG Mo,et al.Research on Adding Post-unit for Back Pressure Steam Turbine[J].Southern Energy Construction,2021,08(02):63-70. doi:  10.16516/j.gedi.issn2095-8676.2021.02.010
Citation: DU Dongming,SI Guangquan,WANG Mo,et al.Research on Adding Post-unit for Back Pressure Steam Turbine[J].Southern Energy Construction,2021,08(02):63-70. doi:  10.16516/j.gedi.issn2095-8676.2021.02.010
  • 某热电厂新建2×50 MW级抽汽背压汽轮发电机组。汽轮机为高温高压、单缸、单轴、调整抽汽背压式,机组对外工业供热,分为4.1 MPa.a中压和1.4 MPa.a低压两个等级,分别来自汽机抽汽及排汽。锅炉为高温高压自然循环、单汽包、Π型布置、全钢构架悬吊结构锅炉。主蒸汽系统采用切换母管制;锅炉给水系统为扩大单元制,每台机组设置一台汽动给水泵,两台高压加热器,全厂共用一台备用电动给水泵;给水泵汽轮机为背压式,背压排汽进入热网加热器蒸汽系统;汽轮机回热系统设置两台高压加热器、一台除氧器。

    项目执行期间,由于外部条件变化,机组由工业供热改为采暖供热。而此时汽机厂已经完成了汽轮机本体设计,汽缸、阀门等大型铸锻件毛坯已经转入精加工流程,汽轮机本体结构已经不具备修改的条件。为最大程度降低对工程的影响,在满足采暖供热参数要求的前提下,维持现有背压汽轮机的参数不变,考虑通过增加额外系统实现对外供热的蒸汽参数需求。

    本文针对50 MW级汽轮机维持背压工况运行的条件,在最大程度保留既有工程方案的同时,基于能量梯级利用原则1,对背压汽轮机组增设后置汽轮机发电系统进行研究,结合方案的适应性、经济性以及工程实际,最终推荐全厂共用的后置背压汽轮机方案。本文研究成果可为后续机组进行供热综合改造提供有益的参考。

  • 现有50 MW级背压汽轮发电机组的额定参数见表1

    项 目参数
    主汽阀前压力/MPa.a10
    主汽阀前温度/℃565
    进汽流量/(t·h-1490
    工业抽汽压力/MPa.a4.1
    工业抽汽流量/(t·h-1100
    排汽压力/MPa.a1.4
    排汽供热流量/(t·h-1244.313
    机组功率/MW53.872

    Table 1.  Parameters of 50 MW back-pressure turbo-generator set

    原工业供汽条件下的系统配置为:50 MW级抽汽背压汽轮机的排汽作为给水泵汽轮机的驱动汽源、二号高压加热器的加热汽源、定压内置式除氧器的加热汽源;50 MW级抽汽背压汽轮机的非调整抽汽为一号高压加热器的加热汽源;给水泵汽轮机的排汽接入热网加热器蒸汽管道。采暖供热系统设置两台热网加热器,两台变频电动热网循环泵,一台30 m3热网疏水箱,两台疏水泵,一台热网循环水滤水器,一台疏水扩容器。

    经核实主机、辅机生产情况,仅有50 MW级抽汽背压汽轮机进入制造流程,包括汽缸、阀门等大型铸锻件毛坯已转入精加工流程,汽轮机本体结构已经不具备修改的条件。汽轮机的辅机、发电机及其辅机均未投入制造,具备修改条件。

    原4.1 MPa.a工业抽汽系统,在汽轮机抽汽管道上安装安全阀、快关阀、止回阀、闸阀后封堵,中压抽汽改为预留管道接口。汽轮机原有的额定排汽压力1.4 MPa.a相对采暖蒸汽压力0.3 MPa.a过高,须通过必要的对外做功或者减压调节2,使得蒸汽参数满足采暖系统的要求。基于50 MW级抽汽背压汽轮机本体保留,按照纯背压方式运行,维持1.4 MPa.a的排汽,提出四种可行方案,满足0.3 Mpa.a的采暖蒸汽参数要求,包括调节阀组方案、双缸汽轮机方案、全厂共用的后置背压汽轮机方案、单元制带发电机的汽动给水泵组方案等。通过对四种方案的综合技术经济比较,选择现阶段最合适的方案。

