HUANG Wenhe, ZHONG Xianglan, ZHANG Li. Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 123-127,49. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027
Citation: HUANG Wenhe, ZHONG Xianglan, ZHANG Li. Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 123-127,49. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027

Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer

doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027
  • Received Date: 2015-12-01
  • Circulating water pump house open caisson of a larger thermal power plant is built on a 20~30m depth soft soil layer. Use cement mixing piles under the blade feet for controlling open caisson sinking, and pile cement mixing piles around the open caisson in case water and mud flow into the open caisson. Pump room ground treatment uses rigid pipe pile foundation treatment scheme, at the same time, uses lattice type cement mixing pile to protect pipe pile foundation. This paper introduces the design of large pump house open caisson and controlling sinking in deep soft soil layer in details. It could provide a reference for similar engineering and construction.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(92) PDF downloads(16) Cited by()

Related

Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer

doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027

Abstract: Circulating water pump house open caisson of a larger thermal power plant is built on a 20~30m depth soft soil layer. Use cement mixing piles under the blade feet for controlling open caisson sinking, and pile cement mixing piles around the open caisson in case water and mud flow into the open caisson. Pump room ground treatment uses rigid pipe pile foundation treatment scheme, at the same time, uses lattice type cement mixing pile to protect pipe pile foundation. This paper introduces the design of large pump house open caisson and controlling sinking in deep soft soil layer in details. It could provide a reference for similar engineering and construction.

HUANG Wenhe, ZHONG Xianglan, ZHANG Li. Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 123-127,49. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027
Citation: HUANG Wenhe, ZHONG Xianglan, ZHANG Li. Application Research of Sinking Control of Large Pump House Open Caisson in Deep Thick Soft Soil Layer[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 123-127,49. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.027

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return