  • 本方案主要通过设置调节阀组,将1.4 MPa.a的蒸汽减压至0.3 MPa.a,系统图如图1所示。新增部分包含全厂共用的一套供热蒸汽联箱,和三套调节阀组。两台50 MW级背压汽轮机的排汽在供热蒸汽联箱汇合,降压后的蒸汽接入热网加热器蒸汽管路。因为调节阀门组将长期运行,调节阀门组共设置3×50%容量,两套运行,一套备用3。布置上需要考虑调节阀组、供热蒸汽联箱及相应的连接管道的空间。

    Figure 1.  System diagram of control valves group proposal

    由于取消了50 MW级抽汽背压汽轮机的工业抽汽,现有50 MW级背压汽轮机的排汽供热流量变为345 t/h,背压汽轮发电机组的出力变为60.284 MW。机组匹配的发电机型号需从50 MW等级增大为60 MW等级,发电机的辅机相应调整。

  • 本方案主要通过增加背压式汽轮机对外做功,将1.4 MPa.a的蒸汽减压至0.3 MPa.a,系统图如图2所示。新增部分包含两套背压汽轮机系统。考虑到50 MW级汽轮机的辅机,配套的发电机及其辅机尚未制造,可将50 MW级背压汽轮机作为双缸汽轮机的“高压缸”,每台50 MW级汽轮机后设置1台同轴的背压式汽轮机作为“低压缸”。“高压缸”的排汽直接与“低压缸”的进汽相连,联通管道上设置必要的隔离阀等,类似常规中低压缸联通管的连接方式。该方案称为“双缸汽轮机”方案,汽轮发电机组的连接方式为“高压缸-低压缸-发电机”,新增的背压式汽轮机的额定参数见表2

    Figure 2.  System diagram of two-cylinder steam turbine proposal

    项 目参数
    进汽压力/MPa.a1.4
    进汽温度/℃310
    进汽流量/(t·h-1345
    排汽压力/MPa.a0.3
    排汽温度/℃153.6
    排汽流量/(t·h-1345
    功率/MW25.9

    Table 2.  Parameters of added back pressure turbine

    由于双缸背压汽轮发电机组的出力增大到86.184 MW,机组匹配的发电机型号需从50 MW等级增大为85 MW等级,发电机的辅机相应调整。新增背压式汽轮机的双缸汽轮机方案,全厂总计2台85 MW级汽轮发电机组。

    汽轮发电机组由“单缸汽轮机”变为“双缸汽轮机”后,制造厂相当于开发新机型,机组的设计、制造、试验等周期比可避免要加长。“双缸汽轮机”未改变现有50 MW级背压汽轮机的结构、进汽及排汽参数,因此50 MW级背压汽轮机的叶片强度,缸体强度影响有限。但是机组的轴系加长后,需要制造厂解决轴系推力平衡、转子双振幅相对振动值、转子轴承振动值在各种工况下均满足要求的问题。其他需要修改的系统包括:

    1)汽轮机、发电机辅机:轴封蒸汽冷却器、润滑油集装油箱、疏水扩容器、疏水箱、疏水泵等均需要按照“双缸汽轮机”增大选型。按照增大的辅机用水量修改冷却水的系统,满足辅机设备的冷却要求。

    2)排汽系统:“双缸汽轮机”的排汽接入热网加热器蒸汽管道,排汽管道上依次安装安全阀、逆止阀、隔离阀。

    3)控制系统:新增背压汽轮机纳入单元DCS进行监控。

    4)电气系统:相应电气设备等均按照85 MW级汽轮发电机组修改选型。

    布置上需要考虑“单缸汽轮机”改为“双缸汽轮机”后,主机长度增加后,汽轮机发电机组的基座长度随之增加;辅机系统设备及相连接的管道的空间需求均增加。

    由于本工程原按照2×50 MW级机组进行电网接入及项目审批,本方案使得工程装机增大为2×85 MW级机组,本方案涉及到电网接入系统的重新批复和工程的重新审批。

  • 本方案主要通过增加单独的背压式汽轮机对外做功,将1.4 MPa.a的蒸汽减压至0.3 MPa.a,系统图如图3所示。新增部分包含一套全厂共用的后置背压汽轮机发电机组,一套全厂共用的供热蒸汽联箱,二套调节阀组。该共用的背压式汽轮机按照3 000转/分定速运行,同轴驱动单独的发电机发电。由于共用的背压式汽轮机是采暖供热的唯一汽源,设置一套全厂共用的供热蒸汽联箱及配套调节阀,作为采暖供热的备用系统;汽源接自两台50 MW级背压式汽轮机的排汽;联箱下游设置2×50%容量的减压调节阀组,接入热网加热器蒸汽管道。新增的全厂共用的后置背压汽轮机的排汽接入热网加热器蒸汽管道,排汽管道上依次安装安全阀、逆止阀、隔离阀。全厂共用的后置背压汽轮机参数见表3

    Figure 3.  System diagram proposal of the Post-unit back pressure steam turbine shared by the whole plant

    项目参数
    进汽压力/MPa.a1.4
    进汽温度/℃310.0
    进汽流量/(t·h-1690.0
    排汽压力/MPa.a0.3
    排汽温度/℃153.6
    排汽流量/(t·h-1690.0
    功率/MW52.4

    Table 3.  Parameters of post-unit back pressure turbine shared by the whole plant

    新增共用的52.4 MW后置背压汽轮机新增的设备及系统有:

    1)背压汽轮机及其辅机:包括轴封蒸汽冷却器、润滑油集装油箱、疏水扩容器、疏水箱、疏水泵。

    2)发电机及其辅机:包括发电机空气冷却器。

    3)进汽系统:两台50 MW背压式汽轮机的排汽至后置背压汽轮机进汽口之间的管道及阀门。

    4)排汽系统:后置背压汽轮机的排汽接入热网加热器蒸汽管道,排汽管道上依次安装安全阀、逆止阀、隔离阀。

    5)轴封漏汽系统:轴封蒸汽冷却器为表面式热交换器,凝结后置背压汽轮机的轴封漏汽和低压门杆漏汽。轴封蒸汽冷却器采用闭式循环冷却水,疏水接入疏水箱。

    6)疏水系统:后置背压汽轮机单独设置一套疏水系统,配套一台大气式疏水扩容器,一台大气式疏水箱,两台疏水泵。后置背压汽轮机的疏水通过疏水扩容器、疏水箱、疏水泵送入50 MW背压式汽轮机组的除氧器。

    7)冷却水系统:润滑油冷油器、发电机空冷器、轴封冷却器的冷却水采用闭式循环冷却水。考虑单元机组辅助系统运行便利,后置背压汽轮机发电机组配套设置一套新的闭式冷却水系统。

    8)控制系统:新增后置背压汽轮机发电机组纳入公用DCS进行监控。后置背压汽轮机的DEH,与50 MW背压式汽轮机发电机组一致,与DCS统一硬件。后置背压汽轮机发电机组的辅机纳入公用DCS机柜监控,并增加相应配电柜。

    9)电气系统:按照新增的52.4 MW背压汽轮发电机组配套相应的电气设备。

    布置上需要考虑新增一台单独的52.4 MW背压汽轮发电机组的主机、辅机及相连接的管道、仪控、电气等设施的空间需求。

    由于本工程原按照2×50 MW级机组进行电网接入及项目审批,本方案使得工程装机新增1台52.4 MW机组,本方案涉及到电网接入系统的重新批复和工程的重新审批。

  • 本方案借鉴大型燃煤机组“双机回热”系统4的思路,提高机组额定工况及变工况下的技经指标5。每台50 MW背压式汽轮机发电机组配置一台给水泵汽轮机发电系统,通过给水泵汽轮机对外做功,将1.4 MPa.a的蒸汽减压至0.3 MPa.a,增大容量的给水泵汽轮机的排汽接入热网加热器蒸汽管道,排汽管道上依次安装安全阀、逆止阀、隔离阀,系统图如图4所示。新增部分包含调速装置,给水泵汽轮机发电机,一套全厂共用的供热蒸汽联箱,二套调节阀组。汽动给水泵的驱动功率约3.5 MW,将现有的给水泵汽轮机容量增加,其驱动汽源依然来自50 MW背压式汽轮机的排汽,在给水泵汽轮机的主驱动端连接发电机。为了确保给水系统高效调节,采用变速给水泵,给水泵组轴系有如下两种设备配置和电力输出方案:

    Figure 4.  System diagram of proposal of Steam-driven feed water pump unit with generator

    1)方案A:给水泵(变速)—定速(驱动端)/变速(输出端)调速装置—背压式定速小汽轮机—定速小发电机—工频输出到厂网。

    2)方案B:给水泵(变速)—背压式变速小汽轮机—变速(驱动端)/定速(输出端)调速装置—定速小发电机—工频输出到厂网。

    对于方案A,给水泵汽轮机采用常规的30 MW级背压式定速汽轮机,以及常规的25 MW等级50 Hz定速小发电机。3.5 MW等级的定速(驱动端)/变速(输出端)调速装置采用常规的液力耦合调速。系统控制方案为给水泵汽轮机进汽随50 MW背压式汽轮机负荷+给水泵汽轮机进汽门节流调节方式。

    对于方案B,与方案A的区别在于,给水泵汽轮机采用30 MW等级的背压式变速汽轮机6,调速装置为反向的25 MW等级变速(驱动端)/定速(输出端)调速装置。系统控制方案与方案A相同。

    上述两种方案,对给水泵的选型基本无影响,可以沿用常规的给水泵选型。对于30 MW级背压式定速/变速汽轮机,国内主要制造厂家均可以设计、制造7。方案A中的3.5 MW等级的定速(驱动端)/变速(输出端)调速装置,在国内火电领域有较多的应用业绩,技术成熟8。在方案B中,需要用到与常规变速装置不同的反向调速装置,目前成熟产品较少,国内制造厂正针对超超临界二次再热机组“双机回热”系统的需求进行开发。由于本工程变速驱动功率3.5 MW远小于定速驱动功率25 MW,结合调速装置的产品成熟度,现阶段考虑采用方案A的3.5 MW等级的定速(驱动端)/变速(输出端)调速装置。带发电机的背压汽轮机参数如表4所示。

    项目参数
    进汽压力/MPa.a1.4
    进汽温度/℃310
    进汽流量/(t·h-1345
    排汽压力/MPa.a0.3
    排汽温度/℃153.6
    排汽流量/(t·h-1345
    汽轮机总功率/MW29.5
    发电机功率/MW26
    给水泵功率/MW3.5

    Table 4.  Parameters of post-unit back pressure steam turbine with generator

    方案A可使给水泵汽轮机主调阀开至最大,将多余出力全部传输给发电机。但是制造厂需要根据本项目需求开发单独的电液控制系统。在给水泵和发电机侧均加装离合装置9:当汽动给水泵未投入或汽动给水泵故障时,给水泵汽轮机的发电机均可以投入,提高机组经济性;当给水泵汽轮机的发电机故障时,可保证汽动给水泵可以投入,以提高机组稳定性和经济性。鉴于单元制带发电机的汽动给水泵组控制的复杂性,设置一套全厂共用的供热蒸汽联箱及配套调节阀,作为采暖供热的备用系统。

    本方案配套的辅机系统同方案3类似。布置上现有厂房需要增大,以满足单元制带发电机的汽动给水泵组长度增加,以及辅机系统设备及相连接的管道的空间需求增加所需的空间要求。

    由于本工程原按照2×50 MW级机组进行电网接入及项目审批,本方案使得工程装机新增2台26 MW机组,本方案涉及到电网接入系统的重新批复和工程的重新审批。

  • 机组额定供热参数下四个方案的技术参数对比如表5所示。

    项 目方案1方案2方案3方案4
    主汽轮机主蒸汽流量 /(t·h-12×4902×4902×4902×490
    主汽轮机排汽压力 /MPa.a1.40.31.41.4
    主汽轮机发电功率/MW2×60.2842×86.1842×60.2842×60.284
    后置背压机发电功率 /MW1×52.4
    汽动给水泵组发电功率 /MW2×26
    采暖蒸汽压力/MPa.a0.30.30.30.3
    采暖蒸汽温度/℃310153.6153.6153.6
    机组供热功率/MW522466466466
    机组供热量/(GJ·h-11 879.21 677.61 677.61 677.6
    可供采暖面积/hm21 044932932932
    全厂发电功率/MW120.568172.368172.968172.568

    Table 5.  Comparison of technical parameters

    与方案1的调节阀组减压供热方式相比,方案2、3、4均按照能量梯级利用的原则,可以最大限度将热能转化为高品质电能,有利于提高电厂的经济效益;方案1比方案2、3、4增加了对外供热量;方案2、3、4由于不同的汽轮机效率等略有差异,新增的发电功率略有不同。

  • 以原有2×50 MW级机组为基准,对四个方案对于布置的影响对比如表6所示。

    项 目方案1方案2方案3方案4
    全厂主汽轮机组数量/台2222
    全厂给水泵汽轮机组数量/台2222
    全厂后置背压汽轮机数量/台1
    全厂发电机总数量/台2234
    需要增加的建筑物容积/m308 0965 0606 072
    对原有布置格局的影响

    Table 6.  Comparison of layouts

    方案1仅增加调节阀组,对现有布置的影响最小。方案2和方案4均涉及到对既有主要设备的布置改动,包括汽轮发电机基础、汽动给水泵组基础均需要调整;原有主厂房柱位调整;原有管道及辅机需要调整;新增的辅机、管道需要重新布置。对现有布置有较大影响。方案3新增的主机、辅机等均独立于现有设施之外,对原有布置的影响居中。

  • 为了满足采暖供热需求,四个方案必选其一,因此以最简单的方案1为基准,四个方案经济性比较如表7所示。

    项目方案1方案2方案3方案4
    设备等投资/万元基准2 2503 4504 200
    土建费用/万元基准6708201 050
    全厂供热量 /(104 GJ·h-1939.6838.8838.8838.8
    全厂供热收益 /万元54 69448 82648 82648 826
    年供热收益 差额/万元基准-5 868-5 868-5 868
    全厂供电量 /108 kWh5.696 88.273 68.259 28.222 8
    全厂供电收益 /万元21 700.831 516.631 461.731 323.1
    年售电收益 差额/万元基准9 815.89 760.99 622.3
    年维护费用/万元基准4090130
    年收益差额/万元基准3 907.83 802.93 624.3
    回收年限/年基准0.781.181.54
    20年折现值/万元基准49 115.447 796.945 552.2

    Table 7.  Economic comparison

    相比方案1,基于能量梯级利用原则的方案2、3、4,收益均非常可观,按照年利用小时数5 000计算,全厂年收益超过3 600万,1~2年内就可以收回投资,投资回收期短;方案2涉及到主机厂的修改工作量较大,且为全新机型,开发时间会略长,对项目工期有不利影响;方案3对现有主机无影响,后置背压机为成熟机型,运行简单;方案4对现有主机无影响,机型成熟,但运行控制复杂10

    需要说明的是,上述分析是基于本工程特定电价和热价条件下得出的结果,未考虑以热定电或者上网电量总量不变等与本工程不符的约束条件。如工程条件不同,则应基于本文提供的方案和分析方法,结合具体的工程情况进行重新分析,其结论以特定条件下的分析结果为准。

  • 为了解决机组对外供热由工业供热改为采暖供热的问题,调节阀组、双缸汽轮机、全厂共用的后置背压汽轮机、单元制带发电机的汽动给水泵组等四种方案在技术上均是可行的。

    技术方面,调节阀组、全厂共用的后置背压汽轮机方案最为成熟,运行简单可靠,对项目工期影响可控,且对布置的影响相对不大。全厂共用的后置背压汽轮机方案基于能级梯级利用原则,运行经济性好,相比调节阀组方案,年收益多3 802.9万元,1.18年可以收回投资。

    结合工程实际,最终推荐使用方案3的全厂共用的后置背压汽轮机方案,同时完成电网接入系统的重新批复和工程的重新审批。如果工程重新审批和接入系统的重新批复存在现实困难,则只能选择方案1的调节阀组方案。